@jeff_foust from AIAA 2016

 

CST-100

 

Chris Ferguson, Boeing: plan to start CST-100 parachute tests, dropping test article from balloon at 40,000 ft, in about week. #AIAASpace

 

Ferguson: five landing sites for CST-100: Dugway Proving Ground in Utah, 2 at White Sands, 1 in Ariz., and Edwards AFB in Calif. #AIAASpace

 

Ferguson: pad abort test a big deal; fingers and toes crossed for it. Planned for end of next year. #AIAASpace

 

Ferguson says that under current schedule, CST-100 will be ready for commercial services for NASA in mid-2018. #AIAASpace

 

Ferguson: our schedule is “very aggressive” but we’ll fly when we’re ready and when vehicle is safe. #AIAASpace

 

Ferguson: we determined other testing was sufficient for in-flight aborts, so don’t need to do actual in-flight abort test. #AIAASpace

  • Like 1
4 hours ago, DocM said:

@jeff_foust from AIAA 2016

 

CST-100

 

Ferguson: we determined other testing was sufficient for in-flight aborts, so don’t need to do actual in-flight abort test. #AIAASpace

I call B.S. .... new human-rated gear, it needs the full-monty testing like Dragon 2. Fair is fair. No shortcuts, no cheating. And with all the problems during development, I want this thing to be put through it's paces. Properly. 

 

Otherwise, it's Challenger waiting to happen ... again. 

  • Like 3

^ This was funny....I thought the same thing....but told myself to bite my tongue.

 

With NASA's purported emphasis on safety, this can not be allowed to happen without someone questioning this approach.

 

Sounds like Boeing cost cutting and not wanting to do a test that may have issues and cause further development costs and delays. 

 

:s

  • Like 1
4 minutes ago, Draggendrop said:

^ This was funny....I thought the same thing....but told myself to bite my tongue.

 

With NASA's purported emphasis on safety, this can not be allowed to happen without someone questioning this approach.

 

Sounds like Boeing cost cutting and not wanting to do a test that may have issues and cause further development costs and delays. 

 

:s

Yep... and whoever it was at NASA and LH/M that thought it was a good idea needs to have the surviving parts from Challenger and Columbia dropped on their heads as a reminder of what "shortcuts" will get them. To my way of thinking, it's completely unacceptable that anyone would possibly entertain the idea after what happened with those two Shuttles ... 

 

"Oh yeah, it'll be fine. Run it without testing. Suuuuure, no problem, fellas ...."

 

Ugh. The ego .... as if. :angry:

  • Like 1

And you know what's worse?There are Astronauts who'll actually fly in that bloody thing. WILLINGLY. 

 

I sure as [expletive noun] wouldn't. Not in a million years. Not as it sits currently. Certainly not unless that [expletive descriptive] is properly tested like Dragon 2. I'd ride in Dragon 1 first. We know that one is safe for Humans. Bolt in Dragon 2's seats, mod the reentry software to account for people being on-board (if it isn't there already), and I'd ride that one without worry. But not CST. Nope ....

 

That's how little I trust LH/M's "shortcuts".

  • Like 1
3 minutes ago, Unobscured Vision said:

And you know what's worse?There are Astronauts who'll actually fly in that bloody thing. WILLINGLY. 

 

I sure as [expletive noun] wouldn't. Not in a million years. Not as it sits currently. Certainly not unless that [expletive descriptive] is properly tested like Dragon 2. I'd ride in Dragon 1 first. We know that one is safe for Humans. Bolt in Dragon 2's seats, mod the reentry software to account for people being on-board (if it isn't there already), and I'd ride that one without worry. But not CST. Nope ....

 

That's how little I trust LH/M's "shortcuts".

I would bet that if one were to put on an EMU, cargo strap yourself to the cargo in Dragon 1, you would make it back with a few hours of air extra.

 

After SpaceX does the inflight abort...we can check the astronaut queue and see who has a happy face on.

  • Like 1
  • 4 weeks later...

Boeing Delays CST-100, Still Targets 2018 ISS Mission

 

Quote

Following supplier holdups, a key production problem on the second CST-100 spacecraft and other issues, Boeing has opted to slide its entire NASA commercial crew test and development program six months. Despite the setback, which includes an added month of additional margin, the company still hopes to fly the first NASA astronauts to the International Space Station (ISS) in December 2018. News of the delay confirms the prognosis of a Sept. 1 report by NASA’s Office of Inspector ...

http://aviationweek.com/new-space/boeing-delays-cst-100-still-targets-2018-iss-mission

 

site is a paywall, will have to find out more at other sources....

