Recommended Posts

Source: http://www.pcmag.com...,2412796,00.asp

Where Is Windows 8.1?

by John C. Dvorak

As predicted, Windows 8 is neither setting the world on fire nor getting much sympathy from the critics. Microsoft must now make a bold move: release a version 8.1 as soon as possible.

Back before Windows 95, the company released a lot of "point step" incremental upgrade versions of both Windows and DOS. There was a Windows 3 and a Windows 3.1, for example. In fact, there was even a 3.11 and 3.2. This was done to tweak the offering as Windows was still being fine-tuned to meet user demands and needs.

This sort of tinkering was even more common during the DOS era. It became difficult with XP and Vista because there was no numbering scheme. By the end of the Vista era, people ended up forgetting the point step upgrades and instead used endless weekly patches.

With the introduction of Windows 7 and a return to the numerical system, we could easily have had 7.1 or 7.2, but of course that never happened. Now it has been nearly 20 years since the incremental changes were commonplace and I have to think that the young'uns who populate the Microsoft executive suite are clueless about and probably scared of the concept. They do not realize that it was this technique that made Microsoft what it is today and that it could restore the company to its former glory.

After all, why use numbering if you aren't going to implement point step changes? From a psychological perspective, users see point step changes as proactive. It looks like the company is busy working on new ideas and actively recompiling. Patch Tuesday and service packs make it look like the company is trying to repair a leaky boat. There's a huge difference in connotation. If you want to know why Microsoft stock has not moved in over a decade, this is the reason.

So what should 8.1 actually be?

The way I see it, 8.1 should have a software toggle that eliminates the clunky touch-screen interface altogether. Boom! Gone! The 40 or 50 people who buy touch screens for their desktop machine can toggle it on if they want it. This would immediately eliminate the stupidity of full screen apps that cannot be scaled down or windowed.

I've already written about this problem, but to summarize, people do not go out and buy a 27-inch monitor (or two of them) to run any application full screen. Why would they? And why would anyone want to run any application full screen ever? The only time you do it is perhaps to watch a movie on the computer. This incorrect notion obviously came from people who do not actually use computers. And this in itself is weird. Bill Gates is still the chairman of the company, so did he approve this nonsense at a board meeting or is he totally checked out from the company, preferring to hobnob with the elites in Africa?

Windows 8.1 could also incorporate all the patches thus far into a new build. I don't know about you, but I think the whole idea of having hundreds of patches in any OS is unnerving. I'd rather get a new build every so often. It's okay to have patches for a while, but then get rid of them with a new compilation and a numerical step.

Google is a pro at this, using the very old-fashioned "double point" upgrade, like Android 3.2.1 or some such thing.

I know for a fact that Microsoft was at least thinking about a yearly upgrade as far back as 1995. It couldn't pull it off and ended up with Windows 95, Windows 98, and Windows 2000. Finally it gave up on the idea. Then the company came up with the "XP" and "Vista" monikers with patches galore and weird rebuilds called service packs. None of this worked as well as the more manageable point step system. The first service pack for Windows 7 should actually be Windows 7.1 and distributed as such, recompiled.

With Windows 8, Microsoft has the opportunity to return to this sensible and established concept by releasing Windows 8.1. It should do so now.

Link to comment
https://www.neowin.net/forum/topic/1124846-where-is-windows-81/
Share on other sites

Well I just use alt -tab. I also have two screens so one program in each window.

I understand. It is such a sensory overload to have more than one thing on one screen. Right now I have a video playing, two Chrome windows, two explorer windows, NewsLeecher, PhotoShop and Steam open. My head will soon explode. Better move to one app. Better yet, to use the amazing multitasking skillz of Windows 8, Imma "pin" an "app" to the side. Amazing. 25 years of operating system development has finally led us in the right path.

Author seems to be a Mac fan or something. I mean come on, complaining about maximized applications?

The only OS where I don't get how to maximize anything is Mac. In Windows it is a god send - the ability to FOCUS on something.

  • Like 4

Xp, vista, and 7 have all had revisions, they are call windows updates and service packs. Back in the windows 3 days, the internet being in its infancy, most people had dial-up whichmade these kinds of updates imposssible so they released 3.1, 3.11, and the chinese got 3.2

  • Like 1

Author seems to be a Mac fan or something. I mean come on, complaining about maximized applications?

The only OS where I don't get how to maximize anything is Mac. In Windows it is a god send - the ability to FOCUS on something.

Let me introduce you to the OS X fullscreen option. Introduced a year and a half ago and heavily critized by Windows users claiming that desktop guis should not be like tablet guis.

post-4652-0-11830900-1355182142.png

  • Like 2

The 40 or 50 people who buy touch screens for their desktop

And lo, Dvorak's disconnect from reality is established.

