Recommended Posts

15 pages in the original thread is long enough, especially with a slew of upcoming launches.

Thread 1: https://www.neowin.net/forum/topic/991330-spacex-updates-grasshopper-rlv/page__pid__594758226__st__210#entry594758226

First update is the satellite manifest for the second Falcon 9 / Dragon resupply mission to the ISS, preliminarily set for December 15, 2012. The first ISS resupply (CRS1) is tentatively set for August.

I find three particularly interesting; TJSat (the first sat built by a high school), PhoneSat 2.0 (based on an Android 2.1 cell phone) and CubeSst's micro lunar orbiter & lander weighing just 1.33 kg.

Most of these are nano or pico satellites weighing <2 kg, made possible by advances in miniaturization. This is an exploding market segment. Tiny Borg cubes, they are.

Links are to the satellite project page or a PDF.

Launch: NET December 15, 2012

Launcher: Falcon 9 ?(KSC SLC-40)

Primary: Dragon CRS2 (ISS resupply)

Secondaries -

CUSat 1 & 2 (Cornell University)

CubeSat Lunar Orbiter & Lander (!!)

SwampSat (test small sat attitude controls

Black Night 1 (West Point Military Academy)

IPEX/SPA-1 Trailblazer (JPL: Intelligent Payload Experiment & Space Plug & play Architecture)

TetherSat (Naval Academy: test a 1 mile space tether)

TJSat (Thomas Jefferson High School (!!))

DragonSat 1 (Drexel University)

Copper-Cube (Close Orbit Propellant Plume and Elemental Recognition)

PhoneSat 2.0 (based on Android 2.1 phone parts !!)

Link to comment
https://www.neowin.net/forum/topic/1068372-spacex-updates-thread-2/
Share on other sites

2 large pics of the Falcon 9 / Dragon C2/C3 rollout before the wet dressed rehearsal. Note the plastic cover over Dragon, the solar panel outriggers, and the new white room on the transporter / erector.

The final pre-launch clearance evaluation by NASA will take place April 16th, and if everything is good then launch is still set for April 30th. A 10 second hot-fire test of the 9 Merlin engines is to take place a few days before launch.

In other SpaceX news -

The first stage of CRS-1, the first full load ISS resupply mission, is being prepped at the McGregor, Texas test facility for a tentative August 2012 launch - if Dragon C2/C3 goes as expected.

post-347280-0-36842900-1333857962_thumb.

post-347280-0-08140400-1333858002_thumb.

  • Like 1

Could be we have a new SpaceX spaceport - the FAA is doing an assessment.

5 miles South of Port Isabel, Texas, and the FAA has started the permitting process.

Link to FAA PDF....

DEPARTMENT OF TRANSPORTATION

Federal Aviation Administration

Office of Commercial Space Transportation; Notice of Intent to Prepare an

Environmental Impact Statement (EIS), Open a Public Scoping Period, and Conduct a

Public Scoping Meeting

AGENCY: The Federal Aviation Administration (FAA) is the lead Federal agency.

ACTION: Notice of Intent to Prepare an EIS, Open a Public Scoping Period, and

Conduct a Public Scoping Meeting

SUMMARY: This Notice provides information to Federal, State, and local agencies,

Native American tribes, and other interested persons regarding the FAA?s intent to

prepare an EIS for Space Exploration Technologies? (SpaceX?s) proposal to launch the

Falcon 9 and Falcon Heavy orbital vertical launch vehicles from a private site located in

Cameron County, Texas. Under the Proposed Action, SpaceX proposes to construct a

vertical launch area and a control center area to support up to 12 commercial launches per year.

The vehicles to be launched include the Falcon 9, Falcon Heavy (up to two per

year), and a variety of smaller reusable suborbital launch vehicles. SpaceX would be

required to apply for the appropriate launch licenses and/or experimental permits to be

issued by the FAA. The FAA will prepare the EIS in accordance with the National

Environmental Policy Act of 1969 (NEPA; 42 United States Code [u.S.C.] 4321 et seq.),

the Council on Environmental Quality Regulations for Implementing the Procedural

Provisions of NEPA (40 Code of Federal Regulations [CFR] parts 1500-1508), and FAA

Order 1050.1E, Change 1, Environmental Impacts: Policies and Procedures, as part of its

licensing and permitting process.

