Recommended Posts

Hi Guys

I need to put a PC together for my little couzin, who wants a nice gaming PC. I've put the below parts together, but i need to know am I falling short on Power requirements? Or anything along those lines. Its been a white since ive done a PC spec, so hence my question :)

PSU: Corsair Gs600

GPU Gigabyte Nvidia GTX650 2gb

MB: Gigabyte Z77X-UD3H

RAM: Transcent aXeRam Extreme Performance 8Gb DDR3 2400+ u-DIMM

CPU: Intel Core i5 3570 - 3.4Ghz

HD: Seagate Baracude 7200.12 2Tb

HD Primary: Plextor M5 S Series 64GB

Thanks

Link to comment
https://www.neowin.net/forum/topic/1134592-is-this-a-decent-buy/
Share on other sites

If you're gaming, get the GTX 660. The 650 has only 384 cores vs. the 660's 960 core count. The 650ti (768 core) is also worth looking at priced around 150 USD.

About the SSD... 2 years ago, 64 gig would have been great. 128 gig drives are too cheap to pass up these days.

drop the SSD? noooooo

I usually would say no but he sure will be better served by a 660 (or at the minimum a 650ti) than a ssd. The 650 non ti is mostly a htpc card, for gaming it is not great. Even the 650ti is nothing special an old 560 or 6950 is actually as good.

This topic is now closed to further replies.
  • Posts

    • I made a new Cinematic/Trailer for the game, this will be the intro, still a work in progress!  I also updated the Steam page with a ton of new screenshots! 👀 https://store.steampowered.com/app/3925340/Incoherence_Dark_Rooms/  
    • Closed-loop cooling and a custom 800G network protocol let the $7.3B campus run as one AI training machine. Microsoft confirmed June 23, 2026, that its Fairwater campus in Mount Pleasant, Wisconsin, is fully operational — and the engineering behind it makes the facility something fundamentally different from every data center that came before it. Where conventional cloud infrastructure racks up general-purpose servers and parcels out workloads to each one independently, Fairwater links hundreds of thousands of NVIDIA GB200 Blackwell GPUs into a single, coherent cluster using a two-story building design, 800-gigabit-per-second Ethernet fabric, and a proprietary networking protocol co-developed with OpenAI and NVIDIA. The result, according to Microsoft, is the closest thing to a purpose-built AI supercomputer that any company has ever placed in commercial operation. https://www.techtimes.com/articles/319205/20260627/microsoft-opens-fairwater-wisconsin-ai-campus-runs-one-supercomputer-via-800g-ethernet.htm  
    • Last comment on this article Decades of serving as a global manufacturing hub have allowed China to build a massive talent pool in the production sector that is almost unmatched worldwide. Decades of using "forced labor" have allowed China................. UN experts alarmed by reports of forced labour of Uyghur, Tibetan and other minorities across China https://www.ohchr.org/en/press...ibetan-and-other-minorities
  • Recent Achievements

    • Conversation Starter
      jessse3334 earned a badge
      Conversation Starter
    • Reacting Well
      JuvenileDelinquent earned a badge
      Reacting Well
    • One Month Later
      Excellence2025 earned a badge
      One Month Later
    • Week One Done
      Excellence2025 earned a badge
      Week One Done
    • Week One Done
      flexorcist earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      505
    2. 2
      +Edouard
      207
    3. 3
      PsYcHoKiLLa
      151
    4. 4
      Steven P.
      73
    5. 5
      macoman
      62
  • Tell a friend

    Love Neowin? Tell a friend!