COTS for the Moon, it apprears the balloon has gone up.  Bridenstine didn't waste any time.

 

Contract value between $25.000 and $2.5 billion (!!)

 

There are several small lunar landers getting ready to fly, but Blue Origin's Blue Moon lander is said to be good for 4 metric tons of cargo and SpaceX's BFS spaceship will be a  monster.

 

Presolicitation,

https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=46b23a8f2c06da6ac08e1d1d2ae97d35&tab=documents&tabmode=list

 

Quote


Solicitation Number: 80HQTR18R0011R
Notice Type: Presolicitation
Synopsis:
Added: Apr 27, 2018 3:44 pm


The purpose of this requirement is to acquire end-to-end payload services between the Earth and lunar surface for NASA Headquarters' Science, Human Exploration and Operations and Science Technolgy Mission Directorates.  The contractors shall provide all activities necessary to safely intergrate, accomodate, transport, and operate NASA Payloads using contractor provide assets, including launch vehicles, lunar lander spacecraft, lunar surface systems, Earth re-entry vehicles and associated resources.

Please consult the list of document viewers if you cannot open a file.
>

Edited by DocM
  • Like 1

Commercial Lunar Payload Services (CLPS) Preproposal Conference/Industry Day

 

Quote

 

NASA Preproposal Conference for the Commercial Lunar Payload Services (CLPS) Acquisition

 

Date: Tuesday, May 8, 2018

Location: NASA Headquarters, 300 E. Street SW, Washington, DC, US, 20546

 

Please be informed that it is anticipated the Draft Request for Proposal (DRFP) for CLPS will be posted in late April and available for comment for 30 days.
  
In addition to the DRFP posting, there will be an Industry Day held at NASA Headquarters, 300 E. Street, Washington, DC 20546 in the Auditorium on May 8, 2018.  The event will be held from 8:30 am to 4:00 pm and access to the auditorium will be available beginning at 8:00 am.  One on one meetings for 15-minute time slots are available for potential offerors to meet the Contracting Officer and technical team.  If your company is interested in participating in the one on one meetings, you can notify Theresa A. Stevens, Contracting Officer at [email protected] to schedule an appointment time.

CLPS Industry Day Forum

8:30 am - Welcome 
8:45 am - Lunar Payload Services Concept 
9:15 am - Lunar Payload Development 
9:45 am - Lunar Lander Development 
10:15 am - Lunar Strategy wrap up
10:30 am - CLPS DRFP Overview
11:15 am - CLPS Open Q&A 
12:00 pm - Lunch Break
1:00 – 4:00 pm - CLPS one-on-one meetings with industry
                      
All question and answers presented at Industry Day will be posted out on the CLPS E-library.


 

 

  • 3 months later...

RFP date: August 28
Proposals due: September 28
Awards: December 31

 

NASA wants US providers,

 

https://www.fbo.gov/index?s=opportunity&mode=form&id=b6a30891a122dcb5db6a1d85d2909caf&tab=core&_cview=0

 

Quote

Synopsis:

Added: Aug 03, 2018 9:38 am

This Special Notice Synopsis for Commercial Lunar Payload Services (CLPS) procurement is to publicize less than full and open competition; and that NASA will be limiting sources pursuant to 10 U.S.C. 2304(c)(3), as implemented by Federal Acquisition Regulation (FAR) 6.302-3(b)(1)(v). NASA has determined that creating or maintaining required domestic capabilities for production of critical space transportation services and vehicles to perform those services by limiting competition to capabilities manufactured in the United States or its outlying areas by domestically-owned and controlled entities is consistent with and necessary to implement United States space policy.

Space policy mandates, when read in concert, require NASA to promote, support, and maintain a domestic industrial base of space transportation capabilities to the lunar surface. In order to fulfill these mandates, CLPS space transportation service provider prime contractors, as well as all firms that construct, produce, manufacture or otherwise provide space transportation vehicles for the purpose of the prime contractor's performance of CLPS must qualify as domestically owned and controlled as defined by the CLPS solicitation. Additionally, all CLPS space transportation service provider prime contractors shall provide a CLPS that utilizes domestic end products for all space transportation vehicles required for performance of this contract, inclusive of any launch vehicle and any other space transportation vehicle used to deliver payloads to the lunar surface. The cost of each component includes transportation costs to the place of incorporation into the CLPS and any applicable duty (whether or not a duty - free entry certificate is issued).

