Recommended Posts

And people wonder why NewSpace is moving so fast and NASA's stuck in 2nd gear....

Flirida Today....

Telescope debacle devours NASA funds

Hubble's successor is billions of dollars over budget, 7 years late

The mission

James Webb Space Telescope will help scientists look further into space and back in time to better understand the origins of the universe and life itself. Highlights include:

SPACECRAFT

Telescope?s primary mirror is a group of smaller mirrors. Assembled, it?s more than 21 feet across.

--Observatory components must be kept cool using a tennis court-size sunshield, which must be unfurled in space into a sort of umbrella blocking the heat of the sun. The observatory will be kept at almost 400?degrees below zero.

WHERE IT?S GOING

A million miles from Earth, or four times farther away from Earth than our moon.

WHAT IT DOES

Infrared telescope designed to find the first galaxies that formed in the universe.

--Searches for the first light of stars and initial formation of galaxies and planetary systems.

Timeline

The James Webb Space Telescope, previously named the Next-Generation Space Telescope, has faced a decade of cost growth and delays since the program was green-lighted. Here?s a look at its history:

1997

NASA first starts spending money on technology-development work for what becomes the James Webb Space Telescope.

2002

NASA formally names the observatory after James Webb and selects major contractors.

2003

Cost estimate approved at $1.6 billion. Launch targeted for 2011.

2004

Launch set for 2011; analysis ongoing about whether to blast off on U.S. rocket from Cape Canaveral or European rocket from South America.

2005

NASA gets approval to change launch vehicle and site, picking South America; budget problems lead to first major overhaul of the project. Cost has grown to $4.5 billion. Target launch date delayed two years to 2013. ?

2006

Re-planning work leads cost to grow to $5 billion. Target launch date slips to 2014.

2010

Independent review panel led by veteran space project manager John Casani finds major management and budget problems with telescope program, delivering new cost estimate of $6.2 billion to $6.8 billion and a best-possible launch date of late 2015.

2011

NASA is restructuring program, delaying the target launch date to 2018 and conceding budget will go up again.

NASA?s next great space telescope will cost taxpayers at least four times more than planned and launch at least seven years late.

Considered by scientists the most important space mission of the decade, the James Webb Space Telescope project is being overhauled for the second time in five years because of skyrocketing costs and cascading schedule delays.

Decision-makers initially were told the observatory would cost $1.6 billion and launch this year on a mission to look deeper into space and further back in time than the Hubble Space Telescope, in a quest for new clues about the formation of our universe and origins of life.

NASA now says the telescope can?t launch until at least 2018, though outside analysts suggest the flight could slip past 2020. The latest estimated price tag: up to $6.8 billion. NASA admits the launch delay will push the bill even higher.

And, scientists are worried the cost growth and schedule delays are gobbling up more and more of the nation?s astronomy budget and NASA?s attention, threatening funding for other space science programs.

Some fear the dilemma will get worse if the replanning work this summer forces NASA to shift billions more science dollars to Webb to get it back on track.

So, what went wrong? A FLORIDA TODAY review of five years? worth of budget records, status reports and independent audits show the Webb observatory is plagued by the same, oft-repeated problems that caused most major NASA projects to bust their budgets and schedules.

In short, mistakes included:

--NASA and its contractors underestimated the telescope?s cost and failed to include enough reserve cash to handle the kinds of technical glitches that always crop up in development of a complex spacecraft, including many expensive risks managers knew about.

--Leaders at agency headquarters in Washington and Goddard Space Flight Center in Baltimore, which led the project before the problems came to light, failed to act on repeated warnings that cash flow was too tight and technical glitches too many to meet the budget or schedule.