>

>

Proposed Action

The Proposed Action is for the FAA to issue launch licenses and/or experimental permits

to SpaceX that would allow SpaceX to launch the Falcon 9 and Falcon Heavy orbital

vertical launch vehicles and a variety of reusable suborbital launch vehicles from a

launch site on privately-owned property in Cameron County, Texas. The Falcon 9 orbital

vertical launch vehicle is a medium-lift class launch vehicle with a gross lift-off weight of

approximately 1,000,000 pounds (lbs) with a maximum length of 230 feet (ft). The

Falcon 9 uses liquid oxygen (LOX) and highly refined kerosene, also known as rocket

propellant-1 or refined petroleum-1 (RP-1), as propellants to carry payloads into orbit.

The Falcon Heavy is similar to the Falcon 9, except it has an additional two boosters

?strapped on,? each booster being almost identical to the Falcon 9 first stage core. The

Falcon Heavy is a heavy lift class launch vehicle with a gross lift-off weight of

approximately 3,400,000 lbs. It has an overall maximum length of approximately 230 ft.

A reusable suborbital launch vehicle could consist of a Falcon 9 Stage 1 tank with a

maximum propellant (RP-1 and LOX) load of approximately 6,900 gallons.

As part of the Proposed Action, SpaceX proposes to construct a vertical launch area and a

control center area. The proposed vertical launch area site is currently undeveloped and

is located directly adjacent to the eastern terminus of Texas State Highway 4 (Boca Chica

Boulevard) and approximately 3 miles north of the Mexican border on the Gulf Coast. It

is located approximately 5 miles south of Port Isabel and South Padre Island. At the

vertical launch area, the new facilities required would include: an integration- and

processing-hangar, a launch pad and stand with its associated flame duct, propellant

storage and handling areas, a workshop and office area, and a warehouse for parts

storage.

The control center area would be located inland to the west of the vertical launch area and

would include: a control center building and a payload processing facility; it might also

include a launch vehicle preparation hangar and satellite fuels storage. All facilities

would be constructed on private land owned or leased by SpaceX. The development of

access and supporting utility infrastructure for the vertical launch area and the control

center area may occur on lands outside that which is owned or leased by SpaceX.

Operations would consist of up to 12 launches per year with a maximum of two Falcon

Heavy launches. All Falcon 9 and Falcon Heavy launches would be expected to have

commercial payloads, including satellites or experimental payloads. In addition to

standard payloads, the Falcon 9 and Falcon Heavy may also carry a capsule, such as the

SpaceX Dragon capsule. All launch trajectories would be to the east over the Gulf of

Mexico.

>

>

SpaceX%20Texas%20Spaceport%203-640.jpg

SpaceX%20Texas%20Spaceport%201-640.jpg

phew, was sure i missed out on the upcoming launch because i remember it was scheduled for March before i took a long leave of absence from neowin! Thanks for the updates as always Doc, so April 30? This is unmanned Dragon to low orbit, right? or will she dock with ISS for this one?

It depends on the status of the flight, which is a merged C2 and C3 mission. This was done to get it operational ASAP and accelerate the DragonRider crewed version.

In the C2 phase they will go to ISS altitude but not approach it. There they'll test out the systems, do some maneuvers to check its avionics, safety systems etc.

If that goes well then the C3 phase starts and goes to ISS and berth with about 1,200 kg of cargo. It'll spend about 21 days there then return with about 1,400 kg of return cargo, landing in the Pacific off California.

The Dragon hasn't tested propulsive landing yet because the SuperDraco thrusters are still under development. SuperDraco has been fired many times, and there are video's on YouTube, so much of the work is lightening & optimizing it They are due to be presented to NASA for launch escape use until ~May 25, and once integrated and tested for that the landing tests can start.

The F9 stage landing tests are the Grasshopper program, and the pad for those is under construction in McGregor Texas. It should be almost done as the last Google Earth satellite photos ~4 months ago showed the earthwork well underway. They'll test the first stage first, short tethered hops first, then higher & supersonic. The FAA clearance documents predicted a 3 year development.

While all this is going on they are also building the first Falcon Heavy for shipment to Vandenberg around the end of the year, and there are ~ 8-9 Dragons and several Falcon 9's in various stages of construction. They are also developing 2-3 new engines, one to debut early next year and a Falcon Heavy test stand. Full plate.

SpaceX Dragon Demonstration Flight Coverage on NASA Television (all times Eastern)

?

