Recommended Posts

Here we go. What they're getting awards for - (spacecraft images bottom)

Boeing: CST-100 crew capsule

SpaceX: Dragon capsule launch escape/landing system

Sierra Nevada: Dream Chaser spaceplane

Blue Origin: New Shepard capsule

RELEASE: 11-102

NASA AWARDS NEXT SET OF COMMERCIAL CREW DEVELOPMENT AGREEMENTS

WASHINGTON -- NASA has awarded four Space Act Agreements in the second

round of the agency's Commercial Crew Development (CCDev2) effort.

Each company will receive between $22 million and $92.3 million to

advance commercial crew space transportation system concepts and

mature the design and development of elements of their systems, such

as launch vehicles and spacecraft.

The selectees for CCDev2 awards are:

-- Blue Origin, Kent, Wash., $22 million

-- Sierra Nevada Corporation, Louisville, Colo., $80 million

-- Space Exploration Technologies (SpaceX), Hawthorne, Calif., $75

million

-- The Boeing Company, Houston, $92.3 million

"We're committed to safely transporting U.S. astronauts on

American-made spacecraft and ending the outsourcing of this work to

foreign governments," NASA Administrator Charles Bolden said. "These

agreements are significant milestones in NASA's plans to take

advantage of American ingenuity to get to low-Earth orbit, so we can

concentrate our resources on deep space exploration."

The goal of CCDev2 is to accelerate the availability of U.S.

commercial crew transportation capabilities and reduce the gap in

American human spaceflight capability. Through this activity, NASA

also may be able to spur economic growth as potential new space

markets are created.

Once developed, crew transportation capabilities could become

available to commercial and government customers.

"The next American-flagged vehicle to carry our astronauts into space

is going to be a U.S. commercial provider," said Ed Mango, NASA's

Commercial Crew Program manager. "The partnerships NASA is forming

with industry will support the development of multiple American

systems capable of providing future access to low-Earth orbit."

These awards are a continuation of NASA's CCDev initiatives, which

began in 2009 to stimulate efforts within U.S. industry to develop

and demonstrate human spaceflight capabilities. For more information

about NASA's Commercial Crew Program, visit:

Boeing CST-100 (partnered with Bigelow Aerospace)

CST-100.jpg

SpaceX Dragon (already flying)

fancy-dragon3_640x480.jpg

Sierra Nevada Dream Chaser (partnered with Northrop Grumman & Virgin Galactic)

Sierra+Nevada+Dream_Chaser.jpg

Blue Origin New Shepard (somewhat black project)

A513.jpg

Details -

Sierra Nevada:

system requirements review

canted airfoil fin selection

cockpit based flight simulator

vehicle avionics integration laboratory

system defniition review

flight control integration laboratory

ETA structure delivery

separation system test

preliminary design review for Dream Chaser

optional milestones: materials testing captive carry and ETA landing gear drop tests, ETA captive carry flight test, wind tunnel testing, dream chaser handling qualities evaluation, main RCS test, two hybrid rocket motor test firing, thrust vector control test, ETA captive carry flight test readiness review, ETA free flight test

Blue Origin:

* Space Vehicle Design: space vehicle system requirements review

* Pusher escape Risk Reduction: pusher escape ground firing, pusher escape pad escape test (optional milestones: pusher escape max-Q sled test calibration run, pusher escape mas-Q sled test egress run)

* RBS (reusable booster system) engine risk reduction: engine thrust chamber assembly test at Stennis (optional: engine pump cold gas drive test, engine pump hot gas drive test) [as an aside, apparently the RBF is a 100klbf restartable hydrolox engine)

Boeing:

launch abort engine fabrication & hot fire test demonstration

landing air bag drop demonstration #1

phase I wind tunnel tests

interim design review - 4

parachute drop tests demonstration

SM propellant tank development test

LV EDS/ASIF interface simulation test

Preliminary design review

SpaceX:

launch abort system propulsion conceptual design review

design status review 1 (for Falcon 9/Dragon crew transportation system)

LAS propulsion components PDR

crew accommodation concept prototype and in situ trial (internally-funded by SpaceX, NASA astronauts invited to try crew accomodations and give feedback)

DSR 2

crew accommodation concept delta-prototype and in-situ trial 2

LAS propulsion component test articles complete

LAS propulsion component initial test cycle

concept baseline review

Sierra Nevada hasn't provided a timeline graphic for Dream Chaser's timeline, but drop tests of the full size test bird, analogous to the Shuttle Enterprise, will perform drop-test flights in 2012 - likely using the Virgin Galactic White Knight Two serving as its mothership. A launch is possible atop an Atlas V in 2014.