NASA's intent is to limit sources for the CLPS procurement for the purposes of industrial mobilization. NASA is not requesting that any capabilities or information be submitted by Industry. Market research has been conducted and completed. However, comments from Industry on less than full and open competition must be submitted within 15 days of this posting and NLT August 18, 2018 at 2:00 p.m.

 

Responders

 

Advanced Space
AeroJet Rocketdyne
Astrobotic
Blue Origin
Bryce Space Technology 
Dynetics
DRAPER  Labs
Fibertek
Gloyer-Taylor Laboratories
iSpace
Lockheed Martin
Lunar Experiences
Lunar Express 
Masten Space Systems
MEI Technologies
Miller Engineering & Research
Moon Express
Noosphere

Northrop Grumman Innovation Systems (formerly OrbitalATK)
PTScientists
Sierra Nevada Corporation
Spaceflight Industries
SpaceX
Special Aerospace Services
Space Systems Loral/Maxar
Team Indus
ULA
VALT Enterprises

 

Edited by DocM
  • Like 1
  • 2 months later...


https://spacenews.com/nasa-issues-call-for-payloads-to-go-on-commercial-lunar-landers/

 

Quote

NASA issues call for payloads to go on commercial lunar landers

 

WASHINGTON -- As NASA evaluates proposals for commercially developed small lunar landers, the agency is now seeking payloads that could fly on those spacecraft despite concerns from some scientists that they don’t know if their experiments are compatible with those landers.

NASA released Oct. 18 a formal solicitation for "Lunar Surface Instrument and Technology Payloads" that seeks experiments for flight on lander missions procured by the agency's Commercial Lunar Payload Services (CLPS) program. NASA plans to select 8 to 12 experiments next year for launch no earlier than 2020, with an overall budget of between $24 and 36 million in the first year of the program.
>

 

  • Like 1

Forgot that Moon Express may have some involvement here....

 

They just signed an agreement with CSA...

 

 

Moon Express website...neat Rocket lab venture shown.

http://www.moonexpress.com/

  • 5 weeks later...

And the commercial lunar race balloon goes up....

 

Timeline (note the human landers ~2024)

 

post-10859-0-07415000-1542359159.thumb.jpg.168ec6c6ea59e03c1d9d21c08c1acee8.jpg

 

https://www.sciencemag.org/news/2018/11/nasa-pay-private-space-companies-moon-rides


 

Quote

 

NASA to pay private space companies for moon rides

 

Next month, almost a half-century since the United States last landed a spacecraft on the moon, NASA is expected to announce plans for a return. But the agency will just be along for the ride. Rather than unveiling plans for its own spacecraft, NASA will name the private companies it will pay to carry science experiments to the moon on small robotic landers.

 

Under a program called Commercial Lunar Payload Services (CLPS), NASA would buy space aboard a couple of launches a year, starting in 2021. The effort is similar to an agency program that paid private space companies such as Elon Musk's SpaceX to deliver cargo to the International Space Station (ISS). "This a new way of doing business," says Sarah Noble, a planetary scientist at NASA headquarters in Washington, D.C., who is leading the science side of NASA's lunar plans.

 

Scientists are lining up for a ride. "It really feels like the future of lunar exploration," says Erica Jawin, a planetary scientist at the Smithsonian Institution's National Museum of Natural History in Washington, D.C. She and other attendees at the annual meeting of the Lunar Exploration Analysis Group in Columbia, Maryland, last week were eager to show NASA why their small experiments would be worthy hitchhikers on the landers.

>

 

Edited by DocM
  • Like 1
  • 2 weeks later...
  • 2 months later...
  • 8 months later...

The Gateway and lunar landing program has gone international under the name "Artemis"

 

While NASA and SpaceX work on propellant transfer for refuelling Starship from tankers in space, 

 

https://spacenews.com/blue-origin-lockheed-northrop-join-forces-for-artemis-lunar-lander/

 

Quote

Blue Origin, Lockheed, Northrop join forces for Artemis lunar lander

 

WASHINGTON -- Blue Origin is joining forces with three other major aerospace firms in a "national team" to develop a human lunar lander for NASA.

