Recommended Posts

Updates will be here now.

Life support seems to be progressing....

Space News....

Bigelow Tests Life Support System

WASHINGTON ? Bigelow Aerospace completed an initial closed-loop test in March of a prototype environmental control and life support (ECLS) system designed to support extended crew stays inside the inflatable habitats the company is building to provide research facilities and hotel accommodations in space.

The March 31 demonstration was conducted inside the company?s North Las Vegas headquarters in a newly constructed test chamber, according to Eric Haakonstad, Bigelow Aerospace chief engineer. He said the test involved locking three Bigelow engineers inside the 180-cubic-meter structure for about eight hours, during which they performed a variety of tasks that demonstrated the ECLS system?s ability to control temperature, humidity, pressure, oxygen content and the removal of carbon dioxide and trace-gas contaminants from the environment.

>

Haakonstad said the initial checkout of the test facility is the first of many demos planned over the next year to simulate and test ECLS systems in support of long-duration crew stays in orbit. He said within the next couple of months Bigelow Aerospace plans to conduct a 30-hour demonstration of the ECLS system followed by another lasting up to a week.

He said both the ECLS system and its test chamber were built in-house, giving the company more control over system development.

>

Haakonstad said Bigelow?s ECLS design incorporates lessons learned from systems used aboard platforms including the international space station, the Mir space station, the space shuttle and, to a lesser extent, the Orion crew capsule currently under development by NASA.

?We?re not reinventing the wheel here,? Haakonstad said. ?All we?re trying to do is take the technology development that our tax dollars through NASA have developed and package them into a more producible form factor. We?re not trying to be cutting edge in terms of technology; we are trying to be cutting edge in terms of affordability and availability and ruggedness.?

However, unlike ECLS systems designed for short-term trips between Earth and the space station, Bigelow?s ECLS system is designed to support long-duration missions on orbit.

>

  • 2 weeks later...

To be totally honest I'd be more excited if they turned the idea of the inflatable station into a moon base or something awesome like that; if you made a facility huge enough on the moon it should be self sustainable. Are there any plans of using the idea on a moon base?

Absolutely!! Bigelow has a whole set of patents for a landable base complex to be assembled at EML-1, a gravitational equilibrium point between Earth & Moon that's a perfect place for space docks, fuel depots etc. More Bigeliw info & pics in this thread -

https://www.neowin.net/forum/topic/979120-bigelow-aerospace-long-term/

SatNews....

Robert Bigelow, Founder and President of Bigelow Aerospace, will be the Honored Keynote Speaker at the ISDC Governors' Dinner and Gala to be held in the Davidson Center at the U.S. Space & Rocket Center in Huntsville, Alabama on May 20.

>

Mr. Bigelow will also receive the National Space Society?s Space Pioneer Award for Space Development for his efforts to advance the technology of space habitats....

>

he deserves these honors, i'd name a few characters/ships after him were i a notable sci fi writer/hollywood bigwig...

and yes, Doc has been telling us about their moon base plans for a while now. i really hope they become reality by the end of this decade.

All at Google Patents - search for "Robert T Bigelow." these are the applications.

When looking at the base remember that while the hab walls are expandable & flexible at first, they are rigid after deployment. The habs also have metal cores and bulkheads at either end, making the whole structure very strong. Docking them to the solid metal hub/propulsion buses, which use the same attachment used at ISS, makes for a very solid structure.

Basic satellite bus (habitat)....

Impact shield....

Landable base....

Emergency safe haven....

Biomass disposal....

Bigelow has estimated each BA-330 module would cost ~$100M. As to the cost of the propulsion bus/hubs - that's pure guesswork, but guess high at the same as a module and you have a (probably high) cost of ~$1B for the base plus launch costs of $125M per Falcon Heavy which could well do two-fer launches.

Now consider that NASA spent ~$40B on the Constellation program over the last 6 years and have nothing to show but a cancelled program and an Orion spacecraft that may never fly, especially if Dragon works as advertised.

jesus, we could have had an entire city up there now for 40 billion...what were they thinking? or is this the true, ugly face of corruption? thanks for the figures, that's quite economical, really. i have no idea why we're not doing it then. you want to tell me we could go to Mars and establish an outpost there for like $20 billion or so? and we're still not doing it?

If we had used $0.02 worth of common sense we could have been on Mars 20+ years ago. More numbers for you -

US cost of ISS: $100 billion

2x larger volume than ISS Bigelow station: less than $1 billion

Shuttle flights: $1.5 billion, each

Falcon 9 flights: $56 million

Cost of Dragon fligyr: $133 million

Falcon Heavy flights : $80 - $125 million (2x the cargo of shuttle)

and a few examples of what $600 million pays for -

Ares I-X test flight: not light hardware. It only tested the shape & failed

Launch tower for Ares 1-X

What Congress spent on Constellation after it was cancelled

TOTAL development cost of Dragon & Falcon 9

They don't, other than blaming previous administrators, Congress/s, presidents etc. etc. etc. going back 40+ years.

