Recommended Posts

At this scale they're gonna have to go no oven for the underlay, and the overlay will have to be individual (smaller) panels that are form-fitted. This is totally uncharted territory; the largest things they've made with CCF have been those super-designer Yachts, and even those were only CCF panels, then a few layers overtop (then baked in sections) then an enamel gloss coat on top of that for additional stiffening much like schellacking.

 

I'm really interested to find out what they're doing, inside and out. I wanna know if they went with the super-dense CCF structural materials to save on the weight. Hell, the whole thing is interesting to me. :D 

Yup, this whole thing is an example of an Undiscovered Country, charting new territory as they go.  

 

Ascent Aerospace and SpaceX have a great licensing opportunity here as the processes developed could be very lucrative for both.

  • Like 1

Oh yeah. ALL of this is going to filter down into all aspects of Industry, Science, Construction ... the applications are quite literally unlimited.

 

Working on the ideas they figure out here they'll have the groundwork for the next great revolutions in Structural & Capitol Engineering, Architecture, you name it, that'll carry us through the next 50+ years.

 

This is where the "Industrial-Scale" CCF Applications begin to get sorted out. The one area the technologies haven't seen much growth because the Logistics haven't been worked out yet -- nobody has taken the plunge until now on this scale.

[EDIT] Good GRAVY, think of the patent returns on the IP ... residuals and licensing for YEARS. :yes: 

16 hours ago, DocM said:

SpaceX is recruiting "Naval Architects" to build "launch sites." 

 

Hmmmm....

 

spacex-bfr-earth-transport.thumb.jpg.0354652503af274e1746fbfdca985be2.jpg

The picture looks great, but there's no way they'd be allowed to launch so close to a city.  Ignoring the normal launch shockwave damage that would happen at that close proximity, imagine if there was an incident on the pad?  The damage that city would suffer would be unreal...

33 minutes ago, FloatingFatMan said:

The picture looks great, but there's no way they'd be allowed to launch so close to a city.  Ignoring the normal launch shockwave damage that would happen at that close proximity, imagine if there was an incident on the pad?  The damage that city would suffer would be unreal..

 

Not really. Explosive yeild and damage to a given location don't  scale linearly, so a rocket with 10x the propellants may only have a blast radius 2x as great. The vast majority of the energy would go up or in directions away from the city.

 

Also, the result is a conflagration; a fast burning fire and not a detonation. This means the impulse is spread over a longer time, greatly reducing the peak pressure wave and overpressure at a given distance.  

 

Example: a Falcon Heavy has about 3x the propellants of a Falcon 9, but its safety zones radius, established by the FAA, is only 50% larger.  Conflagration ≠ detonation.

 

BFR is about 3x the Falcon Heavy, so.....

 

Depiction aside - while a pad explosion on a platform 10+ miles offshore may put on a big show for the city folks there won't be a nuke  scale shockwave hitting them.

1 minute ago, DocM said:

Depiction aside - while a pad explosion on a platform 10+ miles offshore may put on a big show for the city folks there won't be a nuke  scale shockwave hitting them.

Sure, but that depiction isn't anywhere near 10 miles.  It's barely even 1! :p

 

SpaceX President and COO Gwynne Shotwell today at a conference, talking about Earth P2P happening within 10 years. The moderator was skeptical about it being 'Elon time.'

 

Shotwell: "That's my time, not Elon time."

 

Before SpaceX Shotwell worked for The Aerospace Corporation, which advises DoD and NASA.  Her focus; advanced thermal analysis for military projects, and she's been published many times. 

  • Like 1

Scooby_errp_.thumb.jpg.0ba9514d2645f9eda8a3b45d61ee9ee2.jpg

 

Ahh-rou?

(E2E = Earth to Earth, Point to Point etc.)

The TED video is unreleased, but a few people caught it on their cellphones and did comparisons.

Looks to be ≥400 feet.

 

 

Edited by DocM
  • Like 1

The specific information that we've garnered in Academia is embargoed right now. SpaceX will release it when they're ready. There have been some additional changes to BFR/BFS, but those changes add capability and redundancy in Earth SOI (including SSTO refinements for BFS previously thought unworkable).

 

Here's a teaser: BFS will be taking over ALL Falcon-9 and Falcon Heavy roles, except for Dragon & Dragon 2 OPS to the ISS because of NASA requirements. SOON. :yes:

 

Plenty more to come in short order. PLENTY.

