Neowin says it's $39.99, but their site says $399.99 after discount. Is Neowin covering the difference? I'll take 7 if they are. Not 8, not 6, never 5, but 7.
Yeah and now they added space above the tab bar, so now I have to painstakingly aim at just slightly below the top of the screen to reach a tab with my mouse.
truly hate it
Question
ultra5219
hello :)
i have problem doing calculations in access for timetable. well im trying to calculate based on my timetable table where total hours of:
-no class
-with class
- total overall hours which is (total no class +total with class)
i did try using datediff function , but still not successful
can anyone tell me or teach me steps by steps how to do based on my database.
Thanks again..
schedule hrs calculate.zip
Link to comment
https://www.neowin.net/forum/topic/1154236-access-2007-calculate-hours/Share on other sites
0 answers to this question
Recommended Posts