>

>(3 more pages)

poor NASA...if only...if only... :alien: talk about opportunities lost.....oh well, at least SOME brilliant minds are behind what we'll see (as US citizens), and not some over-regulated program, like NASA's approach....I don't see how cutting NASA out of our budget ever really helped things, but then again, who am I? Oh, that's right...a registered voter, who didn't vote for any of it....I love the thought of extra-planetary exploration, and stood behind NASA since the 80's, but did my vote count in the end? H to the E double EL NO!!! I say, whomever discovers how to build the proper telescopes...RIGHT ON!!!!...but to the US space program? Weeeelllll.....that's another story all on its' own. I just don't want any BS censorship, if there IS life out there, just let us all know, so we can quit giving a darn about a conspiracy....I think the world would be a better place if we'd all just be honest, and not hide anything....NOT like the current US government (and I'm not going all alex jones, either, I'm just stating personal opinion...nothing more, nothing less), I'm just saying... </rant>

this really make me want to cry. i was so looking forward to it going up, it will be a major milestone on our way to proper space exploration. and this incompetence keeps getting in the way! why, Doc, why! seriously, if i was so miserable at what i do i literally would not last a week. how is it that these people entrusted with the future of humanity are so reckless?

obi - a skeptic mind is a healthy mind. while i ultimately do not believe there's any conspiracy, the healthy skeptic is inclined to wonder why it seems our space exploration efforts are almost always held back and seemingly sabotaged at the last minute. this is something that does lend itself well to conspiracy-thinking. however, i believe it's just the result of human negligence, incompetence, short-sightedness, greed and plain old stupidity. going to space is the big and difficult thing everyone knows we'll have to do one day but no one has the cajones to go and do properly. like a lot of things in human history, they'll get around to it for sure when they run out of options. i still believe we will do the right thing before then. i do believe that the realization is sinking in that we are back in the 15th century, it's either fund the ships and become a vibrant empire that leads to an entire new world for humans to inhabit and make their own, or don't fund the ships and sink into mediocrity and poverty. every time i read poverty statistics i feel like screaming, how come the people in positions of power don't realize that space exploration and settlement can literally expand our global economy by a factor of about a million? it will eliminate poverty, it will make us a spacefaring species, another step closer to fulfilling the destiny of any sentient lifeform. i believe we were chosen, and every day we stay exclusively on this Earth, not only are we indeed killing our mother a little more, but we are in fact digging our own grave by way of inaction.

that's the end of this particular rant.

Why? Lots of causes.

To-Down design. Instead of giving line engineers a set of fixed operational goals and turning them loose SpaceX style, they've been designing things in a board room, sending the engineers conflicting goals, then changing things at the next design review, necessary or not.

Political goals. 70% of politicians only think of space in terms of how many jobs and how much pork it brings to their districts. Just the infighting causes delays and needless expense.

NIH - not invented here. Never mind if a new way makes sense and saves money, it's not the way we've done it for the last 50-60 years.

1 does, 10 watch. One guy drives in and torques a screw and it takes 10 inspectors checking him and each other before it gets a sticker, then 6 other people chevk & re-check the paper the sticker was peeled from.

Anal doesn't begin to describe it, but then they let things like shuttle SRB's be fired st subzero temps.

Etc. etc. etc.

You get the idea.....

i definitely do, that was a very good description. it's just horrible that this is the state of NASA and state-sponsored space development. however, i am fully familiar with this kind of mentality from my own work, where the organization has way too many decision makers (i.e. people who get in the way of any progress and common sense) and a chronic inability to just do things because they're good. however, in my profession the future of the species factor is far less relevant than for NASA. thanks again for putting things in perspective. what's your prognosis for the Webb? when will that big boy finally go up?

... the healthy skeptic is inclined to wonder why it seems our space exploration efforts are almost always held back and seemingly sabotaged at the last minute.

Should be glaringly obvious the reasons for the repeated, hold-backs in Space exploration.

But I shall wait for you all to catch up. ;)

I'm not sure why people expected something different. When you're building one of the most sophisticated space instruments to ever be launched from scratch of course its going to cost a lot of money.

With that being said, i'm not happy with the delays, but what did you really expect? Hubble was WAY over budget and extended missions many times over but damn, the science was worth it. JWT will be the same.

