Recommended Posts

Antares return to flight likely to slip to August

 

Quote

LANCASTER, Calif. — The first launch of an Orbital ATK Antares rocket with a new first stage engine will likely be delayed from July to August, the company said June 16.

 

In a statement to SpaceNews, Orbital ATK spokeswoman Sean Wilson said that the launch of the Antares carrying a Cygnus cargo spacecraft to the International Space Station will likely take place “in the August timeframe.” That launch was previously scheduled for no earlier than early July.

 

“Our Antares team recently completed a successful stage test and is wrapping up the test data analysis,” Wilson said, referring to a May 31 static fire test of the Antares first stage on the pad at the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia. “Final trajectory shaping work is also currently underway, which is likely to result in an updated launch schedule in the August timeframe.”

 

She declined to say if the delay was primarily caused by ISS schedule conflicts with other visiting vehicles or issues with the first stage after that static fire test. NASASpaceFlight.com, which first reported the potential delay June 15, cited vibrations during the static fire test that required updates to the vehicle’s avionics.

 

The ISS has a busy schedule of other vehicles visiting the station. A Soyuz spacecraft carrying three new station crewmembers is scheduled for launch July 7, after being delayed from June 24 because of issues with the Soyuz’s software. A Progress cargo mission was also delayed to July 17.

 

A SpaceX Falcon 9 is scheduled to launch a Dragon cargo spacecraft to the station early July 16. That launch appears to remain on schedule despite its proximity to the Progress mission, with NASA recently promoting social media events associated with the launch.

 

The Antares launch of a Cygnus, on a mission designated OA-5, will be the first for the Antares with new RD-181 first stage engines. Orbital ATK replaced the AJ26 engines, provided by Aerojet Rocketdyne, after they were implicated the failure of the previous Antares launch in October 2014. The RD-181 engines, manufactured by Russian company NPO Energomash, also increase the payload capacity of the Antares.

 

Wilson said that an updated launch date for the OA-5 mission, “which takes into account the space station traffic schedule and cargo requirements, will be made in conjunction with NASA in the next several weeks.”

http://spacenews.com/antares-return-to-flight-likely-to-slip-to-august/

 

// I "bolded" the vibration portion.

 

  • 2 months later...

Antares return to flight now planned for early October

 

antares-hotfire-879x485.jpg

An Orbital ATK Antares first stage fires its RD-181 main engines during a static fire test May 31 at Wallops Island, Virginia. Credit: NASA 

 

Quote

LONG BEACH, Calif. — The first launch of an Orbital ATK Antares rocket with a new first stage engine is now planned for early October, a company official said Sept. 13.

 

Speaking on a launch systems panel during the AIAA Space 2016 conference here, John Steinmeyer, director of business development at Orbital ATK’s Launch Vehicle Division, said the company was working with NASA to finalize a date for the launch, which will carry a Cygnus cargo spacecraft to the International Space Station.

 

“We’re targeting an initial launch capability in early October. We’re working with NASA to select an optimal launch date,” he said. “We’re very diligent in our preparations for that launch, and making sure we completely validate the system and the RD-181 engines.”

 

The launch will be the first of a new variant of the Antares, known as the Antares 230. That vehicle replaces the AJ26 engines supplied by Aerojet Rocketdyne, used in the initial Antares missions and implicated in an October 2014 launch failure, with new RD-181 engines from Russian manufacturer NPO Energomash.

 

An Antares first stage with the RD-181 engines successfully completed a static fire test on the pad at the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia, in late May. NASA and Orbital ATK were planning an Aug. 22 launch of the Antares, but postponed the launch Aug. 10. At the time, the company cited both the schedule of activities on the ISS as well as “continuing processing, inspection and testing” of the Antares for the delay, saying the launch would be rescheduled for the second half of September.

 

While NASA’s web site still cites a September launch date for the mission, agency spokesman Dan Huot said Sept. 13 that the launch is now planned in three or four weeks.

 

Steinmeyer, in an interview after the conference session, didn’t go into specifics about any technical issues encountered with the Antares during the static-fire test that may have contributed to the delay, but indicated any problems have been resolved. “We learned things. That’s why we did the test,” he said. “We’ve worked through all that.”

