Windows 8 Pro Installation, A Question


Recommended Posts

to do an Upgrade you will need to have windows 7 installed. If you prefer to do a full wipe and reinstall you can. however, you need to make sure that is the version you purchased. The upgrade version will not do a full install.

Pro for windows 8 is the equivalent of the Ultimate and Pro editions of 7 you can do an upgrade from ultimate to pro 8 without issue.

to do an Upgrade you will need to have windows 7 installed. If you prefer to do a full wipe and reinstall you can. however, you need to make sure that is the version you purchased. The upgrade version will not do a full install.

Pro for windows 8 is the equivalent of the Ultimate and Pro editions of 7 you can do an upgrade from ultimate to pro 8 without issue.

The upgrade version can do a full install, if you want it to. It can't do a full install from a bare disk, without work arounds, but you can load it in Windows 7, have the installer wipe the disk and install Windows 8 without issue.

I forgot to ask, can I do a clean upgrade install, where I upgrade from Windows 7 but wipe everything in the process so it's like a completely new install of the OS?

Yep, you have the option to wipe the drive clean before the install so long as you run it as an upgrade from 7 from what I've read

Yep, you have the option to wipe the drive clean before the install so long as you run it as an upgrade from 7 from what I've read

That's right. You have three options when you start the upgrade:

1) Keep your files, settings and installed applications

2) Keep your files (and maybe some settings - I can't remember)

3) Perform a clean install.

This last option removes your Windows 7 installation completely.

OP, you could always stick the DVD in your PC and start the upgrade process to confirm all this. The three options above are available at the start of the process and you can back out without doing any harm to your current installation.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • IBM reveals sub-1nm chip technology, production expected in another 5 years by Pradeep Viswanathan TSMC is now leading the chip manufacturing industry with its 2nm-class process node called N2. Samsung Foundry also has a 2nm-class process node called SF2. TSMC says N2 entered volume production in Q4 2025. Samsung says SF2 started mass production in 2025. Today, IBM announced the world’s first sub-1-nanometer chip technology, marking another major semiconductor research milestone. The new technology is based on a 0.7nm, or 7-angstrom, node and uses a new transistor architecture called “nanostack.” The new design vertically stacks and staggers nanosheet-based transistors so that more components can fit into the same chip area while also improving performance and power efficiency. IBM claims that this new sub-1nm chip can pack nearly 100 billion transistors onto a chip the size of a fingernail. This offers almost twice the density, up to 50 percent higher performance, or 70 percent better energy efficiency when compared to IBM's 2nm node design announced back in 2021. Also, IBM mentioned that this new architecture can deliver 40 percent SRAM scaling. It is important to consider that this announcement from IBM is a research milestone rather than a near-term process node launch. Back in 2021, IBM unveiled the world’s first 2nm chip design, claiming 50 billion transistors on a fingernail-sized chip and major performance and efficiency gains. Five years later, IBM’s 2nm technology has still not entered mainstream commercial production. That is because IBM is no longer a major commercial chip manufacturer. It sold its chip manufacturing business to GlobalFoundries years ago and has since then focused only on semiconductor research, IP development, and partnerships. To productize its 2-nm chip technology, IBM partnered with Japan’s Rapidus, but it has not resulted in anything shipping at scale. IBM says that its new sub-1nm technology can reach production as early as within the next five years. If that happens, it will likely depend on manufacturing partners, advanced EUV tooling, and years of yield improvements.
    • It's funny when thieves accuse other thieves of stealing. Ai companies just blatantly siphoned all the knowledge of the internet without consent and are now selling it with their service... so excuse me if I find this a bit ironic.
  • Recent Achievements

    • Week One Done
      Meta Plast earned a badge
      Week One Done
    • First Post
      kinowa earned a badge
      First Post
    • Rookie
      krychek57 went up a rank
      Rookie
    • Grand Master
      Jaybonaut went up a rank
      Grand Master
    • One Year In
      Philsl earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      454
    2. 2
      +Edouard
      170
    3. 3
      PsYcHoKiLLa
      135
    4. 4
      Michael Scrip
      78
    5. 5
      Xenon
      77
  • Tell a friend

    Love Neowin? Tell a friend!