The company’s founder, Jeff Bezos, announced Oct. 22 his intent to work with Lockheed Martin, Northrop Grumman and Draper on the unnamed lunar lander, the proposal for which they will submit to NASA for its Human Landing Services competition.
>
>
Under the teaming arrangement, Blue Origin will serve as the prime contractor and provide a descent stage developed for its Blue Moon lunar lander unveiled earlier this year. Lockheed Martin will build a crew-rated ascent stage, leveraging systems it developed for the Orion spacecraft. Northrop Grumman will build a transfer stage to move the lander from the lunar Gateway to low lunar orbit, based on its Cygnus cargo spacecraft. Draper will provide guidance systems and avionics for the lander.
>

 

  • 4 weeks later...

New NASA CLPS program commercial lunar landers, and look who's coming to dinner!!

 

 

 

 

https://www.nasa.gov/press-release/new-companies-join-growing-ranks-of-nasa-partners-for-artemis-program

 


New Companies Join Growing Ranks of NASA Partners for Artemis Program

NASA has added five American companies to the pool of vendors that will be eligible to bid on proposals to provide deliveries to the surface of the Moon through the agencys Commercial Lunar Payload Services (CLPS) initiative.

The additions, which increase the list of CLPS participants on contract to 14, expand NASAs work with U.S. industry to build a strong marketplace to deliver payloads between Earth and the Moon and broaden the network of partnerships that will enable the first woman and next man to set foot on the Moon by 2024 as part of the agencys Artemis program.

American aerospace companies of all sizes are joining the Artemis program, said NASA Administrator Jim Bridenstine. Expanding the group of companies who are eligible to bid on sending payloads to the Moons surface drives innovation and reduces costs to NASA and American taxpayers. We anticipate opportunities to deliver a wide range of science and technology payloads to help make our vision for lunar exploration a reality and advance our goal of sending humans to explore Mars.

The selected companies are:

* Blue Origin, Kent, Washington

blueorigin_bluemoon.jpg

 

* Ceres Robotics, Palo Alto, California

ceres_0.jpg

 

* Sierra Nevada Corporation, Louisville, Colorado

snc_stp_lunar_lander_clps_013a.jpg

 

* Tyvak Nano-Satellite Systems Inc., Irvine, California

tyvak_clps_lunar_lander.jpeg

 

* SpaceX, Hawthorne, California

spacex_1.jpg

>
>

  • Like 1
  • 5 months later...

NASA Artemis crewed lunar lander selections,

 

SpaceX Starship lunar crew variant

 

Dynetics

 

"National Team" (Blue Origin, Lockheed-Martin, Northrop-Gumman, Draper Labs)

 

Boeing gets shut out

 

IMG_20200430_141408.thumb.jpg.edcc4aa704f4437f0b455edae6d54e10.jpg

 

SpaceX thread

IMG_20200430_133210.thumb.jpg.00ee6e08743d3a696ef6e1d7a342e6d2.jpg

 

Lunar Starship gets high-mounted landing thrusters. There goes the flying regolith problem.

 

Dynetics

IMG_20200430_143241.thumb.jpg.bcbebeef4bfbd039b60e83b5687a0396.jpg

 

"National Team"

IMG_20200430_143324.thumb.jpg.5823ad95a4affcfd8561943c87e557a1.jpg

 

  • Like 1

NASA Admin Jim Bridenstine about SpaceX & Starship,

https://arstechnica.com/science/2020/04/nasa-awards-lunar-lander-contracts-to-blue-origin-dynetics-and-starship/

>



"SpaceX is really good at flying and testing—and failing and fixing," he [Jim Bridenstine] said. "People are going to look at this and say, 'My goodness, we just saw Starship blow up again. Why are you giving them a contract?' The answer is because SpaceX is really good at iteratively testing and fixing. This is not new to them. They have a design here that, if successful, is going to be transformational. It’s going to drive down costs and it’s going to increase access, and it’s going to enable commercial activities that historically we’ve only dreamed about. I fully believe that Elon Musk is going to be successful. He is focused like a laser on these activities."

>

  • Like 1

Boeing has caIled out its bought & paid for Democrats in the House.  Imagine that 🙄

 

Rep. Eddie Bernice Johnson (D-TX), Chair of the Committee on Science and Technology

 

Rep. Kendra Horn (D-OK), Chair of the Subcommittee on Space and Aeronautics

 

https://science.house.gov/news/press-releases/chairwomen-johnson-and-horn-statements-on-artemis-human-lander-systems-contract-awards

 

 

  • Like 1
  • 1 month later...
  • 1 month later...
  • 3 weeks later...
  • 1 month later...

Italy joins the NAAA Artemis Moon program

 

Google Translated...