Either way, the space telescope pales in comparison to defense spending so the cost is really a dip in the bucket compared to amount of money we BLOW on BLOWing crap up. JSF and 300+ billion comes to mind :)

I'd cancel the project since there waisting lots of tax payers money. Hell by 2018 i bet they'll say we need more money since there some problem or glitch with The James Webb Space Telescope. If i was president oboma or member of congress i'd kill The James Webb Space Telescope project since there waisting Billions of dollars that could be spent on somthing else like fixing roads or replacing old bridges or somthing else.

blahism - the problem is that lessons from the Hubble were apparently not learned. we're making the same damn mistakes to the detriment of all of humanity.

casper - will give you the benefit of the doubt that you're not just trolling, but this project is more important than the overpass next to your house. besides, NASA is a national agency. fixing roads and bridges is technically the responsibility of your local government. blame them for needing to rely on federal funds to do these things.

If he doesn't like the space or military programs then he should toss his phone service, TV, and most anything else technological because it's either derived from space/military tech or dependant on their architectures.

Internet? ARPANET, a DoD military program.

Camera CCD's? First major use was for KH-11 spy sats.

US Comm satellites? Mostly launched by Atlas V and Delta IV, both developed for the USAF's EELV program, or former Russian ICBM's.

Only recently have US commercial launchers got a foothold, and even here we see military footprints; Falcon Heavy's largest market will be NRO spysats and Falcon 9 has already launched satellites for the US Army and NRO, all as secondary payloads with the Dragon.

The problem isn't lack of a booster, it's slated to go up on an Ariane 5. The problems are with the JWSTitself, both design and budgetary. Can't fix those just by moving it to Falcon Heavy or whatever. One example of how late they are is that they have just started testing its mirror panels at the crogenic temperatures it'll encounter. If there's an issue that 2018 date could be very optimistic.

well said Doc, people totally underestimate the catalytic effect space exploration has on every other area of technology. without it we'd be 50 years behind. even the passenger planes we take have gotten progressively safer and better thanks to space. it's important to remember we've only been flying in our own atmosphere for just over a 100 years, and look at how much has been achieved.

as for the Webb, if they're only now testing the mirrors, how the **** did they expect to launch in 2011?

  • 2 weeks later...

as for the Webb, if they're only now testing the mirrors, how the **** did they expect to launch in 2011?

Last I checked the launch was scheduled for 2014 and is expected to be 2015. If 2010-2011 was ever a date, it was probably a date before construction started. News so far says probably 2017 or 2018..

either way, a lot has changed since the projects inception.. and the total cost to get the science we will achieve is still less than what it costs to run Air conditioners for our troops in iraq/afghanistan for a year.. not that i don't want to provide them AC, it just gives a little perspective.

Scuttlebutt abounds that NASA just cut the hours of the 15 contractural employees working on JWST's over-budget OSIM (Optical SIMulator) to just 20 hrs/week from at least July to October. This makes them part-timers, so NASA saves much of the cost of their benefits in addition to the reduced hours. Odds are quite a few will just flat quit.

That's going to move thie timeline significantly to the right, again.

very sad to hear that, this was supposed to be a big step for us. i hope it can still be salvaged. however, looks like Moon and Mars missions are taking priority. honestly, i think that's a good thing, but not at the expense of the Webb.

Latest review. Funding very questionable, thermal stability problem with mirror segment, etc.

Internal NASA GSFC Report: Weekly Input May 14, 2011- May 21, 2011 Submitted to Code 550

Source: Goddard Space Flight CenterPosted Thursday, June 30, 2011

From:

Sent: Thursday, May 19, 2011 1:26 PM

To: [email protected]

Subject: weekly report

All,

See attached for the input received this week for the Division Report. Enjoy!