Fact is a lot of things contributed including not being willing to try the new - especially if it meant a congressman/senator's district losing an existing contract. This is why Congress is demanding a Shuttle-derived heavy launcher instead of opening it up to competition - ATK (the makers of the shuttle's solids), the NASA centers that would be involved and such are in the districts of very influential representatives. Some of it was just bad decision making.

this is the truth i always try to lie to myself about, thanks for reminding me of the reality of things. progress is at the mercy of idiots and short sighted con artists. i really hope this will change soon. i hope it will be realized by all that there's endless wealth to be made from space exploration, and then greed will take us forward. i know, sounds evil, but then it took just that to get humans to pretty much do anything of any material value ever since we left the African veldt all those many millennia ago...

  • 2 weeks later...

ISDC = International Space Development Conference at the Von Braun Center in Huntsville, Alabama (near a NASA center)

These are the slides from their presentation -

http://images.spaceref.com/news/2011/isdc.bigelow.pdf

Their new 180,000 sq/ft factory is almost finished, and they've reduced the launch mass og the huge BA-2100, now known as Olympus, to 65 metric tons from the originally quoted 100 metric tons. This puts it wjthin the margins of a Falcon Heavy with a Raptor (hydrogen) 2nd stage or NASA's proposed SLS system.

Also interesting is their concept for NASA's Plymouth Rock asteroid mission; a BA-330 as the hab, a crew return vehicle and one of their big hub/propulsion modules for a crew of 4. Nice....

  • 2 weeks later...

Bigelow Aerospace space station factory update June 6, 2011

180,000 sq/ft just outside of Las Vegas for the construction of BA-Sundancer, BA-330, BA-Olympus, docking nodes, 2 sizes of propulsion buses, and the integration of life support, maneuvering, avionics and other subsystems. First launch manifested is for a BA-Sundancer in 2014 atop a SpaceX Falcon 9.

Current ->> new construction, which is a full 700' long

Bigelow-Map.gif

img20110606-007.jpg

img20110606-014.jpg

img20110606-006.jpg

img20110606-018.jpg

img20110606-023.jpg

img20110606-025.jpg

img20110606-027.jpg

img20110606-015.jpg

Here's another number for you; this 180,000 sq ft exapasion will take their total up to 370,000 sq ft

This includes offices, R&D, factory space, testing, vehicle integration and a large mission control center, which they had to build early because of having 2 Genesis modules already in orbit as testbeds. Yup, like SpaceX they're already flying.