Blue Origin is, as usual, cryptic other than the test flight will be on an Atlas V and later flights on their own reusable booster.

  • 2 months later...

CCDev is now starting level 2 (CCDev-2) and is issuing bi-monthly reports. The most recent is here -

http://www.nasa.gov/pdf/563409main_201106_Commercial_60day_Report_508.pdf

Highlights:

Boeing CST-100: Delta Systems Design Review completed, Full-scale landing airbag test this summer.

SpaceX Dragon: abort system design and supporting paper gets sent to NASA this month (July 2011). Cabin hardware (seats, controls, and enhanced life support) development in parallel.

SNC Dream Chaser: system requirements review, preliminary design review, airfoil selection

Blue Origin SV: vehicle design, pusher launch escape, and reusable booster.

No, it's TSTO - two stages.

The only SSTO spacecraft that's been proposed was the Lockheed Martin VentureStar spaceplane and it's X-33 testbed, both of which used the revolutionary Linear Aerospike engine. They were cancelled by NASA & Congress in 2001 during X-33's construction; it was too big a threat to the Space Shuttle establishment.

VentureStar was shown in the opening credits for Star Trek: Enterprise and was also referenced in Avatar.

Left to right: X-33, VentureStar and Space Shuttle

x33_venturestar_shuttle.jpg

oh come on Doc, you know i love the VentureStar, it's basically my Valkyrie shuttle, and yes the name was used in the Avatar ISV...that was a nice touch i thought. is there a chance the VS will be resurrected now the shuttle is retired? will the aeospike engine magically work to spec now? please?

When who is scheduled to do what - subject to change, of course

2011:

Dragon C2 cargo - ISS approach (optional C3 - ISS docking)

2012:

Dragon C3 cargo - ISS docking (if blended C2/C3 isn't done)

Dream Chaser drop tests (from WhiteKnightTwo)

Cygnus C1 cargo first test flight - ISS approach

Falcon Heavy delivered to Vandenberg AFB SLC-4E

Dragon cargo to ISS goes operational - 12 flights

Cygnus cargo to ISS goes operational - 8 flights

2013:

Falcon Heavy first flight

Dream Chaser unmanned flight

2014:

CST100 unmanned flight

Dragon manned flight

Dream Chaser manned flight

2016:

NASA MPCV* unmaned flight (if NASA's SLS** booster is ready)

* Multi-Purpose Crew Vehicle

** Space Launch System ultra-heavy lift rocket

MPCV is what's supposed to take us to the moon and Mars, right? So why not just launch it to the moon 2016?

EDIT: i liked your Buck Rogers joke, but i intentionally avoided it...the Venture Star cancellation really saddens me...such a beautiful ship!

Orion/MPCV is what's left of the Constellation lunar program, an exercise in how NOT to do things.

Constellation was finally killed last year but its supporters keep trying to resurrect it, and MPCV is part of that in spite of Dragon being designed to be just as capable for beyond Earth orbit missions. Its launcher, SLS, is late and getting later as Constellation advocates try to resurrect Ares V as the design goal in spite of good reasons not to ($$$$$$)

Stupidity & greed.

The correct way to do heavy lift is to have a competition like COTS for cargo and CCDev for crew; let SpaceX's Falcon X/XX concept etc. take on all comers. The problem is that this puts the old-paradigm high-cost systems like shuttle-derived (SLS/Ares V, Direct etc) at a cost disadvantage, which doesn't sit well with congressmen & senators who have shuttle-based NASA centers and suppliers in their states/districts.

NASA and United Launch Associates (ULA - a Lockheed/Boeing joint venture) have signed a Space Act Agreement for the human-rating of the Atlas V booster. This agreement is unfunded, but it will allow ULA to use NASA's labs to develop, simulate and test towards this end. ULA's dime.

