Recommended Posts

  • 5 weeks later...

NASA Artemis 3 Lunar landing site candidates.

 

SpaceX will select its own site for an earlier uncrewed test landing of Starship HLS*, which will also be within 6° latitude of the Lunar South Pole.

 

* Starship Human Landing System

 

Space News article

 

https://spacenews.com/nasa-selects-potential-lunar-landing-sites-for-artemis-3/

 

Quote

 

NASA selects potential lunar landing sites for Artemis 3

 

WASHINGTON — NASA has selected 13 regions around the south pole of the moon that it is considering for the first crewed landing of the Artemis program later this decade.

 

The 13 locations released by NASA Aug. 19 reach include multiple sites that could host landings by SpaceX’s Starship vehicle serving as the lunar lander for the Artemis 3 mission that will carry the first NASA astronauts to the surface of the moon since Apollo 17 a half-century ago.

>

The 13 locations, each about 15 by 15 kilometers, are located within six degrees of latitude of the south pole.

 

They are named:

 

• Faustini Rim A

• Peak Near Shackleton

• Connecting Ridge

• Connecting Ridge Extension

• de Gerlache Rim 1

• de Gerlache Rim 2

• de Gerlache-Kocher Massif

• Haworth

• Malapert Massif

| Leibnitz Beta Plateau

• Nobile Rim 1

• Nobile Rim 2

• Amundsen Rim

>

 

Edited by DocM
  • 2 weeks later...

NASA Starship presentation for IAC 2022

 

PDF link in the first tweet.

 

 

 

20220909_173211.jpg.33fabe0d01d83eb267d9f0b23fd1ee31.jpg

 

1041893637_StarshipHLSNEW.thumb.jpg.089eced6b86e3bc52976e0eb8f971417.jpg

 

Quote

Conclusions


Responsible for the transportation of humans between lunar orbit and the lunar surface, the Human Landing System program is at the center of Artemis, designed to yield groundbreaking science, develop, and utilize lunar surface resources and leverage what we learn at the Moon for future Mars missions. NASA is committed to establishing a sustained lunar presence, and through Option A and working closely with SpaceX, the HLS program will facilitate the rapid development and demonstration of the human landing system that will deliver the first woman, and in a later mission, the first person of color, to the Moon. The HLS capability demonstrated during the Artemis III mission will evolve into a safe and affordable long-term approach to accessing the lunar surface and to being one of many customers purchasing lunar transportation services. 

 

Through Artemis, NASA and its international and commercial partners will establish a cadence of trips to the Moon where American astronauts will conduct science investigations, technology demonstrations, and establish a long-term presence to prepare for humanity’s next giant leap – sending astronauts on a roundtrip to Mars.

 

The HLS program continues its hard work toward  achieving major agency milestones as NASA embarks on its mission to explore deep space and beyond this decade and into the future.

 

  • 1 month later...

Starship HLS picks up another lunar landing - Artemis IV.

Also updates on the seond  lander competitors, with Lockheed-Martin offering a nuclear thermal Earth departure engine.

https://spacenews.com/lunar-landing-restored-for-artemis-4-mission/

Quote

Lunar landing restored for Artemis 4 mission

HUNTSVILLE, Ala. — NASA has restored plans to include a lunar landing on its Artemis 4 mission to the moon later this decade, months after saying that the mission would instead be devoted to assembly of the lunar Gateway.

>

Kirasich confirmed after the panel that NASA had decided to include a landing on Artemis 4 again. The mission would likely use the “Option B” version of SpaceX’s Starship lander, he said.

>

[...] Option B would fund changes to the Starship lander to support more ambitious missions in the later “sustainable” phase of Artemis, and include a second demonstration mission.

>

 

  • 3 weeks later...

Crewed Starship HLS for Artemis IV confirmed.

This is an Option B contract which only SpaceX was allowed to bid on. Option B funds $1.15 billion for additional capabilities; docking at the Lunar Gateway, more crew & payload, etc. This puts total Starship HLS funding at over $4 billion.

That's 3 NASA lunar landings for Starship HLS - one uncrewed landing test in 2024 and two crewed landings; Artemis III (2025) and Artemis IV (2027)

A second crewed lunar lander will be competed under a different contract. 

https://www.nasa.gov/press-release/nasa-awards-spacex-second-contract-option-for-artemis-moon-landing-0

  • 4 weeks later...