Mission Control

mission-control-last.jpg

missions-control-first.jpg

mission-control.jpg

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Ummmm that is what is it supposed to do. Just turn if off in settings if you do not want it analyzing your open tabs. Chrome does the same thing with Gemini. Sarfari will do the samething after Apple's AI and even more so with the release of their 27 versions that is now powered by Googles LLM/ML models. Understanding why it is doing it and how it can help you vs jumping to some conspiracy theroy is a much better approach. As long as it can be turned off, all is good. Yes the default should be off but the a lot of people would never discover these features.
    • Just another reason (aside from many others) not to use Edge. Firefox 153.0b5 DEx64 has a similar feature added recently in prior builds that I will turn off at some point when I get around to it. It's the new "Something looks suspicious" page that pops up here and there. It cleverly hides itself between web pages that I've actually visited; as a result, you know, of selecting a web page and telling the browser where to go. The interesting thing is that it does not produce these warnings from pages that I, as the only intelligent user of the browser in my system, have ever directed the browser to open! What seems to be happening is that the browser looks at all the goofy ad links on a web page I do actually open and selects one that "looks suspicious" and then creates the "something looks suspicious" web page, which is neatly inserted, as mentioned, between web pages my RB ("real brain") has directed the browser to load in a session. The thing is, I usually look at links I am considering to follow before I ask the browser to load them, and in cases I have noticed where the link does indeed look suspicious, most of the time I will choose to not follow the link at all. Doesn't everyone do this or something similar? I am picky about what I voluntarily load... (I don't like links that start off fine, with a site designaiton that seems normal enough but then is followed by indecipherable alphanumeric strings many, many lines long, etc. I tend to reject those because they look suspicious. They may not be, but I don't care... I'll stay with Firefox, of course, if for no other reason than they usually let you turn off the junk you don't like. And because it isn't Edge... But at some point Microsoft will come to realize that putting your bookmarks on the left side is a Good Thing for a lot of people, just as Microsoft discovered when it had the bright idea of nailing the Windows taskbar to the bottom of the screen, when for decades Microsoft browsers had left that placement up to the user. They have finally reversed the obscenity of that decision. Finally.
    • Google was using the old CATPCHAs data to train their LLMs. What is the say they won't use this camera data of users to train their LLM? these companies need some strict regulations!
    • Depends on what you need. Might be a bit clearer on what you plan to do with it. Sort of a waste if you get the newest and greatest, but don't know how to use it.
    • NTLite 2026.06.11200 by Razvan Serea NTLite is a Windows configuration tool that allows you to modify your existing Windows install or an image yet to be deployed, remove Windows components, configure and integrate, speed up the Windows deployment process. Reduce Windows footprint on your RAM and storage drive memory. Remove components of your choice, guarded by compatibility safety mechanisms, which speed up finding that sweet spot. Windows Unattended feature support, providing many commonly used options on a single page for easy setup. Easily integrate a single or multiple drivers, update or language packages. Package integration features smart sorting, enabling you to seamlessly add packages for integration and the tool will apply them in the appropriate order, keeping hotfix compatibility in check. One of the important new features of NTLite (compared to its predecessors) is the ability to modify an already installed the operating system, by removing unnecessary components. Supports Windows 11, 10, 8.1 and 7, x86 and x64, live and image. Server editions of the same versions, excluding support for component removals and feature configuration. ARM64 image support in the alpha stage. Does not support Checked/Debug, Embedded, IoT editions, nor Vista or XP. NTLite 2026.06.11200 changelog: New Secure Boot Migration support: Verification, certificate staging, and boot-manager/sector update across the Image, Updates, Apply, and Create-ISO pages (2023 CA migration, optional 2011 revocation, Anti-rollback, Boot sector choice etc) Secure Boot Host Readiness: Live host Secure Boot migration monitor and Servicing-task control Option under Image page - C:\Windows row, or load the host as the target - Updates - Secure Boot Image: 'Sort mounted images first' option for the image list in Menu-Settings UI: Hover description card for Components and Unattended pages, selectable text and quick access to Compatibility options Command line: Relay commands into the already-running instance Enables controlling already running NTLite via ntlite.exe Use /NewInstance to launch an additional instance using CLI operations (premium) UI: 'New instance' option via main menu instead of a secondary ntlite.exe prompt Apply: Hide individual Apply-page notes with a per-note dismiss (X), critical excluded Settings: 'Unsigned RDP file launch warnings' tweak (RDP client), bypassing the April 2026 security-update prompt on RDP connections Upgrade Image: Live OS and deployed image editing now unlocked on free/test licenses, same licensing as images Image: 'Recompress' option in manual dialog Remove Editions to shrink the WIM in one session Image: SWM part size set inline on the Apply page and image dialogs, split-size popup retired Image: Relative 'Last change' dates; editions grouped by build time to reduce noise Image: 'Forget - Missing' on the Edit-cache menu to mass drop entries whose folder is gone Components: Root groups reorganized - user-facing groups first, system/critical last Components: Show filter options to view components by Template or App-type, since Apps are now merged into groups Presets: Delete confirmation now lists the multi-selected preset names UI: Design update propagated to the rest of the tool UI: Filter and search match words in any order and partially, better results filtering Components Unattended: Input-locale language derives from the user locale, with an independent keyboard picker, enables combinations previously unavailable Unattended: Input-locale now allows for a user value override Unattended: Localization OOBE WinPE now can be copied with the new WinPE Copy OOBE localization toggle, enter locale settings once for both stages Updates: Downloader greys and locks updates the image already carries (hotfix and MSIX) Updates: Resume interrupted update downloads Command line: Many upgrades, see /?, now prints help to the console or redirected output UI-Translation: Finnish language added, also thanks for Chinese Traditional (Matt), French (tistou77), Italian (clarensio), Russian (RDS), Swedish (1FF), Vietnamese (Vu Anh Vu) Fix Components: Containers removal breaking Apps deployment Components: Microsoft Account had leftovers when Easy Migrate is kept Image: Export to an existing WIM improvements, Append renamed to Merge Image: Improved 26H1 live removal support Image: No more 'X:\ not accessible' popup for certain drives during image scan Presets: Manual image refresh picks up presets added/removed outside the app Tweaks: Disabled visual-effect animations no longer return after first logon on a new profile Tweaks: Live Visual Effects toggles (animations, drag full windows, font smoothing) now apply correctly Download: NTLite 2026.06.11200 | 20.5 MB (Free, paid upgrade available) Link: NTLite Home Page | NTLite Features | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • One Year In
      BA the Curmudgeon earned a badge
      One Year In
    • Conversation Starter
      rosiecharles earned a badge
      Conversation Starter
    • First Post
      KMilenkoski1202 earned a badge
      First Post
    • First Post
      carols23 earned a badge
      First Post
    • One Month Later
      Tom Willson earned a badge
      One Month Later
  • Popular Contributors

    1. 1
      +primortal
      510
    2. 2
      +Edouard
      258
    3. 3
      PsYcHoKiLLa
      151
    4. 4
      Steven P.
      94
    5. 5
      macoman
      66
  • Tell a friend

    Love Neowin? Tell a friend!