Watch NASA TV

May 6, Sunday

1:00 p.m. ? SpaceX/Falcon 9 Dragon Pre-Launch Briefing ? KSC (All Channels)

May 7, Monday

8 a.m. ? SpaceX/Falcon 9 Dragon Launch Coverage Begins ? KSC (Launch scheduled at 9:38 a.m. EDT; All Channels)

11 a.m. ? SpaceX/Falcon 9 Dragon Post-Launch Briefing ? KSC (All Channels)

May 8, Tuesday

11 a.m. ? ISS Update ? JSC (All Channels)

May 9, Wednesday

11 a.m. ? ISS Update ? JSC (All Channels)

May 10, Thursday

2:30 a.m. ? SpaceX/Dragon ISS Fly-Under Demonstration Test Coverage ? JSC (All Channels)

10 a.m. ? SpaceX/Dragon Mission Status Briefing ? JSC and Hawthorne, CA (All Channels; time subject to change)

11 a.m. ? ISS Update ? JSC (All Channels)

May 11, Friday

2 a.m. ? SpaceX/Dragon ISS Grapple and Berthing Coverage ? JSC (All Channels; grapple scheduled at 8:30 a.m. EDT, berthing no earlier than 12 p.m. EDT; times subject to change)

1 p.m. ? SpaceX/Dragon Mission Status Briefing ? JSC and Hawthorne, CA (All Channels; time subject to change)

May 12, Saturday

TBD ? ISS Expedition 31 Crew SpaceX/Dragon Hatch Opening and Ceremony ? JSC (All Channels)

May 14, Monday

TBD ? ISS Expedition 31 SpaceX/Dragon In-Flight Event ? JSC (All Channels

damn it was supposed to be the 30th... my dad's ashes are being launched on the one launching in FL!!!! So you say it's gonna launch on the 7th.. damn that's a long ways away... my mom had to rebook the hotel allready... I will be going down there with her and my sister as well to that launch... grrr I hate how it was postponed... I was broken up about it becuase the 30th was the day my dad died in 2010.... that would have been perfect. this makes me torn up bad inside...

SFN....

>

Launch preparations continued Tuesday while SpaceX and NASA worked on the Dragon's software reviews.

Filling of the Dragon capsule's hypergolic propellant tanks was supposed to be completed Tuesday, according to Kirstin Brost Grantham, a SpaceX spokesperson.

The spacecraft was scheduled to be rotated from a vertical position to a horizontal orientation Thursday and attached to the upper stage of the Falcon 9 launcher inside SpaceX's hangar.

The aerodynamic nose cone is set to be integrated to the forward end of the Dragon capsule Friday.

A brief firing of the Falcon rocket's nine Merlin first stage engines is scheduled for April 30. SpaceX conducts a hotfire test of the Falcon 9's engines before each launch to check their health.

A technical review meeting is planned for Friday, and a SpaceX launch readiness review is set for May 5, according to an official familiar with the Dragon mission.

As currently envisioned, the schedule would make possible a launch attempt May 7, assuming NASA and SpaceX finish software testing.

SpaceX's launch on May 7 is booked on the U.S. Air Force range after the May 3 blastoff of a United Launch Alliance Atlas 5 rocket with a military communications satellite.

>

Wired video interview with Musk -

http://www.wired.com/wiredscience/2012/04/elon-musk-hangout/?utm_source=twitter&utm_medium=socialmedia&utm_campaign=wiredscienceclickthru

A MAJOR takeaway at the end is that if all goes well there will be an announcement late this year or sometime next year of a new family of rockets geared to Mars. The focus right now is ISS, but he has an idea how to pull Mars off. It also sounded like they'll go it alone if they have to.

Let the speculation begin ;)

Hotfire webcast at http://www.spacex.com Monday, April 30 with coverage starting at 2:30 PM ET and the hotfire at 3:00 PM ET. Only 2 seconds this time - flight 1 was 10 sec and flight 2 was 4 sec. Seems they're gaining confidence in the system.

http://spaceref.biz/2012/04/spacex-to-webcast-static-fire.html

Z317.jpg

DragonSpacecraft4-12.jpg

A big pic of Dragon, and another of it being integrated to Falcon 9.

Hotfire still on for Monday and launch for May 10th. This ISS launch window is classified as instantaneous, meaning if they don't hit it exactly the launch has to be rescheduled for the next window.

post-347280-0-02805400-1335581881.jpg

post-347280-0-48111700-1335582023_thumb.

remixed: you father's ashes? please accept my condolences, but do explain?