 

https://www.corriere.it/cronache/20_settembre_25/c-l-intesa-la-nasa-l-italia-missione-luna-143dfa08-ff6a-11ea-bab8-81c46a04ebd3.shtml

 

Quote

There is an agreement with NASA, Italy on a mission to the Moon

 

Agreement signed: Rome will invest over 1 billion euros. The project of building the first colony on the satellite

The Moon is also getting closer to Italy. An agreement of intent signed yesterday live in Rome and Washington leads to the goal of returning to our natural satellite, namely the construction of the first lunar colony. Thus specifies the document signed by NASA administrator Jim Bridenstine and Riccardo Fraccaro, undersecretary of the Prime Minister with responsibility for aerospace policies. Our national scientists and industries will be involved in three directions. The first concerns collaboration in the construction of the house-laboratory in which the astronauts will live and in the development of technologies to ensure the carrying out of the missions. The second commitment concerns the research that can be carried out at the base involving scientists from various disciplines, from biology to astronomy. All exploration and research activities will require a sophisticated communication network capable of allowing a constant connection with the Earth by transferring large amounts of data.

Artemis program

All this is part of the Artemis Programthat NASA has started to return to the moon with a woman and a man in 2024. But it will only be the first step to arrive at a stable settlement 4 years later. Meanwhile, the lunar space station Gateway will also be built to facilitate operations in which Japan, Canada, Europe and (soon) Russia already participate. All this will bring work to our industries which will carry out the various parts by developing innovations capable of guaranteeing the survival of the astronauts - explains Fraccaro -. The government expects an investment of over 1 billion, setting in motion an economic return that will go well beyond. The aim is to involve, in addition to the large companies already involved in the sector, other medium-small companies that until now have never thought of working for space but given their skills they can find ways of development on the lunar border.
>
>

  • 4 weeks later...
  • 5 weeks later...

Ouch! The edged editorial weapons are coming out...

 

(Context: NASA Human Lander Services mockups are arriving. Blue Origin's "America's Team" with Lockheed & others used silvered balloons for fuel tanks, what looked like particle or fiber board & scaffolds for the cabin, etc.. 

 

SpaceX, as shown one post up, is cutting metal and has a full size crew cabin or mission hardware module on display (it ain't little)

 

 

IMG_20201122_001742.thumb.jpg.95ab1d35446cae8252ea47e0230f3a28.jpg

 

America's Team mockup

 

IMG_20200820_200009.jpg.6f27ad8578717952

  • Haha 1
  • 1 month later...
  • 2 months later...
21 hours ago, bguy_1986 said:

Dragon XL?  That's surprising.  Nasa still unsure about starship?

 

Dragon XL was bid by SoaceX for Gateway cargo, launching on Falcon Heavy. Big beast it is, but still based on Dragon 2.  It won, and as of now is the only logistics vehicle selected to resupply Gateway.

 

There's been a lot of talk that if Starship makes orbit this year Dragon XL's contract  could be transferred to Starship. It'd be interetesting because Starship is much larger than Gateway.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Posts