3.11 came before 3.2?? :s

Two things: (1) Yes, once upon a time, point releases followed the same math we learned in elementary school, where 3.2 is a larger number than 3.11. The concept of going from 3.9 to 3.10 comes from a culture of too many damn point releases between major versions. (2) Windows 3.2 was the Chinese release, and China *only*, which makes me wonder why Dvorak even bothered mentioning it.

This topic is now closed to further replies.
  • Posts

    • Qualcomm takes on NVIDIA with new Dragonfly CPU and AI chips by Pradeep Viswanathan Microsoft, Google, Amazon, AMD, Meta, Apple, OpenAI, and several others have been developing their own chips for AI infrastructure. However, NVIDIA still remains the dominant player in the market. Today, Qualcomm announced a major expansion of its data center infrastructure portfolio to better compete with NVIDIA. The new lineup includes the Qualcomm Dragonfly C1000 CPU, Qualcomm High Bandwidth Compute technology, the Dragonfly AI300 inference accelerator, new connectivity products, and custom silicon solutions. Qualcomm claims that this new lineup improves performance per watt, token throughput, and total cost of ownership for AI data centers. The Dragonfly C1000 is a new data center CPU built with Qualcomm’s custom Oryon cores. This chip will feature more than 250 cores, frequencies above 5GHz, and a chiplet-based design. Qualcomm claims that this new C1000 can deliver more than 2x better performance per watt compared to existing server CPU offerings based on specifications. The Dragonfly C1000 will support PCIe Gen 7 with more than 2TB/s of connectivity, along with CXL, advanced RAS features, and both air and liquid cooling. Qualcomm expects the Dragonfly C1000 to be commercially available in 2028. Additionally, Qualcomm and Meta announced a multi-year, multi-generation agreement under which Qualcomm will supply Dragonfly C1000 data center CPUs for Meta’s next-generation server fleet. Qualcomm also announced High Bandwidth Compute, a new near-memory computing architecture designed to address AI’s memory bandwidth bottleneck. HBC Gen 1 will debut with the Dragonfly AI250, which is expected to sample in mid-2027. The AI250 will deliver 133TB/s per card, an 18x increase in effective memory bandwidth compared to the AI200 with LPDDR5X. The new Dragonfly AI300 with HBC Gen 2 is a rack-level AI inference platform from Qualcomm. Qualcomm claims that the AI300 can deliver 4x to 8x better performance per watt compared to existing GPU-based architectures based on memory bandwidth per watt per card. The Dragonfly AI300 is expected to be available in 2028.
    • IBM reveals sub-1nm chip technology, production expected in another 5 years by Pradeep Viswanathan TSMC is now leading the chip manufacturing industry with its 2nm-class process node called N2. Samsung Foundry also has a 2nm-class process node called SF2. TSMC says N2 entered volume production in Q4 2025. Samsung says SF2 started mass production in 2025. Today, IBM announced the world’s first sub-1-nanometer chip technology, marking another major semiconductor research milestone. The new technology is based on a 0.7nm, or 7-angstrom, node and uses a new transistor architecture called “nanostack.” The new design vertically stacks and staggers nanosheet-based transistors so that more components can fit into the same chip area while also improving performance and power efficiency. IBM claims that this new sub-1nm chip can pack nearly 100 billion transistors onto a chip the size of a fingernail. This offers almost twice the density, up to 50 percent higher performance, or 70 percent better energy efficiency when compared to IBM's 2nm node design announced back in 2021. Also, IBM mentioned that this new architecture can deliver 40 percent SRAM scaling. It is important to consider that this announcement from IBM is a research milestone rather than a near-term process node launch. Back in 2021, IBM unveiled the world’s first 2nm chip design, claiming 50 billion transistors on a fingernail-sized chip and major performance and efficiency gains. Five years later, IBM’s 2nm technology has still not entered mainstream commercial production. That is because IBM is no longer a major commercial chip manufacturer. It sold its chip manufacturing business to GlobalFoundries years ago and has since then focused only on semiconductor research, IP development, and partnerships. To productize its 2-nm chip technology, IBM partnered with Japan’s Rapidus, but it has not resulted in anything shipping at scale. IBM says that its new sub-1nm technology can reach production as early as within the next five years. If that happens, it will likely depend on manufacturing partners, advanced EUV tooling, and years of yield improvements.
  • Recent Achievements

    • Week One Done
      Meta Plast earned a badge
      Week One Done
    • First Post
      kinowa earned a badge
      First Post
    • Rookie
      krychek57 went up a rank
      Rookie
    • Grand Master
      Jaybonaut went up a rank
      Grand Master
    • One Year In
      Philsl earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      461
    2. 2
      +Edouard
      171
    3. 3
      PsYcHoKiLLa
      136
    4. 4
      Michael Scrip
      78
    5. 5
      Xenon
      77
  • Tell a friend

    Love Neowin? Tell a friend!