  • Like 2
1 hour ago, Unobscured Vision said:

Bwahaha ... that image doesn't look real, does it. Like a model almost. Neat! :) 

It's called the tilt-shift effect, which makes a real world pic look like one taken of a model. It can be done either with a special lens or in editing software.

 

1266382800000_IMG_151263_0.jpg

Edited by DocM
  • Like 2
37 minutes ago, DocM said:

It's called the tilt-shift effect, which makes a real world pic look like one taken of a model. It can be done either with a special lens or in editing software.

So THAT'S how Gerry Anderson did Thunderbirds! I knew those models looked too good! It was all real!!! :p

 

  • Like 2

LA Times....

 


The initial 10-year lease, which has two options for 10-year extensions, has an initial annual rent of about $1.38 million with annual adjustments based on the Consumer Price Index. SpaceX can offset about $44.1 million of rent in exchange for improving the site in its first 20 years of tenancy.

  • Like 1
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Happens to the best of us, bro. 😛 
    • Thanks to some of the other recent Windows improvements, I'm optimistic about this one. My quick wishlist would be: perf like the older menu, merge both menus or at the very least, the older menu should be a flyout, not a simulated click to the old menu, and lastly, a customization window to let users move items from one menu to another, so I could bring Send To back to the main menu, and the OneDrive settings to the older.
    • This Gigabyte AMD RX 9070 XT is very good deal despite the launch of 9070 GRE by Sayan Sen Recently we reviewed AMD's latest 1440p gaming card, the Radeon RX 9070 GRE 12GB, for $549. The card is in stock too at that price, though if you want significantly better performance and don't mind spending a bit more, the Gigabyte Gaming model of RX 9070 XT is currently on sale for just $650 (purchase link under the specs table down below). The card employs Gigabyte's WINDFORCE cooling system which combines multiple design elements such as alternate-spinning Hawk fans, a vapor chamber, and composite heat pipes to manage heat dissipation. The Server-grade Thermal conductive gel further helps in this department. The inclusion of a semi-passive cooling mode allows the fans to remain inactive under low workloads, which allows for reduced noise operation during lighter usage. There is dual BIOS switch that allows toggling between performance and silent modes. The technical specifications of the Gigabyte Radeon RX 9070 XT GAMING OC 16G are given in the table below: Specification Value Core Clock Boost Clock: up to 3060 MHz Game Clock: up to 2520 MHz Stream Processors 4096 Memory Clock 20 Gbps Memory Size 16GB Memory Type GDDR6 Memory Bus 256-bit Card Bus Interface PCI Express 5.0 Maximum Resolution 7680 × 4320 Multi-View Support 4 displays Card Dimensions L=288 mm, W=132 mm, H=56 mm Recommended Power Supply 750W Power Connectors 3 × 8-pin Video Outputs 2 × DisplayPort 2.1a 2 × HDMI 2.1b Get it at the link below: GIGABYTE Radeon RX 9070 XT Gaming OC 16GB Graphics Card, GV-R9070XTGAMING OC: $649.99 (Sold and Shipped by Amazon US) (Was: $740) This Amazon deal is US-specific and not available in other regions unless specified. This is a first-party seller link (at the time of article publishing); ensure that you also purchase from a first-party seller link only. If you don't like it or want to look at more options, check out the previous deals that we have covered, OR you can also visit Amazon US deals page. Get Prime (SNAP), Prime Video, Audible Plus or Kindle / Music Unlimited. Free for 30 days. As an Amazon Associate, we earn from qualifying purchases.
    • Why does this kind of tactic not surprise me?
    • They used AI based TOOLS to convert the JavaScript engine (the main rendering engine is still C++) and it was not fully automated but was human reviewed. Other subsystems will be looked into to also be converted to Rust in the future. I have no problem with any of that.
  • Recent Achievements

    • One Year In
      CHUNWEI earned a badge
      One Year In
    • Conversation Starter
      FBSPL earned a badge
      Conversation Starter
    • Week One Done
      I2D earned a badge
      Week One Done
    • Week One Done
      Dr Jared Dental Studio earned a badge
      Week One Done
    • Week One Done
      RG INVESTMENT GROUP earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      460
    2. 2
      PsYcHoKiLLa
      253
    3. 3
      Skyfrog
      80
    4. 4
      FloatingFatMan
      63
    5. 5
      Michael Scrip
      62
  • Tell a friend

    Love Neowin? Tell a friend!