Atlas V is to be the front line launcher for the SNC Dream Chaser, Blue Origin's Space Vehicle, and Boeing's CST-100.

The big question is if the $120M+ cost of Atlas V will be lowered enough to compete with Falcon 9's $59M - $69M price point. The current price is the same as a cross-fed Falcon Heavy, a much more powerful system set to start flying in 2013. Massive overkill for this purpose, but still....

Atlas V and CST-100

atlas402.jpg

Atlas V and Dream Chaser

atlas_dreamchaser.jpg

every time you feel hostile towards spaceplanes, just sing the theme song from Star Blazers to yourself, and picture the Argo/Yamato flying through space with that huge citadel on top. you'll get in the spirit and won't hate spaceplanes any more.

"we're off to outer space, we're leaving mother Earth, to save the human race..."

As I'v said, they have their uses including emergency medical and delicate experiment/materials return, but for now not the routine up/down stuff.

That said, I'm prepping a post that may make you happier. It's not near term but it is commercial and very real.

  • 4 weeks later...

CCDev 60 day update #2

http://www.nasa.gov/pdf/580957main_August%202011_CSD%2060%20Day%20Report_508.pdf

Notables:

The main potential delay for SpaceX's COTS-2/3 flight actually docking at ISS is not them but delays in software updates at ISS itself.

SpaceX will be testing at White Sands, presumably the Super Draco thrusters.

Blue Origin will be testing engines at Stennis.

SNC at Langley, KSC and JSC.

Boeing at Langley.

Aside-

SpaceX is testing the Super Draco's at White Sands because that center is set up to handle engine testing with toxic hypergolic fuels; nitrogen tetroxide and hydrazine - the same as most other spacecraft. The plan is to eventually transition to the NOBFx monopropellant if its ignition speed is fast enough for use in launch abort systems.

NOBFx = Nitrous Oxide Fuel Blend x, a FireStar Technologies propitiatory mix of nitrous oxide with a fuel and blending agents in various proportions (the "x") according to the mission. By storing both oxidizer and fuel in a stabilized mix it simplifies the plumbing considerably and it's not anywhere near as toxic as hypergolics. It gets tested at ISS in 2012,

http://www.firestar-engineering.com/index.html

NOFBx advantages -

  • constituents are widely available from chemical suppliers, inexpensive and safe to handle.
    can be transported and handled without undue precautions or hazards.
    effluents are non-toxic and produces no accumulated deposits or contamination.
    propulsion system has high Isp (320-340 s) ? similar to the most common bi-propellant.
    has far better lift capability than the current workhorse monopropellant, hydrazine.
    is tolerant to a wide thermal range; storable at room temperature on the ground and is Space-storable.
    [is projected to] lower cost compared to existing propulsion systems of comparable performance.
    is monopropellant, which significantly reduces the need for auxiliary hardware, saving cost, volume, and mass for launch systems.
    utilizes cool running thrusters that dramatically reduce thermal design challenges.
    burns in liquid, gas, and two-phase flow.
    does not have the materials compatibility constraints of traditional hypergolic systems.

  • 2 months later...

Boeing will be using one of the old Shuttle processing facilities to prep & refurbish their CST-100 CCDev entry -

Link....

Boeing signs lease for NASA's space shuttle hangar

CAPE CANAVERAL, Fla. ? The Boeing Co. plans to build space taxis at a mothballed space shuttle processing hangar at NASA's Kennedy Space Center in central Florida.

On Monday, NASA officials and company executives confirmed that Boeing has reached an agreement with Space Florida, a state-backed agency working to expand space-related businesses in Florida, to lease Orbiter Processing Facility 3 at the center.

Boeing will also place the headquarters of its commercial crew operation in Florida, said John Mulholland, vice president and program manager for the company's effort.

"We will launch from right here, on Florida's Space Coast," Mullholland said.

The agreement was hailed by state and federal officials during a news conference inside the Orbiter Processing Facility. "Ladies and gentlemen, the dream is alive," said Sen. Bill Nelson, D-Fla.

NASA Deputy Administrator Lori Garver said the agreement would give a "major boost" to the space agency's commercialization efforts. She noted that Boeing and Space Florida were already sprucing up the shuttle's old hangar.