WEEKLY INPUT May 14, 2011- May 21, 2011 SUBMITTED TO CODE 550

CODE 550

No Input

CODE 551

ICESat-2 - Rene Boucarut/551: ATLAS Laser Beam Combiner Plate (BCP) on BK7 glass has been received from CVI. Accuracy of the BCP raytracing model has been incrementally directed. Results of the BCP model are communicated with the ATLAS optics designer Luis Ramos-Izquierdo (551). Results of study are to be delivered to Rene Boucarut (551), ATLAS Optics PDL. PCB mechanical designer (Timothy Filemyr) is informed about the results of the study.

JWST ISIM - Davila and Mehalick/551: The JWST Standing Review Board (SRB) outbrief to the project was held last Friday. The SRB heard from the project regarding the new baseline plan (including budget and schedule) for a launch date of fy18. The SRB reported that the new baseline plan for JWST was not viable due to lack of sufficient funding in fy11 and fy12, rapid ramp-up of support planned for fy13 and marginal reserves for the years fy13 fy18. The SRB was very complimentary of the new OTIS testing structure, and systems engineering take-over by GSFC.

JWST ISIM - Davila/551: JWST PIL (Pupil Imaging Lens) user community (ISIM, JSC, WFS&C group) gave the green light to Lockheed Martin for their new proposed singlet design of the NIRCam PIL. The ISIM Optics team evaluation of the new design shows that it will be suitable for optical tests that are planned at ISIM level for optical verification. One important cross-check test will possibly be compromised, but our team is still in the process of evaluating the performance for this case. Lockheed Martin will move forward with the new design and is preparing for a CDR.

JWST ISIM - Davila/551: Requested that George Hartig be an Optical Test Conductor for ISIM level cryo-vac tests. He agreed. Planned support now includes: Pam Davila (lead test conductor) with Ray Ohl and George Hartig supporting.

JWST ISIM - Davila/551: Held cost review with Project Management Jamie Dunn and Resource Analysts; our costs projected to end of this fiscal year are very tight with no margin; suggestion was made to drop some support now to add extra margin in light of possible additional I&T Work Directives that may be forthcoming from Analex.

JWST OSIM - Dean/551: Developed an algorithm interface for handing amplitude recovery during phase retrieval as a component of the optimization interface. The interface allows the user to select between several different amplitude models. Debugging code this week and then will apply to the BIA (Beam Image Analyzer) PHARET data. The PHARET is an imaging array on stages and will be configured with the BIA for phase retrieval during OSIM cryo-testing.

JWST OSIM - Leviton/551: Evaluating BIA (Beam Image Analyzer) linear encoder images for possible scale contamination. Experimenting with encoders that use webcams for image sensors to enable very cheap, very high accuracy position readouts for laboratory GSE mechanisms using USB 2.0 interface.

JWST OTE - Howard/551: Blind Test JSC Aft Optical System (AOS)-ISIM test: "Nominal" data set for 0.5 pass configuration delivered and reviewed by Team B. Minor discrepancies: MIRI wavelength incorrect, labeling inconsistencies. This week: single error dataset delivery (AOS-ISIM B-datum alignment error).

ICESat-2 - Boucarut/551: Held successful kick-off of in-house development of parts for Lateral Transfer Retroreflectors (LTR ); participation from Mike Mulloney, Bryan Martin, Rick Gore and Dick Carter; working with Molly Fahey/554 on ray trace through Polarizing Beam Combiner and the Beam Dump Assembly; looking into new lab space for verification testing 5:W051 may be available; looking into if 551 capability can be used to develop ATLAS coatings (M. Quijada/551, F. Threat/551); Addressing possible thermal load to main fold mirror from Start Pulse Detector electronics.

IXO - Saha/551: Analyzed metrology data of 489P&S2152 mirror segments measured in CT4 mount. Segments have a few large defects degrading the performance. Analyzed PO set of metrology data measured on 489P2136 segment mounted on CT4 mount in the thermal box in place for a long time period. Significant improvements in the repeatability were seen because of the thermal box. (100%) Analyzing metrology data of 489P2136 mirror measured using CT3 mount and thermal box to protect the mirror from thermal fluctuations. (30%) Analyzed calibration data measured on 60-degree null lens.