SLD: competition for a 2nd  human lander system (HLS) in the Artemis program. This in addition to the Starship HLS vehicle.

https://spacenews.com/blue-origin-and-dynetics-bidding-on-second-artemis-lunar-lander/

Quote

 

Blue Origin and Dynetics bidding on second Artemis lunar lander

WASHINGTON — Teams led by Blue Origin and Dynetics, runners-up in NASA’s first competition to develop a lander to transport astronauts to the lunar surface, have submitted proposals for a NASA competition to select a second lander.

>

[...] The company NASA selects for SLD will fly one demonstration mission, likely no earlier than Artemis 5 in the late 2020s, and be eligible to compete for future missions.

>

NASA expects to select the winner of the SLD competition in June 2023.

 

  • 3 months later...
  • 1 month later...
  • 6 months later...
On 05/12/2023 at 09:58, bguy_1986 said:

How is that?  Don't they need another Starship up there to transfer with?

 

They are using inertia to transfer propellant from one tank to another, firing thrusters and letting Gs do the work. They can test this  inside a single vehicle, moving propellant from a header tank to a main. 

  • Like 1
  • 1 month later...

UAE will make part of the Lunar Gateway

https://www.nasa.gov/news-release/nasa-united-arab-emirates-announce-artemis-lunar-gateway-airlock/

NASA and the Mohammed Bin Rashid Space Centre (MBRSC) have entered into an agreement for MBRSC to provide the Crew and Science Airlock module for the Gateway Space Station. As part of the agreement, NASA will fly a United Arab Emirates astronaut to Gateway on a future Artemis mission. Pictured is an artist’s concept of Gateway (left) and an artist’s concept of a government reference airlock (right).

  • 3 months later...

Eric Berger reports on Ars Technica  NASA is quietly considering having Orion dock with Starship HLS in low Earth orbit for Artemis 3. Still having concerns about Orion's heat shield returning at lunar velocities. 10 years after its first flight and still no solution.

https://arstechnica.com/space/2024/04/nasa-may-alter-artemis-iii-to-have-starship-and-orion-dock-in-low-earth-orbit/\

In 2020 Robert Zubrin proposed they should scratch SLS/Orion and use Crew Dragon/Falcon Heavy. NASA said no.

With NASA now prepared the forego  Gateway and dock in LEO, Crew Dragon could take over the whole job. Saves almost $5 billion.

 

  • Facepalm 1

Astrolab FLEX lunar/Mars  rover is the base of the crewed Lunar Terrain Vehicle, designed for Starship HLV.  Just got a $1.9 billion NASA development contract. 

 

Quote

Shortly after Matthews let me drive around the parking lot in various modes, I had three immediate thoughts. It was a hell of a lot of fun to drive. For someone like me with limited piloting skills, it was remarkably intuitive to handle. And holy crap, can you imagine being an astronaut driving across the Moon in this?

 

 And it has a BIG robotic arm

 

Edited by DocM

NASA selects Japan's Lunar Cruiser, an RV for the Moon, a collaboration between JAXA, Toyota and Mitsubishi. Definitely a Starship payload.

In return, their astronauts get to go to the Moon

The vehicle uses a regenerative fuel cell; 

https://www.japantimes.co.jp/news/2023/07/22/business/corporate-business/toyota-moon-rover/

  Quote

Toyota said its technology will utilize solar energy and water to produce hydrogen and oxygen through electrolysis during daylight hours, and the fuel cells to supply electricity during the night.

A lunar night lasts about 14 Earth days, so with help of the technology the lunar rover would be able to ride for many days at a stretch even when it is dark and extremely cold

 

https://arstechnica.com/space/2024/04/japan-will-be-first-among-nasas-partners-to-have-an-astronaut-on-the-moon/
 

  Quote

The Japan Aerospace Exploration Agency (JAXA) has been working with Toyota and Mitsubishi Heavy Industries for several years on the design of a pressurized rover. The vehicle would be roughly the size of two minibuses parked side by side, measuring nearly 20 feet (6 meters) long, 17 feet (5.2 meters) wide, and 12.5 feet (3.8 meters) tall. Its interior cabin could offer "comfortable accommodation" for two people, or four in an emergency, according to Toyota.

>

The pressurized rover concept, which Toyota calls the "Lunar Cruiser," could explore the moon with astronauts inside for up to 30 days at a time. Crew members will be able to take off their spacesuits and work inside the vehicle in regular clothing. When astronauts aren't onboard, operators could remotely control the rover from a separate spacecraft or from Earth. Japanese officials aim to deliver it to the Moon in 2031, where it will operate for 10 years.