So, another 6 month slip for Starliiner. Not unexpected given the weight, LAS, aero-loads, the need for more wind tunnel work and other issues. I'd say them making Dec. 2018 is a big stretch. Maybe mid-2019 if everything else goes well - and that includes Russia not pulling RD-180 in a snit over whatever and Vulcan staying on schedule.

  • Like 2

http://www.parabolicarc.com/2016/10/11/boeing-delays-cst100-starliner-operational-flight-december-2018/

 

John Mulholland, Boeing’s vice president and program manager for commercial programs in space explorations, told Aviation Week the delays have resulted from multiple challenges.



Three main causes have been identified by Boeing for the slide, all of which the company says are now either resolved, understood or in the process of being corrected. These include development production delays from the supply chain “which are mostly over and stabilizing now, as we get into qualification testing of the first uncrewed flight test,” says Mulholland.

A second, more recent issue that occurred in September, was a production flaw that forced the scrapping of the lower dome—one of two main structural elements along with the upper dome—of the crew module pressure shell for Spacecraft 2, the vehicle to be used in the first crewed flight test.

“It was overmachined due to an issue with the hold-down tooling. Each is cut out from one piece of aluminum that we form into shape and mill out pockets. But the hold-down fixture was not rigid enough and they got some movement, which was not detected and milled through.

“Luckily we formed a spare dome, but this only happened 2.5 weeks ago, and we realized there was an error in it when cooling flow in the pockets drained through,” he adds. The domes are manufactured using a weldless spin forming process, but then machined elsewhere into a honeycomb-shape for reduced weight and increased strength.

An additional part of the holdup has been prompted by issues with qualification tests of minor components. “There are lots of composite parts—some with high complexity—and a design which caused difficulty in manufacturing,” says Mulholland. “We worked our way through these issues but it took a couple more months than anticipated.”

  • Like 1

This is real comical.

 

They had their simulators out for NASA in no time, for an item they keep botching up. Sounds like the simulators were nothing more than an arcade game.

 

There is no way these guys are going to launch before SpaceX, and worse, NASA may purchase more seats for 2019 because of this, and it had nothing to do with SpaceX.

 

:(

This is what happens when you let a contractor do virtually all their first 4+ years milestones on paper with nothing but notional pressure hull and most flight hardware. Didn't cut metal until they got an award, so now they have to rush.

 

SpaceX has been flying theirs to ISS for almost 6 years.

  • Like 1

Soooo ... they decided, in their infinite wisdom, to fabricate a shell (the PRESSURE HULL?!) using the most expensive, time-consuming, difficult and downright dumb method possible and they botched it. Not only the upper half but the bottom half too?!

 

Oh man. They couldn't just simulate first ... wow. They had to do it the Mil/Gov way ....

 

CST is never gonna get off the ground at this rate. Maybe that's the whole idea -- after all, Orion needs missions. Maybe CST was just a "honeytrap".

  • Like 1

Sounds like it, eh? $2+ billion more for CST-100 and this is what NASA gets. 

 

BTW: SpaceX cuts and rolls panels for Dragon pressure hulls, then friction-stir welds them into one thick, solid piece. They built their own FSW gear for the purpose. Next is an outer standoff layer.

 

F9 weldups are also FSW.

 

20101001_vessel.jpg

Edited by DocM

Man, I clicked that link before I realized it was Parabolic Arc... I see he still hasn't removed those super stupid invasive adds from his website, back to the blacklist it is.

 

Anyway, way to go Boeing! Which company was going to put the first man on Mars again did you say? Ow wait, lets get that Starliner operational first shall we?

  • Like 3
10 hours ago, DocM said:

Sounds like it, eh? $2+ billion more for CST-100 and this is what NASA gets. 

 

BTW: SpaceX cuts and rolls panels for Dragon pressure hulls, then friction-stir welds them into one thick, solid piece. They built their own FSW gear for the purpose. Next is an outer standoff layer.

 

F9 weldups are also FSW.

 

20101001_vessel.jpg

Oh. Excuse me. I thought they were using a Small Panel + Interweave design, then doing a Hard-Load Welding technique to get each Panel locked down. Looking at it, yeah, it's all one solid cast on the top then in the middle section.