Other Mission Highlights - Content/551: WFIRST SDT (Science Definition Team) agreed with project recommendation to adopt unobscured 1.3m aperture design for its initial baseline Design reference mission. Project charts presented to SDT by D. Content.

CODE 552

Susan Breon/552 - The Astro-H Adiabatic Demagnetization Refrigerator (ADR)/Test Dewars/ADR Controller (ADRC) Engineering Peer Review was held this week. The Review was chaired by Susan Breon/552. Panel members included Jim Tuttle/552, Sandra Irish/542, Rodger Farley/543, Matt Garrison/545, Jerry Karsh/564, Steven Feng/564, and Damon Bradley/564. Presentations at the review were made by Code 552 members Mike DiPirro, Peter Shirron, Bryan James, Raul Martinez/BATC, Nick Galassi/542, and Tom Bialas/564.

The budget is insuffucient, the plan is suspect, some of the mirrors aren't imaging as expected without extra thermal isolation and there is almost no wriggle rooom in the plan for antything to go wrong. May have to be delayed, again. This despite some work being reassigned to improve management and oversight.

Brian Berger, Deputy Editor at Space News, has Tweeted:

"House CJS mark also terminates funding for [JWST] , which is billions of dollars over budget and plagued by poor management"

UPDATE:

http://spacenews.com/civil/110706-nasa-budget-cancel-webb.html

NASA Budget Bill Would Cancel Webb Telescope

WASHINGTON ? The House appropriations panel that oversees NASA unveiled a 2012 spending bill July 6 that would pull the plug on the budget-busting James Webb Space Telescope as part of a broader $1.6 billion cut that would roll back spending on the nation?s civil space program to pre-2008 levels.

The $16.8 billion top-line figure, released July 6 in draft legislation from the House Appropriations commerce, justice, science subcommittee, is nearly $2 billion less than U.S. President Barack Obama?s 2012 budget request for NASA.

The draft appropriations bill, which the subcommittee is scheduled to vote on July 7, also includes $1.95 billion for the Space Launch System ? the heavy-lift rocket Congress ordered NASA to build for deep space exploration. The proposed 2012 funding level is $150 million more than the heavy lifter got for 2011, but some $700 million below the amount recommended in the NASA Authorization Act of 2010, which became law in October.

The bill also would provide $812 million for the Joint Polar Satellite System, or JPSS, being developed by the National Oceanic and Atmospheric Administration (NOAA).