 

001-800x450.jpg.9481e9322d047a2f6c0468b1c3d92803.jpg

 More about the 2025 chaser/target Starship propellant transfer test 

 

Quote

The in-space propellant transfer test will be followed by an uncrewed demonstration mission of the HLS Starship, including fueling the vehicle and sending it to the moon for a landing. That mission will also feature an “ascent demo” not originally included in the plan, he said, to prove Starship can lift off the lunar surface.

 

  • 1 month later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Posts

    • Researchers claim Microsoft's quantum breakthrough is flawed by basic Python errors by Karthik Mudaliar Microsoft's aggressive roadmap to deliver a commercial quantum supercomputer by 2029 has now hit a bit of a snag, and it's not because of a complex sub-zero dilution refrigerator, but rather because of a few lines of basic Python code. A new critique published in the scientific journal Nature argues that simple software errors effectively manufactured the breakthrough that Microsoft's foundational research claimed back in 2025 into Majorana-based topological qubits. Topological quantum computing, the path that Microsoft chose for its research, relies on creating and controlling "Majorana zero modes." These are exotic quasiparticles that theoretically offer vastly superior error resistance compared to the highly sensitive superconducting qubits currently being championed by rivals like Google and IBM. However, physically proving you have created these particles requires sifting through massive amounts of complex electrical conductance data to isolate a specific "topological gap." Because of the sheer volume of data, physicists rely heavily on custom software pipelines to process the results. This is where the Python scripts come in. Now, according to the critique, Microsoft’s data processing software contained fundamental programming errors that ultimately skewed the published results. By mishandling data arrays or deploying incorrect logic within the Python script, the software supposedly discarded "noisy" or contradictory data. Which is why it only highlighted the specific electrical measurements that supported the topological-gap claim. The researchers behind the critique argued that this makes the findings invalid, suggesting the heralded "quantum leap" was actually a false positive generated by bad code and not a product of groundbreaking physics. However, Microsoft is pushing back hard against these allegations. The Redmond giant has formally rejected the criticism, saying that it's just a minor anomaly rather than a fatal flaw. According to the company, while there may have been a minor oversight in the data parsing scripts, it does not alter the fundamental reality of their physical experiment. Just weeks ago, Microsoft unveiled the Majorana 2 quantum processor, a milestone so significant that the company boldly accelerated its timeline for a commercial quantum supercomputer from 2035 down to 2029. But the new software allegations reopen an old wound. Microsoft's quantum division faced a remarkably similar crisis when a landmark 2018 paper on Majorana particles was famously retracted in 2021 after independent physicists discovered the data had been inappropriately cropped. That historical baggage makes the current Python-related allegations particularly sensitive. If the foundational math and data processing for the 2025 breakthrough are genuinely flawed, the highly anticipated 2029 commercial timeline could easily be delayed or, worse, cancelled.
    • Because of what they have done to VMware I will never buy anything Broadcom again.
    • AMD releases hotfix for driver install issues on Windows 10 PCs by Taras Buria Earlier this week, AMD released an important graphics driver update. Version 26.6.2 brought AMD FSR 4.1 support to the previous-gen Radeon lineup, the RX 7000 series, giving users better upscaling tech that was previously locked to the newest GPUs. However, the driver turned out to be a little buggy, with users reporting installation issues on systems still running Windows 10. AMD quickly acknowledged the bug and today released a hotfix to resolve the problem. The AMD 26.6.3 Hotfix update is now available for download from the official website. Given that it is a hotfix release, it has only one change in its release notes: AMD announced the update on its official X account and added that a WHQL driver update with the necessary fixes would be released next week. Meanwhile, users can apply the hotfix or roll back to the previous driver using the official AMD Cleanup Utility. You can download AMD Software: Adrenalin Edition 26.6.3 Hotfix Preview Driver from the official website here. It is compatible with all currently supported graphics cards and 64-bit Windows 10 and 11. Full release notes are available on the same page.
    • With Microsoft now listening to its core audience and acting upon received feedback, fans can finally expect a much better version of Windows 11 than what was available five years ago. Here is to five more years, Windows 11! I guess we all need a good laugh now and again...
  • Recent Achievements

    • Dedicated
      Scoobystu earned a badge
      Dedicated
    • First Post
      Tom Schmidt earned a badge
      First Post
    • One Month Later
      D0nn13 earned a badge
      One Month Later
    • Rookie
      +ChiefOfNeo went up a rank
      Rookie
    • One Year In
      Tom Schmidt earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      466
    2. 2
      +Edouard
      177
    3. 3
      PsYcHoKiLLa
      123
    4. 4
      Michael Scrip
      82
    5. 5
      Xenon
      76
  • Tell a friend

    Love Neowin? Tell a friend!