Doc: thanks for the Wired interview, really awesome, i'm loving Elon more and more, he's the kind of guy we need for this. Together with Planetary Resources, this gives me so much hope (drinks another pint)

Celestis is a company that does space burials... my mom went with them to make my dad's final dream come true. I am very irritated it keeps geting pushed back, as we need to go down there for the event. My mom keeps having to re-book the hotel over and over and she might not get a decent room as a result of this. she also has to call off work and her job is tougher to do that as it's a travelling time sensitive job. This is very unsettling for me becuase I also really need a vacation. My life is pretty much crap right now and I need to get away from the hellhole that my area is for a while. Also the 30th is when my dad died so this is a very tragic and bad time for me... it just seems like so much is hell right now for me and I miss my dad so much. (I am crying so hard typing this BTW I'm in great pain right now as a result of this turbulance and crap)

Thank you neoadorable.

The Falcon 9's engine hot-fire test webcast here: http://www.spacex.com/webcast.php

Coverage starts today April 30, 2012 at 2:30 PM ET / 11:30 AM PT

Falcon 9 / Dragon has been rolled out and is on the pad.

1984x3000 image below - download to see it at its best.

post-347280-0-42340900-1335775966_thumb.

NBC Cosmic Log....

SpaceX fires Falcon's rocket engines

SpaceX conducted a successful test firing of a Falcon 9 rocket's engines on its Cape Canaveral launch pad, one week before its precedent-setting launch to the International Space Station. But it took more than one try.

The initial countdown was halted just 47 seconds before the nine engines were scheduled to start up. SpaceX fixed what it called a "limit that was improperly set" on the flight computer and quickly set up another countdown. The second countdown proceeded smoothly, and the rocket's nine engines fizzed to life for two seconds as expected, at 4:15 p.m. ET today.

"Woohoo, rocket hold-down firing completed and all looks good!!" SpaceX's millionaire founder, Elon Musk, reported in a Twitter update. Meanwhile, company spokeswoman Kirstin Brost Grantham said "engineers will now review data as we continue preparations for the upcoming launch."

This was a full dress rehearsal for SpaceX's second official demonstration flight for NASA. The first demo flight, back in December 2010, sent a gumdrop-shaped Dragon space capsule into orbit for the first time. The second flight, scheduled to lift off as early as May 7, could see the Dragon go all the way to the space station.

>

Sigh -

Another launch delay while NASA and SpaceX continue software tests. NET is now May 10, but we should know an exact date within a few days. Seems SpaceX is programming their VxWorks / Linux systems in C++ while the NASA Mission Control Center (MCC) programmers only speak C and FORTRAN.

Anyhow - from the Elon Musk Associated Press tweet chat -

@elonmusk

-Figuring out new no-earlier-than launch date with NASA. Should know in next few days

-SpaceX is great at making things super light. Tesla is great at mass production & batteries

-5 years max before we fly civilans.

-Am hoping to travel to orbit in about 5 years, beyond in 7 to 10.

-For humanity to have an exciting & inspiring future, we cannot be confined to Earth forever

-Definitely. Long term goal of SpaceX making life multiplanetary.

-Am highly confident that Mars can be self-sustaining without terraforming

-Rally people around the idea of making life multiplanetary with a base on Mars

Finally an official new date, and a nice pic taken during the hot-fire below -

May 19 at 4:55 AM EDT. Night launch!

If this 'instant launch window' is missed the next possible target date is May 22.

New NASA TV schedule -

May 18, Friday

1 p.m. - SpaceX/Falcon 9 Dragon Pre-Launch Briefing - KSC (All Channels)

May 19, Saturday

3:30 a.m. - SpaceX/Falcon 9 Dragon Launch Coverage Begins (Launch scheduled at 4:55 a.m. EDT) - KSC (All Channels)

7:30 a.m. - SpaceX/Falcon 9 Dragon Post-Launch News Conference - KSC (All Channels)

May 21, Monday

2:30 a.m. - SpaceX/Dragon Fly-Under of the ISS Coverage - JSC (All Channels)

10 a.m. - SpaceX/Dragon Mission Status Briefing - JSC (All Channels)

May 22, Tuesday

2 a.m. - SpaceX/Dragon ISS Grapple and Berthing Coverage - JSC (All Channels)

1 p.m. - SpaceX/Dragon Mission Status Briefing (Time subject to change) - JSC (All Channels)

May 23, Wednesday

7:30 a.m. - SpaceX/Dragon Hatch Opening Coverage - JSC (All Channels)

TBD - ISS Expedition 31 Post-SpaceX/Dragon Hatch Opening Crew News Conference - JSC (All Channels)

post-347280-0-85294900-1336185371_thumb.

