TOKYO (Reuters) - As much as 120 tons of radioactive water may have leaked from a storage tank at Japan's crippled Fukushima nuclear plant, contaminating the surrounding ground, Tokyo Electric Power Company said on Saturday.

The power company has yet to discover the cause of the leak, detected on one of seven tanks that store water used to cool the plants reactors, a spokesman for the company, Masayuki Ono, said at a press briefing.

The company plans to pump 13,000 cubic meters of water remaining in the tank to other vessels over the next two weeks.

Water from the leaking tank, which located 800 meters from the coast, is not expected to reach the sea, Kyodo news wire reported, earlier, citing unidentified officials from the utility.

The company did not say how long the tank had been leaking.

The operator of the Fukushima Daiichi plant has faced a range of problems with controlling ground water and maintaining the massive cooling system built to keep the reactors stable.

The power company said on Friday said it lost the ability to cool radioactive fuel rods in one of the plant's reactors for about three hours.

more

Oh, that's not good at all. As many problems as they are having there it might be a good idea just to shut that planet down.

I don't believe they are using it for power production as all the reactors are damaged. You can't simply flick a switch, they need to keep control of the cooling and rods unfortunately.

Last I remember hearing it was being shut down, but as said, you can't just 'stop' a started nuclear reaction, you need to expend all the fuel at a slow safe rate before you can then remove it from the reactor and dispose of it.

The more I hear about this nuclear plant, the more of a cowboy job it sounds.

The more I hear about this nuclear plant, the more of a cowboy job it sounds.

It was a cowboy job. Tepco cut lots of corners, even in the type of reactor design, in order to save money.

Sadly thanks to them most people are now terrified of nuclear power. Though the major news networks have quite a big part to play in that too since they made it seem like the end of the world would happen.

This topic is now closed to further replies.
  • Posts

    • Microsoft's fast coding model MAI-Code-1-Flash comes to Copilot Business and Enterprise by Karthik Mudaliar Microsoft’s recently announced MAI-Code-1-Flash model is now generally available to GitHub Copilot Business and Copilot Enterprise customers. With this support, organizations can have more centralized policy controls and billing while finally being able to use Microsoft’s lightweight, first-party coding model. According to GitHub’s announcement, Business and Enterprise plan administrators must enable the MAI-Code-1-Flash policy in Copilot settings before developers can access the model. Microsoft says that MAI-Code-1-Flash is for fast, iterative coding work rather than the most demanding architectural or debugging tasks. GitHub’s official model comparison page says that the model is great for "general-purpose coding and writing," while it excels at fast, accurate code completions and explanations Microsoft introduced MAI-Code-1-Flash on June 2 as part of a broader collection of internally developed MAI models. GitHub subsequently expanded support to Copilot CLI, the Copilot cloud agent, GitHub.com chat, GitHub Mobile, Visual Studio, JetBrains IDEs, Eclipse, and Xcode, but said support for managed Business and Enterprise customers was still on the way. In Microsoft’s own benchmark testing, MAI-Code-1-Flash scored 51.2% on SWE-Bench Pro, compared with 35.2% for Anthropic’s Claude Haiku 4.5. Microsoft also claimed that the model used up to 60% fewer tokens on SWE-Bench Verified. Do note that these are vendor-run results rather than independent measurements. The model is billed at provider list pricing under GitHub’s usage-based system. GitHub currently lists MAI-Code-1-Flash at $0.75 per million input tokens, $0.075 per million cached input tokens, and $4.50 per million output tokens. For organizations, the main incentive to use MAI-Code-1-Flash is likely to be efficiency rather than maximum capability. A smaller model that responds quickly and limits unnecessary output is quite useful for repetitive agent tasks at scale, especially after GitHub Copilot’s move toward usage-based billing. The "Flash" model is recommended for fast work and not necessarily for huge repositories with loads of context. It's better if teams compare their output with other larger models, especially if they're working on security-sensitive changes and complex, multi-file work.
    • yes AND no the "original" or plain/normal Optiplex 7010 won't be getting any more new firmware updates BUT the Optiplex SFF/SFF Plus {small form factor}, Micro/Micro Plus & Tower/Tower Plus 7010 editions DO get new updates such as this new one   and here are similar guides from the Dell web site for Dell systems: https://www.dell.com/support/kbdoc/en-us/000390990/secure-boot-transition-faq https://www.dell.com/support/kbdoc/en-us/000347876/microsoft-2011-secure-boot-certificate-expiration
    • AT&T has been spying on US citizens with the NSA for decades.. they just know how to keep it more under wraps.. the evil level is still there.
  • Recent Achievements

    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
    • Week One Done
      tuben earned a badge
      Week One Done
    • First Post
      OffsetAbs earned a badge
      First Post
    • Reacting Well
      OffsetAbs earned a badge
      Reacting Well
  • Popular Contributors

    1. 1
      +primortal
      444
    2. 2
      +Edouard
      200
    3. 3
      PsYcHoKiLLa
      155
    4. 4
      FloatingFatMan
      71
    5. 5
      Steven P.
      66
  • Tell a friend

    Love Neowin? Tell a friend!