As if the weight problem on Starliner itself wasn't enough... a specially designed, jettisonable, aft skirt has to be attached to CST-100, extending the trunk in order to deal with the "unique challenges with aerodynamic stability and loads."

 

/fail

 

 

  • Like 2
  • 2 weeks later...

Just now getting their propulsion units...

 

Quote

 

Starliner Propulsion Hardware Arrives, Testing Begins
October 18, 2016 - Stephanie Martin

Boeing and Aerojet Rocketdyne have begun a series of developmental hot-fires tests with two launch abort engines similar to the ones that will be part of Boeing’s Starliner service module. The engines, designed to maximize thrust build-up, while minimizing overshoot during start up, will be fired between half a second and 3 seconds each during the test campaign. If the Starliner’s four launch abort engines were used during an abort scenario, they would fire between 3 and 5.5 seconds, with enough thrust to get the spacecraft and its crew away from the rocket, before splashing down in the ocean under parachutes.

Recently, Aerojet Rocketdyne also completed delivery of the first set of hardware for Starliner’s service module propulsion system.

The Starliner is under development in collaboration with NASA’s Commercial Crew Program for crew missions to the International Space Station.

https://blogs.nasa.gov/commercialcrew/2016/10/18/starliner-propulsion-hardware-arrives-testing-begins/

 


 

hr-LAE_Test_01_10_10_16.jpg

Just posted today, gives a better view of construction...

 

CST-100 Starliner Manufacturing

 

ksc-20160502-ph_boe0001_0003.jpg?itok=xX

Photo Credit: Boeing

 

Quote

An engineer guides the upper dome of a Boeing CST-100 Starliner as it is connected to the lower dome to complete the first hull of the Starliner's Structural Test Article, a prototype spacecraft that is identical to the operational versions but not meant to fly in space.

 

The work was performed inside the Commercial Crew and Cargo Processing Facility at NASA's Kennedy Space Center in Florida. The STA is built to endure harsh tests mimicking conditions of spaceflight to prove the design and its manufacturing techniques will work for space-bound Starliners.

 

The Starliner is one of two spacecraft in development in partnership with NASA's Commercial Crew Program that will enable astronauts to fly to the International Space Station on a new generation of spacecraft made in America and launching from Florida's Space Coast.

 

Photo Credit: Boeing

Last Updated: Oct. 24, 2016

http://www.nasa.gov/image-feature/cst-100-starliner-manufacturing

 

:)

Okay, analysis of their structural shell ...

 

a) Pro: Doing it in halves like that will make it much easier to work on. 

    Con: Hope they plan to secure & enviro-seal those halves together in such a way so that they are failure-guarded. There's a risk of a leak and/or failure under load at that seam, and I personally wouldn't do it this way simply because of the added weight involved in mitigating it alone -- then we've added that small "lip" around each edge? That's gotta be 2~400 lbs of material total that could have been eliminated from the design straightaway versus single-shell. It adds up, and that impacts performance margins.

 

b) Pro: Doing it in halves will make it faster to complete.

    Con: At this point it doesn't matter. The project is already waaaaay behind, and waaaaaaay over-budget. Why bother? ULA are already milking Bessie.

 

c) Pro: It looks like it's made of plastic! It's the current state of Metals Fab, and it's awesome! :rofl:

    Con: It looks like it's made of plastic ... is this really the current state of Metals Fab at ULA? :huh:

 

So ... yeah. A little lacking in the "wow" for me.

  • Like 1

The yellowish cast is a chromate conversion coating, which is used to passivate steel, aluminum etc. The structure is made of Al-Li alloy.

 

The 2 halves remain separate. Skyliner uses a clamshell design to ease getting to cargo and doing refurb after its return. The downside is you end up with a perimeter seal  about 14 meters long. Yeah, I know.

  • Like 1

And thanks for cluing me in about the chromate coating. I was looking at things from a mechanical perspective too, but that funky coating was (I assumed) some sort of necessary treatment to the metal. I knew it wasn't anodizing or powder coating.