    • ImgDrive 2.2.7 by Razvan Serea ImgDrive is a CD/DVD/BD emulator - a tool that allows you to mount optical disc images by simply clicking on them in Windows Explorer. If you have downloaded an ISO image and want to use it without burning it to a blank disc, ImgDrive is the easiest way to do it. ImgDrive features: One-click mounting of iso, cue, nrg, mds/mdf, ccd, isz images Runs on 32-bit and 64-bit Windows versions Mount ape, flac, m4a, wav, wavpack, tta file as AUDIO CD (16-bit/44.1kHz) Mount a folder as DVD/BD Mount images in command line Does not require rebooting after installation Support up to 7 virtual drives at the same time Support multi session disc image (ccd/mds/nrg) A special portable version is available Translated to more than 10 languages Support File Type: .ccd - CloneCD image files .cue - Cue sheets files of ape/flac/m4a/tta/wav/wv/bin .iso - Standard ISO image files .isz - Compressed ISO image files .nrg - Nero image files .mds - Media descriptor image files ImgDrive 2.2.7 changelog: Added command line parameter to set number of drives Added AACS-Auth support for HD DVD Bumped kernel driver version to 2.2.7 Download: ImgDrive 2.2.7 | 692 KB (Freeware, paid upgrade available) Download: ImgDrive Portable 535 KB View: ImgDrive Home Page | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • AnyDesk 9.7.7 by Razvan Serea AnyDesk is a fast remote desktop system and enables users to access their data, images, videos and applications from anywhere and at any time, and also to share it with others. AnyDesk is the first remote desktop software that doesn't require you to think about what you can do. CAD, video editing or simply working comfortably with an office suite for hours are just a few examples. AnyDesk is designed for modern multi-core CPUs. Most of AnyDesk's image processing is done con­currently. This way, AnyDesk can utilize up to 90% of modern CPUs. AnyDesk works across multiple platforms and operating systems: Windows, Linux, Free BSD, Mac OS, iOS and Android. Just 7 megabytes - downloaded in a glimpse, sent via email, or fired up from your USB drive, AnyDesk will turn any desktop into your desktop in se­conds. No administrative privileges or installation needed. AnyDesk 9.7.7 fixes: Fixed an issue that prevented users from creating meetings without an active license Download: AnyDesk 9.7.7 | 8.0 MB (Free for private use, paid upgrade available) Links: AnyDesk Home Page | Other platforms | Release History | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • I used a Pixel 10 Pro XL when it first came out for about 8 months. When I first got it, it was using Google assistant and that was fast, when asking it to call somone etc. Then it automatically switched with some update to Gemini. Doing even the simplist of things like asking it to call someone in my contacts was soooooo slow compared to Google assistant. I guess it had to go out to the cloud to do that? Back on iPhone and while Siri is dumb right now, it does do those simple things, like call someone, set a timer, star the stop watch etc, really fast. That an while I like Google Material Design 3 over iOS 26, they Pixel 10 Pro XL was so slow in comparison to the iPhone 17 Pro I am using.
    • I use Gemini in my rotation of AI clients...that work pays for. It is good at most things, better than copilot for imgage searching and making images, worse at writing vs Claude and way worse at hadling technical issues when it comes to Azure stuff. I also use YT premium and maps. Anything else Google is a pass for me. I have now seen multiple people locked out of their Google accounts for reasons that are just very vauge.
    • Microsoft is building an AI datacenter that "uses less water than a fast food restaurant" by Ivan Jenic Image: Microsoft Microsoft has announced plans to build a new datacenter campus in Pecos, Texas, as the company continues to invest billions in AI infrastructure. The new facility, called project Kilby, will reportedly have a capacity of 2 gigawatts and will be one of the largest single capacity additions in the company’s history. To power the campus, Microsoft signed a 20-year deal with Chevron to supply natural gas from the Permian Basin, America's largest oil field. This deal is set to become the largest collaboration to date between a U.S. oil and gas giant and Big Tech. It’s no secret that Big Tech has often been criticized for exploiting natural resources for its AI developments. Microsoft is trying to mitigate some of that negative consensus by promising to build its own power supply for the new datacenter, independent of the public grid. The Pecos datacenter will be powered by a power plant hub, built by Chevron, with up to 2.5 gigawatts of gas-fired capacity, with potential to scale to up to 5 gigawatts. The facility will include at least seven GE Vernova turbines, with first power potentially coming online as early as late 2027 or early 2028. The power plant hub is part of an approximately $7 billion investment by Chevron, making it one of the largest dedicated energy projects tied to a single datacenter campus in the U.S. Microsoft hasn’t publicly disclosed the amount it’s investing in the new datacenter. Microsoft has also committed to implementing a closed-loop cooling system that will only require an initial water charge to operate. The company said that “the total lifecycle water use of this datacenter is only a fraction of that consumed annually by a typical fast-food restaurant.” What the press release doesn’t mention, however, is how much water the natural gas plant itself will consume, or how a 20-year fossil fuel commitment squares with the company's pledge to be carbon negative by 2030. The construction of the new datacenter should provide over 6,000 construction jobs at peak build-out, and create hundreds of operational job roles once the facility is built. Via: Reuters
  • Recent Achievements

    • Dedicated
      tuben earned a badge
      Dedicated
    • Week One Done
      mnsgroup earned a badge
      Week One Done
    • Conversation Starter
      sumytbe earned a badge
      Conversation Starter
    • One Year In
      B4dM1k3 earned a badge
      One Year In
    • One Year In
      DarkWun earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      525
    2. 2
      +Edouard
      199
    3. 3
      PsYcHoKiLLa
      94
    4. 4
      Michael Scrip
      82
    5. 5
      Steven P.
      67
  • Tell a friend

    Love Neowin? Tell a friend!