"I love what you've done to the place so far," she joked.

Kennedy Space Center is drafting a master plan for a revamped spaceport that, in addition to supporting future NASA spacecraft, will host commercial, military and international customers.

Boeing is one of four companies NASA is sponsoring to develop spaceships that can ferry astronauts to the International Space Station, a $100 billion project of 16 nations orbiting 240 miles (385 kilometers) above Earth.

With the retirement of NASA's space shuttles this summer, the United States is currently dependent on Russia to fly crews to the orbital outpost, at a cost of about $350 million per year.

NASA hopes to be able to buy rides from U.S. firms before the end of 2016.

Boeing's proposed space taxi is a seven-seat capsule called the CST-100, which would launch on an Atlas 5 rocket.

The company also has an agreement to provide rides for clients of Bigelow Aerospace, which is developing privately-owned inflatable space habitats for commercial and government lease.

NASA has spent $388 million to bolster the development of passenger spaceships. Boeing won $18 million in the program's first round of financing and $92.3 million in the second phase, which is currently under way.

The U.S. space agency this year added $20.6 million in options to Boeing's agreement if the company can complete additional milestones in the CST-100 development.

The Obama administration is requesting $850 million for the program for the fiscal year that began Oct. 1. Bills pending in the U.S. House of Representatives and Senate would cut that to $312 million and $500 million, respectively.

OPF-3

5936079070_d2590e369e.jpg

  • 1 month later...

Q1 2012 Commercial Crew Development milestones -

Sierra Nevada Corp. (SNC) Dream Chaser

- Engineering Test Article (ETA) Structure Delivery

- Captive Carry Interface & ETA Landing Gear Drop Tests (read: attachment for the Virgin WhiteKnightTwo mothership)

- Separation System Test

- ETA Captive Carry Flight Test Readiness Review

Boeing CST-100

- Launch Vehicle Emergency Detection System/Avionics System Integration Facility Interface Simulation Test Phase 2

- Launch Abort Engine (LAE) Fabrication and Hot Fire Test Demo

SpaceX Dragon

- Crew Accommodation Concept Prototype and In-Situ Trial 1 (read: seats, control panel layouts & controls)

- Crew Accommodation Concept Delta-Prototype and In-Situ Trial 2

(launch abort/DragonRider test fire in Q2)

Blue Origin SV

- Pusher Escape Ground Firing (read: launch abort system)

- Pusher Escape Test Vehicle #1 Shipment

United Launch Alliance (ULA) human-rated Atlas V launcher

- No milestone in Q1

Alliant Techsystems Inc. (ATK) Liberty launcher (unfunded)

- Launch System Initial System Design (ISD)

- Technical Interchange Meeting 2

- Program Status Review (PSR)

Excalibur Almaz Incorporated (EAI) (unfunded)