  • 4 weeks later...

http://www.ocregister.com/articles/beach-735508-jobs-company.html

 


Boeing will shift nearly 2,500 jobs out of its Huntington Beach facility by 2020, the company announced Tuesday, carving in half the number of employees at the aerospace campus.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Exactly. They won't go 100 because current gen consoles are simply too old for any groundbreaking graphics or gaming experience otherwise. They will go with standard (console) price 70 or go with 80 if they really want to go premium. Of course they will have more expensive options too with some useless cosmetics as always.
    • Doesn’t surprise me at all. God is light & He gave us life so it sounds almost logical that we would therefore emit a certain amount of light.
    • This is what I want. Hey Gemini, how do I remove you from all my google products permanently?
    • I would never install install this build before rtm process. only 3 months to go. never install on your daily devices. just wait 3 months.
    • Motrix Next 3.9.6 by Razvan Serea Motrix Next is a modern, open-source cross-platform download manager built as the official next-generation successor to the original Motrix project. It has been completely rewritten using Tauri 2, Vue 3, TypeScript, and Rust, while still relying on the powerful Aria2 download engine for high-speed multi-protocol transfers. The app supports HTTP, HTTPS, FTP, BitTorrent, ED2K and magnet links, offering advanced features like multi-connection acceleration, task scheduling, bandwidth control, and batch download management. With a significantly reduced install size (around 20MB), it focuses on being lightweight, fast, and resource-efficient compared to traditional Electron-based download tools. Designed for Windows, macOS, and Linux, Motrix Next delivers a clean, modern UI inspired by Material Design 3 principles, with smooth animations and a minimal workflow. It improves usability through better download organization, system tray integration, and enhanced torrent handling including selective file downloads and tracker management. Motrix Next features: Multi-protocol downloads — HTTP, FTP, BitTorrent, Magnet, .torrent, ED2K, and Metalink tasks BitTorrent — Selective file download, DHT, peer exchange, encryption controls, metadata caching, GeoIP peer flags, and tracker probing Browser extension integration — Embedded Extension API with independent authentication, download confirmation, smart auto-submit, filename hints, referer/cookie forwarding, and real-time controls (Chrome Web Store · Edge Add-ons) Safe filename handling — Content-Disposition, RFC 2047, non-UTF-8, percent-encoded, and extensionless URL resolution with path traversal sanitization Download organization — Favorite and recent folders, optional file-type categorization, stale-record cleanup, and completed history backed by SQLite Concurrent downloads — Independent controls for active tasks, HTTP connections per server, segments per file, and BT peer limits Speed control — Global and per-task upload/download limits with day-of-week and time-of-day scheduling System integration — Tray operation, optional tray speed display, macOS Dock badge/progress, protocol handlers for magnet://, thunder://, and motrixnext:// Lightweight mode — Destroys the WebView on minimize-to-tray while Rust keeps the engine, task monitor, notifications, history, and extension routing alive Notifications and power options — Native task start/complete/failure notifications, keep-awake during downloads, and optional shutdown after completion Network controls — Scoped proxy support for downloads, app updates, and tracker updates, plus system proxy detection Auto-update channels — Stable, Beta, and Latest Across Channels policies with separate download and install phases Diagnostics — Structured logs, exportable diagnostic ZIPs, database integrity checks, automatic DB rebuild, and Linux GPU rendering fallback Personalization — Light/dark/system theme, 10 color schemes, 26 languages, and first-launch system language detection Motrix Next 3.9.6 changelog: New Features Clipboard management — App-owned copy actions no longer trigger the Add Task auto-detect popup. aria2 input compatibility — Multi-line aria2-style task input is supported for URLs with per-task options such as out=. BitTorrent IPv6 DHT — Added IPv6 DHT support and related configuration. File category URL patterns — File category rules can match URL patterns with validation and localized hints. Task status tags — Added clearer waiting and sharing states for task cards. Download event bridge — Added an aria2 WebSocket event bridge for faster download notifications. Improvements Improved task list transitions and preserved task state during tab switches. Kept RPC origin access enabled for local integrations. Restored AppImage stripping in release builds after beta validation. Added localized preference guidance across supported languages. Download: Motrix Next 64-bit | ARM64 | macOS ~20.0 MB (Open Source) Links: Website | macOS / Linux | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • Conversation Starter
      sumytbe earned a badge
      Conversation Starter
    • One Year In
      B4dM1k3 earned a badge
      One Year In
    • One Year In
      DarkWun earned a badge
      One Year In
    • Dedicated
      Almohandis earned a badge
      Dedicated
    • Dedicated
      JuvenileDelinquent earned a badge
      Dedicated
  • Popular Contributors

    1. 1
      +primortal
      508
    2. 2
      +Edouard
      181
    3. 3
      PsYcHoKiLLa
      86
    4. 4
      Michael Scrip
      78
    5. 5
      Steven P.
      75
  • Tell a friend

    Love Neowin? Tell a friend!