remixed: sorry i didn't write again sooner. i hope you are feeling better now. what about the plans for your father's ashes, is everything ok now? you can always come to neowin for a shoulder, i've taken advantage of that a lot recently :cry:

and what's wrong with your area? please do keep us posted with how things are going!

thanks a lot for posting this Doc, and for the updated schedule. i love NASA TV and have marked my scheduler to make sure i remember to watch this! and i'm glad we can now buy SpaceX swag, i need to get some to support the Great Cause.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • These are not "great" prices... just "less awful". Apparently "Those who forget the past are doomed to pay higher prices and think they've won."
    • Russia was able to invade Crimea because of those people. But my point is that I've personally heard how great it was to be "back in Russia" right afterwards - look how great it is now. I've asked you a question in another comment which you haven't answered, so I'll ask it again: is it better now without "Europrats"?
    • ZimaBoard 2 1664 Starter Kit review: it's a cool and affordable DIY NAS by Steven Parker IceWhale Technology reached out to me asking if I was interested in testing the ZimaBoard 2, and after convincing them to send me the Starter Kit, it arrived at my doorstep in May. A bit of background: it is a Shanghai-based Chinese company founded in 2020, which specializes in single-board servers and personal cloud solutions. From searching around online, user feedback on the company and ZimaOS is mostly positive, so we're off to a good start. In addition, I should probably point out that although they do not have a large portfolio of NAS devices, with just four of what they do offer, they seem to have covered everything from a relatively low-priced entry point with the ZimaBoard 2, right up to the high end, with the ZimaCube 2 Creator Pack that even includes an NVIDIA RTX PRO 2000. Anyway, as already mentioned, what we have today is the ZimaBoard 2 Starter Kit, and here are the full specifications: ZimaBoard 2 Model 832, 1664 CPU Intel Core N150 (4x E Cores/Threads, Max burst up to 3.6 GHz) TDP: 6W (Base) 10W (Max) Graphics Intel UHD Graphics 24 EUs (1.00 GHz) Memory 8 GB, 16 GB DDR5 4800MT/s non ECC SODIMM (soldered) Disk Capacity 60 TB (30 TB x 2) Supported RAID Types TRAID, TRAID +, RAID0, RAID1, RAID5, RAID 6, RAID 10 Storage 2 x SATA 3.0 6Gb/s Ports with Power Bootloader 32 GB, 64 GB eMMC Network 2x RJ-45 2.5 GbE PCIe 1 x PCIe 3.0 (via LPC) USB Ports 2 x USB-A 3.1 (5 Gbps) Display Mini-DisplayPort 1.4 (4K@60Hz) Hardware Transcoding Engine H.264, H.265, MPEG-4, VC-1 Maximum resolution: 4K (4096 x 2160); Maximum FPS: 60 Virtualization Intel® AES New Instructions Intel® Virtualization Technology (VT-x) Intel® Virtualization Technology for Directed I/O (VT-d) Size (H/W/D) 140mm x 83mm x 31mm Weight 0.4 kg (only ZimaBoard 2 device) Power 12v 5A Power Supply Warranty 1 year (Global) 2 Years (EU) OS ZimaOS v1.6.1 MSRP $339, $399 ($548.60) As you can see above, there are two variants of the ZimaBoard 2. The lesser variant has half the eMMC storage and 8 GB less RAM, although it also costs $60 less than the top variant we are testing today. The above pricing is only for the ZimaBoard 2. I put the MSRP of the Starter Kit next to it in brackets, although as of publishing, it is discounted to $534.50. The ZimaBoard 2 started life on Kickstarter and shipped to backers in August last year. It became available via the official website in late 2025 and Q1 2026. This hobbyist NAS contains the still relatively new N150 Intel CPU released in the first quarter of 2025, with support for DisplayPort 1.4, HDMI 2.1, although in this case, the memory is integrated into the board itself, so it will not be possible to upgrade or expand the amount. It also supports AV1 decoding, as well as H.264, VP8, VP9, H.265 (8 bit), and H.265 (10 bit). The different capabilities in the Alder Lake-N (and Twin Lake) series are listed below. Processor E-cores L3-cache Turbo clock GPU GPU-clock TDP Intel N355 8 6 MB 3.9 GHz 32 EUs 1.35 GHz 9 W Intel Core 3 N350 3.9 GHz 1.35 GHz 7 W Intel Core i3-N305 3.8 GHz 1.25 GHz 9 W Intel Core i3-N300 3.8 GHz 1.25 GHz Intel N250 4 3.8 GHz 1.25 GHz 6 W Intel Processor N200 3.7 GHz 0.75 GHz Intel N150 3.6 GHz 24 EUs 1 GHz Intel N97 1.2 GHz 12 W Intel Processor N100 3.4 GHz 0.75 GHz 6 W The CPU is part of the Twin Lake series that sits near the bottom of the N-series, designed for low- powered systems and entry-level laptops, and as such has a base level TDP of just 6W. As I have noted before, we are seeing another NAS with a great amount of RAM. It's important to mention that the ZimaBoard 2's memory is integrated into the base board (which is why they have two variants of it). As a reminder, up until a couple of years ago, it was commonplace to