- System Requirements Review

- Launch Vehicle Compatibility Review

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Microsoft further improving Windows 11 Taskbar with latest builds by Sayan Sen Microsoft has released new Windows 11 builds for users flighting the Experimental channels. The new builds are 26300.8758 for Windows 11 26H2, 28120.2374 for 26H1, and 29617.1000 for future platforms. There are improvements related to the Taskbar, File Explorer and more with the new update. The full changelogs are given below: First we have the build 26300.8758: Changes and improvements gradually being rolled out [Taskbar] Taskbar customization just got easier. As we continue to make improvements to the Taskbar experience mentioned last month, we've introduced a dedicated Taskbar Size setting, making it simpler to find, understand, and personalize your ideal taskbar experience. UI showing the new Taskbar Size setting in Settings. We've also made refinements to the transitions between taskbar sizes for a smoother overall experience. [File Explorer] We've improved the reliability of thumbnail previews for cloud files in the Details pane. The pane has also been reorganized so file properties are easier to find and review at a glance. Fixed an issue where the OneDrive shortcut in File Explorer stops working when File Explorer is run in administrative mode. Fixed an issue where the confirmation dialog might display an internal Recycle Bin file name instead of the original file name when permanently deleting a file. [Sounds] Improved system sounds when using Windows in dark mode. Up next we have build 28120.2374: Changes and improvements gradually being rolled out This update includes a small set of general improvements and fixes [Mobile Device Settings] You can add and manage your mobile devices in Settings under Bluetooth & Devices > Mobile Devices. On this page, you can manage features such as using your device as a connected camera or accessing your device's files in File Explorer. [Remote Recovery Management] Added a recovery remote management plug-in to extend WinRE management capabilities for MDM providers. [Input] The emoji panel (Windows key + period (.)) now uses GIPHY as the GIF provider, delivering a smoother GIF browsing and sharing experience following the deprecation of the Tenor API. Finally we have the changelog for Windows 11 build 29617.1000: Changes and improvements gradually being rolled out [Windows Update] As announced in the Windows Update announce blog, we are now bringing a new unified update experience to reduce the number of reboots you see per month. We are starting by coordinating driver, .NET, and firmware updates to align with the monthly quality update, reducing the update experience to a single monthly restart. See the blog for more information. [Windows Magnifier] Magnifier now gives you more control over how you zoom. You can type an exact zoom percentage directly in the magnifier toolbar to land on precisely the level you need. We've also added preset step increments (5%, 10%, 25%, 50%, 100%, 150%, 200%, and 400%) to the Settings dropdown, so you can jump to common levels in a single click. Whether you need a subtle boost or a dramatic close-up, Magnifier adapts to how you want to zoom. Enter an exact percentage or jump to preset steps —5% up to 400%. Feedback: Share your thoughts in Feedback Hub (WIN + F) under Accessibility > Magnifier. [Accessibility] We're introducing screen tint, a new accessibility setting that applies a color overlay across your entire display, softening its intensity so it's easier on your eyes throughout the day. If bright, saturated screens leave you with tired or sensitive eyes by the end of a long session, screen tint can help. Screenshot showing UI for screen tint in Accessibility, with color presets and a strength slider. To get started, open Settings > Accessibility (or press WIN + U) and look for screen tint under the Vision section. From there, you can: Pick from six preset colors or choose a custom color of your own. Adjust the tint strength slider from a subtle wash to full intensity. Night light warms your display to reduce blue light that can interfere with sleep. Screen tint reduces overall screen intensity to ease eye fatigue and light sensitivity during the day. They tackle different problems and you can use both at the same time, one working on warmth and the other on intensity. Note that turning on screen tint will disable color filters, and vice versa. If you currently rely on color filters, you might need to keep screen tint turned off. Feedback: Share your thoughts in Feedback Hub (WIN + F) under Accessibility > Narrator. [Voice Access] Voice Access now supports Portuguese (Portugal), Portuguese (Brazil), and Korean (South Korea). [Audio] Continuing our work on improving Sound Settings, we've made a few more updates in this build: We've adjusted the description text for the Allow option in properties for audio devices to include the current state of the device, to improve the clarity of the text and the purpose of the button actions. "Listen to this device" is now available in properties for audio devices, so you don't need to enter Control Panel for this functionality. [Multiple Desktops] Improved explorer reliability when switching between multiple desktops. [Storage] We've updated the dialog when creating a Dev Drive to now support specifying the size in GB instead of only MB. This has also been added when changing the size of volumes under Settings > System > Storage. [Personalization] This update improves color selection accuracy when adjusting your accent color to match your wallpaper when automatic accent color selection is enabled in Personalization settings. This update improves wallpaper persistence reliability across restarts and upgrades, including better support for large-resolution wallpapers and other scenarios to prevent solid color wallpaper fallback. [Display and Graphics] Improves the reliability and persistence of applying color profiles. You can view the official blog posts here (link1, link2, link3) on Microsoft's site.
