Need help un-bricking my tablet


Recommended Posts

I flashed the Haipad M701-R firmware to my Scroll Tablet (a.k.a Cherrypad) and now can do nothing with it at all except enter download mode, in which FWDN v7 can communicate with the tablet though, and flash other ROMs.

I get no display on the tablet at all, and can not communicate with the tablet with ADB or any other way

Recovery mode is gone,

The only communication I have with the tablet is via FWDN where I can load other "wrong" Roms and Images, and flash them though, but obviously being the wrong boot images it will not boot.

If I could just get a partially working tablet, where ADB can communicate with it again, I can recover it with my backups -

Please could someone link me to the correct files I need to flash to the tablet in order to bring it back from the dead - I have only had this for around 2 months so really would like to get it working again.

update.zip from the site below will not work, as I have no way of flashing it from recovery. I need the correct "lk.rom" for boot image, at the very least for the PC to see it in any other mode than FWDN

Link to my tablet

http://www.storageoptions.com/products/scroll/scroll

Massive thanks to anyone who can help me - I have been on with this since 4am yesterday and am exhausted and completely out of ideas - I have about 200 tabs open in the browser and endless ROMs and zips and rar files all over my desktop, and none of them work.

Link to comment
https://www.neowin.net/forum/topic/976026-need-help-un-bricking-my-tablet/
Share on other sites

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • I made a new Cinematic/Trailer for the game, this will be the intro, still a work in progress!  I also updated the Steam page with a ton of new screenshots! 👀 https://store.steampowered.com/app/3925340/Incoherence_Dark_Rooms/  
    • Closed-loop cooling and a custom 800G network protocol let the $7.3B campus run as one AI training machine. Microsoft confirmed June 23, 2026, that its Fairwater campus in Mount Pleasant, Wisconsin, is fully operational — and the engineering behind it makes the facility something fundamentally different from every data center that came before it. Where conventional cloud infrastructure racks up general-purpose servers and parcels out workloads to each one independently, Fairwater links hundreds of thousands of NVIDIA GB200 Blackwell GPUs into a single, coherent cluster using a two-story building design, 800-gigabit-per-second Ethernet fabric, and a proprietary networking protocol co-developed with OpenAI and NVIDIA. The result, according to Microsoft, is the closest thing to a purpose-built AI supercomputer that any company has ever placed in commercial operation. https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm  
    • Last comment on this article Decades of serving as a global manufacturing hub have allowed China to build a massive talent pool in the production sector that is almost unmatched worldwide. Decades of using "forced labor" have allowed China................. UN experts alarmed by reports of forced labour of Uyghur, Tibetan and other minorities across China https://www.ohchr.org/en/press...ibetan-and-other-minorities
  • Recent Achievements

    • Conversation Starter
      jessse3334 earned a badge
      Conversation Starter
    • Reacting Well
      JuvenileDelinquent earned a badge
      Reacting Well
    • One Month Later
      Excellence2025 earned a badge
      One Month Later
    • Week One Done
      Excellence2025 earned a badge
      Week One Done
    • Week One Done
      flexorcist earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      504
    2. 2
      +Edouard
      208
    3. 3
      PsYcHoKiLLa
      151
    4. 4
      Steven P.
      73
    5. 5
      macoman
      62
  • Tell a friend

    Love Neowin? Tell a friend!