only get 2 or 4GB max on a flagship Synology or QNAP home NAS. Ever since the likes of TerraMaster and more have entered the market with ample RAM sizes included in their NAS offerings, it has gone a long way in forcing the hands of the traditional makers to up their game a bit. First impressions The Starter Kit came in one outer box with several packages inside it (shown above). I forgot to take pics of it because when it arrived, it wasn't clear what was inside, and I had to confirm with my contact that I received the entire Starter Kit. In the box ZimaBoard 2 ZimaBoard 2 HDD Expansion Bracket + PCIe card frame Zimaboard Mini DisplayPort Male to HDMI Female Cable 4K 60Hz Zimaboard PCIe 3.0 x4 to Dual NVMe M.2 SSD Adapter Card Quick guide [full online guide] Limited warranty notice Screws Design Where to start? You'd be forgiven for mistaking it as an SSD enclosure if not for all the ports on it. It is completely made out of metal, and the top is an entire heatsink. It has a premium feel about it, but it definitely looks like a hobby device. As you will see, the completed build looks like it belongs in a server or meter closet rather than as a showpiece on someone's desk. On what I am calling the rear, there's a Mini DisplayPort (1.4), two 2.5 GbE ports, with Type A 3.1 USB ports, and then the barrel connector port. Around the front, there are two SATA6 ports with a power connector in the middle. Left side Right side One side is completely free of ports. On the other there's a slit that allows for the feed of a CPU fan cable, and a PCIe 3.0 X4 slot. Top Bottom The top is entirely made up of a heatsink except for the extended height for the I/O on the rear. Around the other side, you can find the ZIMA branding and some regulatory information stamped near the bottom. As you may see from the bottom of the ZimaBoard 2, it scratches quite easily from just moving it around on my Ikea island. Teardown Before we get started, let's have a look at this thing on the inside. The steps to get to the board are as follows: Remove the four smaller Torx screws on the bottom of the ZimaBoard 2; Remove the four larger Torx screws on the sides of the device; Carefully unstick the CMOS battery from the PCB; Remove two Phillips screws on the PCB; Lift out the PCB. Yes, as you can tell from the instructions, you need three different tools to remove Torx and Phillips screws (10 in total), and unhelpfully, one of the screws is located under the CMOS battery, which is stuck onto the PCB. Building Now comes the fun part. Because the ZimaSpace website does not provide any guidance on how to put the Starter Kit together. They only have guidance for connecting the CPU fan. However, they did upload a video to their YouTube channel that shows the entire process. To install the fan, first remove the four screws on the bottom of the ZimaBoard 2, then on the inside, there is a CPU FAN connector where you can attach the fan, reattach the ZimaBoard 2 frame, and feed the fan cable through the provided slit. Then remove the nearest screw on the side and attach the fan frame to the side of the device using the same screw. ZimaBard 2 screws Aligning the screws Bottom view Remember those four screws we removed to access the CPU FAN? Longer screws are provided in the box with the HDD Expansion Bracket, which is what you will now need to attach the ZimaBoard 2 to it. Helpfully, the orientation on how to attach it is made obvious when the frame can only be screwed on at the same overall length as the ZimaBoard 2. If you do it the wrong way around (which is what I did initially) one side hangs off the frame, and it becomes difficult to attach the PCIe Adapter Card cable. PCIe card frame Other side PCIe slot connector Next, it's time to attach the PCIe card frame, which is fastened with the help of 3.5-inch SATA HDD (3 screws). These are toolless screws that you can just use your fingers to fasten them with. Then it is time to connect the provided PCIe cable with the slot connector on one side of the ZimaBoard 2, feed it through the bottom of the HDD frame, and fasten it with two standoffs. Both bracket options 2280 standoffs with 2x 4TB MP44Q The PCIe 3.0 X4 card comes with a short bracket option, handy if you decide to place it inside a different NAS or rack server, but here we need the long bracket. Oddly enough, the M.2 standoffs were preinstalled into the 22110 position, but extra standoffs are included in the box, which I installed at the 2280 position for our use. I added a couple of MP44Q M.2 PCIe 4.0 SSDs (2 x 4TB) that can be availed on Amazon for $478.99 (the lowest price for 3 months) that TEAMGROUP supplied us with Then we have the almost completed build, you just need to push the card into the PCIe slot. Unfortunately, IceWhale Technologies did not provide a screw for the PCIe card frame (this is also apparent in their own video). Here it is