    • Windows 11 is getting redesigned taskbar settings in new build by Taras Buria Microsoft is rolling out new Windows 11 preview builds in the Insider program, offering users new features and changes to try ahead of public release. In the Experimental channel (formerly Dev), Microsoft is shipping build 26300.8758, while in the Beta channel, users can download build 26220.8754. The changelogs do not contain much, but there is an important update to taskbar settings. Here is what is new in build 26220.8754: [Taskbar] Taskbar customization just got easier. As we continue to make improvements to the Taskbar experience mentioned last month, we've introduced a dedicated Taskbar Size setting, making it simpler to find, understand, and personalize your ideal taskbar experience. We've also made refinements to the transitions between taskbar sizes for a smoother overall experience. [File Explorer] We've improved the reliability of thumbnail previews for cloud files in the Details pane. The pane has also been reorganized so file properties are easier to find and review at a glance. Fixed an issue where the OneDrive shortcut in File Explorer stops working when File Explorer is run in administrative mode. Fixed an issue where the confirmation dialog might display an internal Recycle Bin file name instead of the original file name when permanently deleting a file. [Sounds] Improved system sounds when using Windows in dark mode. And here is what is new in build 26220.8754: [Smart card removal policy] Administrators can now configure Azure Virtual Desktop (AVD) and Windows 365 sessions that use Microsoft Entra ID (RDS AAD Auth) authentication to automatically disconnect when a redirected smart card is removed. This extends smart card removal policy enforcement to Microsoft Entra authenticated remote sessions, helping organizations meet security and compliance requirements. [File Explorer] Fixed an issue where the OneDrive shortcut in File Explorer stops working when File Explorer is run in administrator mode. [Taskbar] Improved reliability of loading the system tray area of the taskbar. [Sounds] Improved system sounds when using Windows in dark mode. You can find release notes for build 26300.8758 here and for build 26220.8754 here.
    • Correct. Thank you unfortunately commenting on this stupid article we bring a possible more crap like that. If it gets click they post it
    • Firefox 152.0.3 by Razvan Serea Firefox is a fast, full-featured Web browser. It offers great security, privacy, and protection against viruses, spyware, malware, and it can also easily block pop-up windows. The key features that have made Firefox so popular are the simple and effective UI, browser speed and strong security capabilities. Firefox has complete features for browsing the Internet. It is very reliable and flexible due to its implemented security features, along with customization options. Firefox includes pop-up blocking, tab-browsing, integrated Google search, simplified privacy controls, a streamlined browser window that shows you more of the page than any other browser and a number of additional features that work with you to help you get the most out of your time online. Firefox key features Enhanced Tracking Protection (ETP) – Blocks trackers, cookies, cryptominers, and fingerprinters by default. Private Browsing Mode – Deletes history, cookies, and temporary files when closed. Lightweight & Fast Performance – Optimized memory usage with efficient page loading. Cross-Platform Sync – Sync bookmarks, passwords, history, and open tabs across devices. Customizable Interface – Toolbars, themes, and extensions can be tailored to user needs. Strong Privacy Controls – Options to manage cookies, permissions, and site data easily. Reader Mode – Strips away clutter for distraction-free reading. Pocket Integration – Save and read articles offline with Pocket built into Firefox. Picture-in-Picture (PiP) – Watch videos in a floating window while multitasking. Extensions & Add-ons – Vast library for productivity, security, and personalization. Built-in PDF Viewer – No need for external software to view PDFs. Firefox Monitor – Alerts users if their email is part of a known data breach. Multi-Account Containers – Isolate browsing sessions (e.g., work, personal, shopping). Performance & Resource Efficiency – Uses fewer system resources than some competitors. Open Source & Community-Driven – Transparent development with global contributions. Firefox 152.0.3 fixes: Fixed an issue that could cause extreme memory usage and freezing on startup for users with language packs installed. (Bug 2049845) Download: Firefox 64-bit | Firefox 32-bit | ARM64 | ~70.0 MB (Freeware) Download: Firefox for MacOS | 146.0 MB View: Firefox Home Page | Release Notes Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • Week One Done
      Scoobystu earned a badge
      Week One Done
    • Week One Done
      tuben earned a badge
      Week One Done
    • First Post
      OffsetAbs earned a badge
      First Post
    • Reacting Well
      OffsetAbs earned a badge
      Reacting Well
    • First Post
      Kolakid60 earned a badge
      First Post
  • Popular Contributors

    1. 1
      +primortal
      438
    2. 2
      +Edouard
      197
    3. 3
      PsYcHoKiLLa
      156
    4. 4
      FloatingFatMan
      71
    5. 5
      Steven P.
      68
  • Tell a friend

    Love Neowin? Tell a friend!