That amount would be an increase of $430 million from the amount appropriated for the program in 2011 but $258 million less than the agency requested. In total, NOAA would receive $4.49 billion next year, $103 million less than was appropriated for 2011 and $1 billion less than the administration?s request for 2012.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Anthropic introduces Claude Tag, a new AI teammate for Slack by Fiza Ali Anthropic has announced Claude Tag, a new feature that lets teams work with Claude directly inside Slack. The idea is simple: once Claude is added to a Slack workspace and given access to selected channels, users can tag @Claude in conversations and assign tasks. Claude can then work through those requests using connected tools and data sources before posting its results back into a Slack thread. What makes Claude Tag different from a typical chatbot is that it's designed to operate as a shared assistant for an entire team rather than a single user. Everyone in a channel interacts with the same Claude instance. This allows the team members to see ongoing work and continue tasks started by others. Furthermore, Anthropic says the AI can build context over time by following conversations in channels where it has permission to operate. This means users don't have to repeatedly provide the same background information for every request. The system is also designed for asynchronous work. Instead of waiting for responses in a chat window, users can assign a task to Claude and return later once the work is complete. Anthropic says Claude can break larger requests into multiple steps and use connected tools to complete them. Moreover, the system can also schedule follow-up tasks and continue working on projects over extended periods. Another feature allows Claude to keep the users updated and follow up on unresolved tasks when its optional "ambient" mode is enabled. The company says the tool is already being used internally for software development, data analysis, support workflows, and debugging. According to Anthropic, around 65% of its product team's code is now generated through its internal version of Claude Tag. For organisations concerned about security, administrators can control which channels, tools, and data sources Claude can access. Separate Claude instances can also be configured for different departments, helping keep information isolated between teams. Administrators can also monitor activity logs, review completed tasks, and set spending limits at both the organisation and channel level. Claude Tag is now available in beta for Claude Enterprise and Claude Team customers and runs on Claude Opus 4.8 that was announced this May. The feature will also replace Anthropic's existing Claude in Slack application, with current users able to migrate within a 30-day migration window. Lastly, eligible customers will receive introductory credits to help teams evaluate the new experience.
    • Beats Studio Pro wireless over-ear ANC headphones drop to their lowest price yet by Fiza Ali Amazon is currently offering the Beats Studio Pro headphones at their all-time low price. The Studio Pro use 40mm active drivers which are designed to improve clarity and reduce distortion compared to previous models, with up to an 80% improvement over the Beats Studio3 Wireless. A built-in digital processor adjusts frequency response to keep the sound balanced rather than overly boosted in any one area. They also include Active Noise Cancelling that adapts to your surroundings to reduce background noise along with a Transparency mode that lets outside sound in when you need awareness of what’s going on around you. Furthermore, the headphones support personalised Spatial Audio with dynamic head tracking as well as Dolby Atmos playback on supported content. Moreover, built-in voice-targeting microphones improve call quality. You can also switch between three sound profiles including Beats Signature for balanced music playback, Entertainment for films and gaming, and Conversation for clearer voice in calls and podcasts. Physically, they are designed to be worn for long periods without feeling heavy or awkward. The ear cushions use UltraPlush engineered leather while metal sliders allow you to adjust the fit. On the connectivity side, the Studio Pro use Class 1 Bluetooth for a stable, long-range wireless connection. There is also a 3.5mm input if you want to plug in directly, including use with in-flight entertainment systems. Controls are located on the headphones and include a "b" button for music and call control, a volume rocker, and a multifunction button used for switching listening modes, EQ settings, power, and pairing. In addition, the headphones offer integration with both Apple and Android devices. On Apple devices, they support one-touch pairing with iCloud-linked devices, hands-free Siri access, Find My tracking based on last connected location, and automatic software updates. On Android devices, they support Google Fast Pair, Audio Switch between compatible devices, and Google Find My Device tracking, with additional features available through the Beats app. When it comes to the battery performance, it is rated at up to 40 hours of listening time with ANC turned off, and up to 24 hours with ANC or Transparency mode enabled. A 10-minute Fast Fuel charge should provide up to 4 hours of playback. Finally, the headphones use a rechargeable lithium-ion battery and charge via USB-C. Beats Studio Pro Wireless Over-Ear ANC Headphones: $149.95 (Amazon US) Good to know This Amazon deal is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases.