 

A return to flight for Antares next month, sending a Cygnus spacecraft to the space station, would come as two other ISS cargo vehicles are facing delays. The Japanese space agency JAXA announced Aug. 10 that the launch of an H-2 Transfer Vehicle cargo spacecraft, originally scheduled for Oct. 1, would be delayed because of an air leak in the spacecraft. JAXA has not announced a new launch date for the mission.

 

SpaceX was scheduled to launch a Dragon cargo spacecraft to the ISS in November, a mission likely to be delayed because of the Sept. 1 pad accident that destroyed a Falcon 9 and its commercial satellite payload. SpaceX executives now say the Falcon 9 could resume launches as soon as November, but have not announced what mission would go on a return-to-flight mission.

http://spacenews.com/antares-return-to-flight-now-planned-for-early-october/

  • Like 2
  • 1 month later...
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • I agree, especially if it is cloud sourced, like this one is.. but I wouldn't say no to a local AI assistant similar to the Zettlab one which would be really helpful with my large Photos library, but also to perform tasks like installing Docker apps rather than me having to do it via Docker Compose, but I don't think we're quite there yet. Synology Photos is somewhat AI, you can ask it to search for certain people (if you have tagged them and it will attempt to match similar photos to the person) and if you put a search term in for "cars" for example, it will show you all photos with a car.
    • I doubt that Google will keep the same price... it may go up from that list published.
    • Sennheiser's audiophile grade HD 600 hits lowest ever price on Amazon Prime Day 2026 by Sayan Sen If you are in the market for high-quality audiophile-grade over-ear headphones then Sennheiser's HD 600 are a great choice for sure, especially today on Prime Day 2026 as the product has hit its lowest ever price (purchase link under the specs table down below). The Sennheiser HD 600 has long been regarded as a reference headphone for listeners seeking a detailed and natural listening experience. It is an open-back design that is built around the idea of acoustic transparency which is essentially said to allow sound waves to move freely for a more spacious and accurate presentation by reducing turbulence and the type of distortion that can result from it. At the heart of the product is Sennheiser’s proprietary driver system featuring a 42 mm driver paired with a lightweight diaphragm and aluminum voice coils. The company says this design helps deliver fast response times and better articulate sound across the audible frequency range. Comfort and durability are also key aspects of the HD 600 as the headphones feature soft velour ear pads designed for extended listening sessions. The HD 600 comes with a detachable 3-meter cable, a 6.3 mm stereo connector, and a 3.5 mm adapter for compatibility with a wide range of audio equipment. The technical specs of the Sennheiser HD 600 are given in the table below: Specification Value Transducer Principle Dynamic, Open-Back Ear Coupling Circumaural (Over-Ear) Frequency Response 12 Hz – 40,500 Hz Sound Pressure Level (SPL) 97 dB (1 V) Impedance 300 Ω Total Harmonic Distortion (THD) < 0.1% (1 kHz, 1 V) Cable Length 3 m (9.8 ft) Connector 3.5 mm Stereo Jack Plug Included Adapter 6.3 mm (1/4") Stereo Jack Adapter Weight 260 g Magnetic Field Strength 1.8 mT Driver Size 42 mm Dynamic Driver Diaphragm Size 38 mm Get it at the link below: Sennheiser HD 600: $237.00 (Sold by Electronics Expo, Shipped by Amazon US) (Was: $449.95) Good to know This Amazon deal is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases
    • So the card is targeted at headphone users - so the review should be from someone that uses this - maybe I can review a card next time.
  • Recent Achievements

    • One Month Later
      timbobit earned a badge
      One Month Later
    • One Month Later
      nates earned a badge
      One Month Later
    • Week One Done
      Almohandis earned a badge
      Week One Done
    • Rookie
      dorf went up a rank
      Rookie
    • First Post
      mike_rumble earned a badge
      First Post
  • Popular Contributors

    1. 1
      +primortal
      476
    2. 2
      +Edouard
      170
    3. 3
      PsYcHoKiLLa
      104
    4. 4
      Michael Scrip
      88
    5. 5
      Steven P.
      70
  • Tell a friend

    Love Neowin? Tell a friend!