Some WinRT apps = no scrolling with Synaptics touchpad


Recommended Posts

I've noticed that some WinRT apps that are built on C++/C# (not HTML/JS apps hosted in Internet Explorer) have non-functional scrolling if you use a laptop with a Synaptics touchpad, and try to use either one or two finger scrolling in the app's main client area. Example apps are Tweetro and Cocktail Mix.

Scrolling does work without the Synaptics drivers, when Windows treats the touchpad as a generic mouse, so something is clearly broken in the Synaptics drivers. I've tried the OEM set and the ones from their site without success.

I sent feedback to the Tweetro developers at-least a while ago, and they said it will come eventually. Developers can get it working, but most don't seem to have had.

Our best hope now is that new Synaptics Gesture Suite due soon.

This topic is now closed to further replies.
  • Posts

    • I used a Pixel 10 Pro XL when it first came out for about 8 months. When I first got it, it was using Google assistant and that was fast, when asking it to call somone etc. Then it automatically switched with some update to Gemini. Doing even the simplist of things like asking it to call someone in my contacts was soooooo slow compared to Google assistant. I guess it had to go out to the cloud to do that? Back on iPhone and while Siri is dumb right now, it does do those simple things, like call someone, set a timer, star the stop watch etc, really fast. That an while I like Google Material Design 3 over iOS 26, they Pixel 10 Pro XL was so slow in comparison to the iPhone 17 Pro I am using.
    • I use Gemini in my rotation of AI clients...that work pays for. It is good at most things, better than copilot for imgage searching and making images, worse at writing vs Claude and way worse at hadling technical issues when it comes to Azure stuff. I also use YT premium and maps. Anything else Google is a pass for me. I have now seen multiple people locked out of their Google accounts for reasons that are just very vauge.
    • Microsoft is building an AI datacenter that "uses less water than a fast food restaurant" by Ivan Jenic Image: Microsoft Microsoft has announced plans to build a new datacenter campus in Pecos, Texas, as the company continues to invest billions in AI infrastructure. The new facility, called project Kilby, will reportedly have a capacity of 2 gigawatts and will be one of the largest single capacity additions in the company’s history. To power the campus, Microsoft signed a 20-year deal with Chevron to supply natural gas from the Permian Basin, America's largest oil field. This deal is set to become the largest collaboration to date between a U.S. oil and gas giant and Big Tech. It’s no secret that Big Tech has often been criticized for exploiting natural resources for its AI developments. Microsoft is trying to mitigate some of that negative consensus by promising to build its own power supply for the new datacenter, independent of the public grid. The Pecos datacenter will be powered by a power plant hub, built by Chevron, with up to 2.5 gigawatts of gas-fired capacity, with potential to scale to up to 5 gigawatts. The facility will include at least seven GE Vernova turbines, with first power potentially coming online as early as late 2027 or early 2028. The power plant hub is part of an approximately $7 billion investment by Chevron, making it one of the largest dedicated energy projects tied to a single datacenter campus in the U.S. Microsoft hasn’t publicly disclosed the amount it’s investing in the new datacenter. Microsoft has also committed to implementing a closed-loop cooling system that will only require an initial water charge to operate. The company said that “the total lifecycle water use of this datacenter is only a fraction of that consumed annually by a typical fast-food restaurant.” What the press release doesn’t mention, however, is how much water the natural gas plant itself will consume, or how a 20-year fossil fuel commitment squares with the company's pledge to be carbon negative by 2030. The construction of the new datacenter should provide over 6,000 construction jobs at peak build-out, and create hundreds of operational job roles once the facility is built. Via: Reuters
    • A lot of uncertainty in this story. Might. Could. Maybe. The truth is we don't know what will happen to the universe in the end, or if it will end. Our own Milky Way galaxy will merge with the Andromeda galaxy in about 2.5 billion years, with our solar system as part of a new, larger cluster. I guess we'll have to and see how it goes down.
  • Recent Achievements

    • Dedicated
      tuben earned a badge
      Dedicated
    • Week One Done
      mnsgroup earned a badge
      Week One Done
    • Conversation Starter
      sumytbe earned a badge
      Conversation Starter
    • One Year In
      B4dM1k3 earned a badge
      One Year In
    • One Year In
      DarkWun earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      523
    2. 2
      +Edouard
      195
    3. 3
      PsYcHoKiLLa
      94
    4. 4
      Michael Scrip
      82
    5. 5
      Steven P.
      67
  • Tell a friend

    Love Neowin? Tell a friend!