    • "lets you pause updates by choosing an end date, for up to 35 days" Wasn't it "indefinitely"?
    • Those extra reboots are related to the UEFI Secure Boot certificate update thing.
    • Hands on with the ProtoArc EM25: Affordable ergonomic mouse that focuses on the right things by Taras Buria ProtoArc is known for making all sorts of office products with a big focus on ergonomics and comfort. Its latest product, the EM25, promises a comfortable-to-use, affordable, and customizable mouse. We took one for a spin; here are our impressions. The ProtoArc EM25 is a $49.99 mouse, but right now, during Prime Day 2026, you can get it for just $37.99. Right off the bat, you can see that the EM25 is inspired by Logitech's MX Master lineup and the legendary MX Master 3/3S. Its shape and proportions are very similar, so for a person with large hands (right-handed person, mind you), the EM25 is very comfortable to use. The mouse fills the palm, and the thumb rests on a small extension, giving your wrist a small tilt to reduce strain. The mouse is made of black plastic without any coating, eliminating long-term wear concerns. However, I can see the main buttons and other areas you touch the most getting polished over time. Despite its size and bulk, the mouse is not too heavy. It weighs about 100 grams, which is significantly less than the MX Master 3S and its successor. It is no lightweight gaming mouse by any means, but it is not excessively heavy like the MX Master 4. The EM25 has a built-in storage for its USB dongle. It is a cleverly made magnetic flap that you open by simply pressing on it. Next to the flap, you will find the on/off switch, the 1,000 Hz sensor, and a DPI button (up to 8,000 DPI). I find the DPI button location a bit odd, and I would prefer it somewhere below the main scroll wheel. Still, given that I never change DPI on my mice, I will let it pass. What is more important is that, unlike MX Master 3/3S/4, the device switch button is located below the left-click button, which allows you to switch devices without lifting and flipping the mouse. For a multi-device setup, this is a perfect solution: the button does not require too much effort to use, it does not get in your way, but it is also easily reachable with your thumb. The main scroll wheel has two modes: ratcheted and free-flow. You can only change between them with a bright orange button (I like this little touch of color), which is sprung and requires some effort to press. The wheel is dead-silent in free-flow mode, but ratched is quite loud and stiff, perhaps even too much to my liking. I can hardly call it deal-breaking, but it will certainly take some time to get used to. The side scroll wheel, it is notched, silent, and pleasant to use. Next to it, you can find a piece of glossed plastic with connection indicators: Dongle, Bluetooth 1, Bluetooth 2, and the low battery indicator. By the way, the built-in battery is rechargeable via a USB Type-C cable, which is included. It is sleeved and has an orange velcro strap to keep it tidy. After using the EM25 for a few weeks, I can say that its main buttons are my absolute favorite. They have very pronounced clicks, which feel great with just the right amount of force required to register a press. I would say they feel like something in between regular mouse clicks and silent ones. You can hear and feel the springy switch, but it is not sharp or loud to the point of annoying you. As for back/forward and device switch buttons, they are very clicky and quite noisy. Unfortunately, there are no extra buttons that you can map to specific things like in the MX Master lineup. Besides great primary clicks, another thing I like about the EM25 is its 1,000 Hz sensor. In the world, where Logitech still uses 125 Hz sensors in $100+ mice, seeing a much faster sensor in a mouse that costs three times less is very refreshing. Also, all the settings and customization you make are stored on-device, and you do not need to install any software. Just open the web-based app and change all that you need. Speaking of customization, you can remap what buttons do, adjust the DPI, and the sensor speed. Sadly, gestures are not supported, but you can still map pretty much anything to each button, including shortcuts, media buttons, and more. I also recommend using software like XMouseControl, as it will let you remap the side scroll wheel. At the end of the day, the ProtoArc EM25 is a great mouse. Clearly inspired by the MX Master lineup, it takes the best of it and complements it with a much more wallet-friendly price tag, significantly better sensor, on-device memory, a built-in storage for the dongle, and more (it fixes everything that I complained about the MX Master 4 recently). And for only $37.99 during Prime Day, the EM25 is an easy recommendation. Buy ProtoArc EM25 mouse - $37.99 | 24% off with Prime As an Amazon Associate, we earn from qualifying purchases.
  • Recent Achievements

    • Rookie
      DaviKar went up a rank
      Rookie
    • Dedicated
      HidekoYamamoto94 earned a badge
      Dedicated
    • One Month Later
      timbobit earned a badge
      One Month Later
    • One Month Later
      nates earned a badge
      One Month Later
    • Week One Done
      Almohandis earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      460
    2. 2
      +Edouard
      161
    3. 3
      PsYcHoKiLLa
      110
    4. 4
      Michael Scrip
      81
    5. 5
      Steven P.
      69
  • Tell a friend