at several different angles, with the last pic showing the SATA Y-Cable connected to the two WD Red Plus 4TB drives. Setup and Usage Next, you connect your cables to the I/O, and the ZimaBoard 2 powers on automatically, as there is no power button on the device. Power is controlled through the Settings in ZimaOS. BIOS The ZimaBoard 2 includes an Aptio BIOS from American Megatrends [1, 2, 3], and you can setup pretty much everything here including the boot order, which is locked to the UEFI OS, however above that choice you can enable or disable booting to a SATA/USB bootloader so this would still allow you to switch to an alternative bootloader and boot from it, or disable it to instead always start from the first disk with an OS installed on it. Initial Setup Upon connecting to the LAN and booting up, the ZimaBoard 2 can be reached by navigating to the IP address (shown if you have a monitor connected), or you can find it using the ZIMA Client desktop application, which is essentially a Zima device finder. Initializing the ZimaBoard 2 The ZimaOS setup process is pretty straightforward, through a wizard, and in full above, it basically consists of setting up an account and some handy tips, and that's that! Post Setup (ZimaOS update) Upon first boot, you are alerted that there is a ZimaOS update from 1.5.0 to 1.6.1, which I applied; the full process is shown above with the changelog. ZimaBoard 2 Storage Setup Next, it is time to set up the storage. ZimaOS actually throws everything onto the eMMC flash drive; it is also the default location of AppData, which is definitely something to be wary about, as the 45GB available storage could fill up quickly. HDDs I first attempted to create a Storage Pool using the two 4TB WD Red Plus NAS drives, and got an error message: After several attempts and then looking online, I discovered it was a bug with ZimaOS where the fix was simply to reboot ZimaOS and then try again, this time I was able to create a RAID mirror using the two drives. SSDs I did the same for the SSDs, as you will see in the above gallery, when I created the second Storage Pool, it only allowed me to select available drives. ZimaBoard 2 AppData ZimaOS comes with an App Store that includes a repository of almost 400 apps, so you will be able to find most of what you'll need for a NAS (although after a quick search, I wasn't able to find a Surveillance Manager), and now comes the important part: moving the default AppData location off the 45GB eMMC and onto a larger volume: Open Settings Then Apps Then, in the Select a new location field, click on the new Storage volume you want to move it to (in my case, the Apps Storage Pool), which is the SSD RAID mirror. Confirm the Migration warning Be praised! You can also do this for Docker (which by default installs onto the 45GB eMMC flash drive) and the User database. Plex Setup Next, I tested the configuration by installing the Plex Server app from the App Store. The library folders must already exist (which I placed into the Storage Pool). Plex Server setup is straightforward and requires very little configuration. In my case, all I had to do was add the media path I just created, which you can also browse to using the folder icon in the path field. In addition, you can now map the new Media library in Windows Explorer using the Zima Client. Oddly enough, it is not possible to access the ZimaBoard 2 over the Network Neighborhood; you must map drives using the client, which is shown in the last image in the above gallery. I watched one of my Blu-Ray rips, which is Dolby Vision with Dolby Atmos, and the content played fine with no stuttering or buffering, which is what anyone needs in this scenario. ZimaBoard 2 Zima Client mobile app There's also a client for mobile. It is pretty barebones, as shown in the above gallery, for example, the Apps screen launches the WebUI for that app, and the Backup must be done manually. On opening Backup, you can select internal storage folders on your phone to backup to the ZimaBoard 2's storage, and although this is constantly scanned, the backup action itself must be manually triggered. There is an option to allow foreground backup (last image in the above gallery), but this basically means the queued backup gets triggered when you manually open the app. Benchmarking SATA PCIe 3.0 X4 A CrystalDiskMark test on a mapped network drive from within a Windows 11 25H2 PC (image above) connected over a 2.5 GbE was well within acceptable ranges. Writes were generally better on the SSD RAID mirror. SATA PCIe 3.0 X1 I also ran the NAS Performance tester, which tests the link speed performance. As you can see, it pretty much maxes out the 2.5GbE connection. Of course, you can also opt to bond the two 2.5 GbE connections for a bit more umph, but I didn't do that. Thermals Top PCIe card SATA HDDs Next, I measured some hotspots while playing