Recommended Posts

ALBANY, N.Y. (AP) - David Jimenez was so elated over his wife's recovery from cancer that he offered to clean the large crucifix outside the Hudson Valley church where he spent many hours praying for her to beat the disease. On Memorial Day 2010, he was scrubbing grime off the cross when the 600-pound marble statuary toppled over, crushing his right leg.

The then-43-year-old immigrant from Mexico was flown to Westchester Medical Center, where doctors had to amputate his injured leg. He's suing the Roman Catholic church where he was hurt, and early next year his $3 million lawsuit is scheduled to go to trial.

"He attributed her recovery to his devotion to the cross and Christ hearing his prayers," Jimenez's lawyer, Kevin Kitson of White Plains, told The Associated Press.

Kitson said he filed the lawsuit in March 2011 after the church denied it was liable for the accident that resulted in six-figure medical bills for Jimenez. The bills were paid by charitable foundations, Kitson said.

The lawsuit is scheduled to go to trial in state Supreme Court in Orange County in January, Kitson said.

On May 30, 2010, Jimenez was standing on the crucifix's base, using rags and soapy water to clean Christ's face. While holding onto the cross beam for balance, the whole crucifix snapped off at its base, sending Jimenez crashing to the ground, Kitson said. Pieces of the crucifix broke off, but the bulk of it landed on Jimenez's right leg, crushing it.

Kitson said only a single screw was holding the heavy crucifix to its base.

"There was no anchoring system, just that one screw," he said.

more

Link to comment
https://www.neowin.net/forum/topic/1118143-no-good-deed-goes-unpunished/
Share on other sites

This topic is now closed to further replies.
  • Posts

    • AnyDesk 9.7.7 by Razvan Serea AnyDesk is a fast remote desktop system and enables users to access their data, images, videos and applications from anywhere and at any time, and also to share it with others. AnyDesk is the first remote desktop software that doesn't require you to think about what you can do. CAD, video editing or simply working comfortably with an office suite for hours are just a few examples. AnyDesk is designed for modern multi-core CPUs. Most of AnyDesk's image processing is done con­currently. This way, AnyDesk can utilize up to 90% of modern CPUs. AnyDesk works across multiple platforms and operating systems: Windows, Linux, Free BSD, Mac OS, iOS and Android. Just 7 megabytes - downloaded in a glimpse, sent via email, or fired up from your USB drive, AnyDesk will turn any desktop into your desktop in se­conds. No administrative privileges or installation needed. AnyDesk 9.7.7 fixes: Fixed an issue that prevented users from creating meetings without an active license Download: AnyDesk 9.7.7 | 8.0 MB (Free for private use, paid upgrade available) Links: AnyDesk Home Page | Other platforms | Release History | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • I used a Pixel 10 Pro XL when it first came out for about 8 months. When I first got it, it was using Google assistant and that was fast, when asking it to call somone etc. Then it automatically switched with some update to Gemini. Doing even the simplist of things like asking it to call someone in my contacts was soooooo slow compared to Google assistant. I guess it had to go out to the cloud to do that? Back on iPhone and while Siri is dumb right now, it does do those simple things, like call someone, set a timer, star the stop watch etc, really fast. That an while I like Google Material Design 3 over iOS 26, they Pixel 10 Pro XL was so slow in comparison to the iPhone 17 Pro I am using.
    • I use Gemini in my rotation of AI clients...that work pays for. It is good at most things, better than copilot for imgage searching and making images, worse at writing vs Claude and way worse at hadling technical issues when it comes to Azure stuff. I also use YT premium and maps. Anything else Google is a pass for me. I have now seen multiple people locked out of their Google accounts for reasons that are just very vauge.
    • Microsoft is building an AI datacenter that "uses less water than a fast food restaurant" by Ivan Jenic Image: Microsoft Microsoft has announced plans to build a new datacenter campus in Pecos, Texas, as the company continues to invest billions in AI infrastructure. The new facility, called project Kilby, will reportedly have a capacity of 2 gigawatts and will be one of the largest single capacity additions in the company’s history. To power the campus, Microsoft signed a 20-year deal with Chevron to supply natural gas from the Permian Basin, America's largest oil field. This deal is set to become the largest collaboration to date between a U.S. oil and gas giant and Big Tech. It’s no secret that Big Tech has often been criticized for exploiting natural resources for its AI developments. Microsoft is trying to mitigate some of that negative consensus by promising to build its own power supply for the new datacenter, independent of the public grid. The Pecos datacenter will be powered by a power plant hub, built by Chevron, with up to 2.5 gigawatts of gas-fired capacity, with potential to scale to up to 5 gigawatts. The facility will include at least seven GE Vernova turbines, with first power potentially coming online as early as late 2027 or early 2028. The power plant hub is part of an approximately $7 billion investment by Chevron, making it one of the largest dedicated energy projects tied to a single datacenter campus in the U.S. Microsoft hasn’t publicly disclosed the amount it’s investing in the new datacenter. Microsoft has also committed to implementing a closed-loop cooling system that will only require an initial water charge to operate. The company said that “the total lifecycle water use of this datacenter is only a fraction of that consumed annually by a typical fast-food restaurant.” What the press release doesn’t mention, however, is how much water the natural gas plant itself will consume, or how a 20-year fossil fuel commitment squares with the company's pledge to be carbon negative by 2030. The construction of the new datacenter should provide over 6,000 construction jobs at peak build-out, and create hundreds of operational job roles once the facility is built. Via: Reuters
  • Recent Achievements

    • Dedicated
      tuben earned a badge
      Dedicated
    • Week One Done
      mnsgroup earned a badge
      Week One Done
    • Conversation Starter
      sumytbe earned a badge
      Conversation Starter
    • One Year In
      B4dM1k3 earned a badge
      One Year In
    • One Year In
      DarkWun earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      524
    2. 2
      +Edouard
      199
    3. 3
      PsYcHoKiLLa
      94
    4. 4
      Michael Scrip
      82
    5. 5
      Steven P.
      67
  • Tell a friend

    Love Neowin? Tell a friend!