content on Plex. It's fair to say this will perform better than a NAS that is enclosed in a metal or plastic case, as almost everything storage-wise is exposed! Anyway, the ZimaBoard 2 did not break a sweat with Plex streaming or disk benchmarks. ZimaOS Factory Reset ZimaOS does not include a factory reset option. Instead, you have to download the ZimaOS image and flash it to the eMMC manually. The flashing process is shown in the above gallery. The steps to do so are listed below: Download the ZimaOS image here; Open BalenaEtcher (Run as Administrator) and select the image; Select your inserted USB drive (min 8 GB) Flash to it; Connect your USB drive, monitor, keyboard, USB hub (optional), mouse (optional), and network cable (recommended) to the ZimaBoard 2; Connect power and press F11 continuously; Select your USB drive starting with UEFI in the boot device menu; Press Enter on the Install ZimaOS option; Select /dev/mmcblk0 (MMC) flash drive as target; Confirm with (three times) to wipe the target disk; Wait a couple of minutes while ZimaOS installs; Remove the USB drive and confirm with a reboot; Your ZimaBoard 2 has been factory reset. However, you don't have to stick with ZimaOS, in fact the company also offers official CasaOS images, that are based on Debian; or as they say themselves, put anything you want on this "hackable single board server" it's up to you. Conclusion I had a lot of fun putting this together. I've custom-built all my own PCs and servers since the 90s, and this is the first time I have had to put a NAS together. Even if the actual base ZimaBoard 2 was already a completed build, it still feels pretty custom. I just wish that IceWhale Technology included a getting-started guide in the box for the Start Kit, which would have really completed this kit. Instead, I had to search for the official video on the YouTube channel to make sure I wasn't doing anything wrong. So who is this for? Definitely the hobbyist who is comfortable building their own PC and servers. It also has a much smaller footprint than its nearest equivalent (in terms of specs), like the Beelink Me Pro, which is another NAS I will be testing soon. Although the Beelink does not come with the PCIe 3.0 X4 expansion, the ZimaBoard 2 Starter Kit suddenly looks to be a great bargain, even if it only offers the two 3.5-inch bays over the four in the other example. It makes a lot of sense to use Intel's N150 chip inside a NAS; it is more than capable of doing what the ZimaBoard 2 is intended for, media streaming and backup. It also looks like the IceWhale Technology staff are quite active in the official forums helping people with issues they come across with ZimaOS and the devices, peer support seems to be good as well, I was quickly able to find why I was not able to create a new Storage Pool in ZimaOS v1.6.1 even though that is quite a serious bug, hopefully it will be fixed in the next update. If you are comfortable with the command line and Docker, you'll be fine. You can do great things with this hardware. This was my first time with ZimaOS. It seems a bit barebones in comparison to the likes of Synology DSM, TOS, and UGOS, but it has a ton of apps to get you started with your home or small business NAS. Where to buy As of publishing, IceWhale Technology is running a discount of up to 5% for the Starter Kit. If you opt to get just the ZimaBoard 2 itself, it does come with a SATA Y-Cable, so you will be able to connect up to two 3.5-inch HDDs to it. ZimaBoard 2 1668 Starter Kit for $534.50 on Amazon US (was $548.60) ZimaBoard 2 832 Starter Kit for $372.88 on Amazon US (was $390.60) Zimaboard 2 1668 (16GB+64GB) for $419.90 on Amazon US Zimaboard 2 832 (8GB+32GB) for $359.90 on Amazon Disclosure: IceWhale Technology provided a free sample without any editorial input or review pre-approval. Good to know The Amazon link is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, when you purchase through links on our site, we earn from qualifying purchases.
    • It's in the Insider's group so yes it's technically beta, though these days it's hard to see much of a difference unless you opt for the most extreme beta builds, which I don't. When I moved here from the Release Preview channel I did so primarily because I wanted to see how well the restored taskbar functionality (restored from Win10, and earlier) is working and whether it was time to finally abandon SAB--and it is--working fine, so far. Not as polished as SAB, but it'll do for me.
    • I've been using MWB Premium for a number of years so that along with Windows updates and updated browser should be fine. Thanks for that.
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      488
    2. 2
      +Edouard
      220
    3. 3
      PsYcHoKiLLa
      147
    4. 4
      Steven P.
      74
    5. 5
      FloatingFatMan
      70
  • Tell a friend

    Love Neowin? Tell a friend!