Logitech MX Master 3 - change order for devices..


Recommended Posts

Hi all, nice to see everything is going well here.

I have a short and probably easy question for mx owners.. As you know you have the option to switch from one device-to-another by simply clicking that special button (below). The ideea is nice but I want it this way :

1 - PC

2 - Laptop

3 - Ipad

 

Right now.. Ipad -1 ; Laptop - 2 and PC -3 . How can I change the mapping? Haven't found anything in their software.

Thanks a lot.

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

Edited by Cosmin
29 minutes ago, Cosmin said:

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

  • Like 2
7 minutes ago, adrynalyne said:

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

3 minutes ago, Matthew S. said:

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

I’ve never been able to get that working. 😕

5 minutes ago, adrynalyne said:

I’ve never been able to get that working. 😕

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

6 minutes ago, Cosmin said:

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

Doesn't matter which version you own, they're actually the same and can pair with the same devices, the only difference with the Mac one is it doesn't come with the Unifying receiver, the usb dongle)  Also my scroll is set up normal. and I don't use it with an iPad (actually dont own a modern ipad, my ipad is an iPad 2 and no longer used).

 

For your scrolling issue, try going into the Settings app -> General -> Mouse and Trackpad and turn off Natural Scrolling

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

4 minutes ago, Cosmin said:

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

Has nothing to do with Logitech, that affects all bluetooth mice brands lol.

 

Scroll direction is controlled by the OS, not the driver/hardware vendor.  Logitech may put it in a more convenient place, but I can use their mice without the software (as I do on my work laptop and with bluetooth at that, which is technically an unsupported config with logitech mice and windows).

28 minutes ago, Matthew S. said:

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Just now, adrynalyne said:

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

2 minutes ago, Matthew S. said:

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

I wonder if my g915 can use Flow, I had an MX keys last I tried. I have dual NICs as well. 

I don't think G series products support it since it's built into the logitech options software and not the g hub.

 

Also I just ran a cable, can confirm that it works when you have one dedicated nic to the host machine and one dedicated to the vm network :)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • BleachBit 6.0.1 Beta by Razvan Serea When your computer is getting full, BleachBit quickly frees disk space. When your information is only your business, BleachBit guards your privacy. With BleachBit you can free cache, delete cookies, clear Internet history, shred temporary files, delete logs, and discard junk you didn't know was there. Designed for Linux and Windows systems, it wipes clean thousands of applications including Firefox, Microsoft Edge, Google Chrome, Opera, Safari, and more. Beyond simply deleting files, BleachBit includes advanced features such as shredding files to prevent recovery, wiping free disk space to hide traces of files deleted by other applications, and vacuuming Firefox to make it faster. Better than free, BleachBit is open source. BleachBit has many useful features: Delete your private files so completely that "even God can't read them" according to South Carolina Representative Trey Gowdy. Simple operation: read the descriptions, check the boxes you want, click preview, and click delete. Multi-platform: Linux and Windows Free of charge and no money trail Free to share, learn, and modify (open source) No adware, spyware, malware, browser toolbars, or "value-added software" Translated to 64 languages besides American English Shred files to hide their contents and prevent data recovery Shred any file (such as a spreadsheet on your desktop) Overwrite free disk space to hide previously deleted files Portable app for Windows: run without installation Command line interface for scripting and automation CleanerML allows anyone to write a new cleaner using XML Automatically import and update winapp2.ini cleaner files (a separate download) giving Windows users access to 2500+ additional cleaners Frequent software updates with new features Going beyond standard deletion of files, BleachBit has several advanced cleaners: Clear the memory and swap on Linux Delete broken shortcuts on Linux Delete the Firefox URL history without deleting the whole file—with optional shredding Delete Linux localizations: delete languages you don't use. More powerful than localepurge and available on more Linux distributions. Clean APT for Debian, Ubuntu, Kubuntu, Xubuntu, and Linux Mint Find widely-scattered junk such as Thumbs.db and .DS_Store files. Execute yum clean for CentOS, Fedora, and Red Hat to remove cached package data Delete Windows registry keys—often where MRU (most recently used) lists are stored Delete the OpenOffice.org recent documents list without deleting the whole Common.xcu file Overwrite free disk space to hide previously files Vacuum Firefox, Google Chrome, Liferea, Thunderbird, and Yum databases: shrink files without removing data to save space and improve speed Surgically remove private information from .ini and JSON configuration files and SQLite3 databases without deleting the whole file Overwrite data in SQLite3 before deleting it to prevent recovery (optional) BleachBit 6.0.1 Beta release notes: BleachBit 6.0.1 beta is now available for testing. This maintenance-focused release includes bug fixes, updated translations, and a range of safe enhancements. This release fixes a Windows security issue that could allow arbitrary file deletion during privileged cleaning (reported by Zeze with TeamT5). It also adds new cleaners (including a DNS cache cleaner, Claude Code, and Visual Studio Code forks), support for multiple Chrome and Edge profiles, new deep scan options for developer directories like node_modules and venv, and safer, faster file shredding. All Platforms Added cleaners for Claude Code, DNS cache, and many Visual Studio Code forks. Added support for multiple Chrome and Edge profiles. Chrome can now clean downloaded AI models. Deep Scan can optionally remove venv, __pycache__, node_modules, and .angular directories. Deep Scan is faster by skipping directories on the keep list. File shredding is safer, faster, and leaves fewer recoverable traces. Improved handling of cookies, symlinks, Unicode filenames, external processes, and configuration files. Improved Expert Mode warnings and long warning dialogs. Fixed crashes related to cleaner detection, invalid Unicode, and malformed cleaner data. Clipboard is now cleared automatically after shredding files via paste operations. Linux Added AppImage support. Added cleaners for Visual Studio Code, Codeium, Librewolf (.deb), Transmission (Flatpak), and Profanity. Improved Linux trash detection, including Snap-installed applications and mounted drives. Fixed Wayland root CLI issues and several Snap-related problems. Improved package dependencies, AppStream metadata, and desktop file handling. Fixed startup crashes when Python Requests is unavailable. Windows Fixed a security vulnerability that could allow arbitrary file deletion when cleaning with elevated privileges. Added %WindowsSystem% variable support. Improved clipboard clearing using native Windows APIs. Improved installer experience on unsupported Windows versions. Reduced installer size and improved application robustness. Fixed Unicode handling, filename anonymization, Git revision reporting, and splash screen stability. [full release notes] Download: BleachBit 6.0 | Portable | ~20.0 MB (Open Source) View: BleachBit Home page | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • DriversCloud 12.1.6 by Razvan Serea With DriversCloud (formerly My-Config.com), you can explore your computer easily, safely and free. The application quickly scans your PC and identifies the hardware and software components. DriversCloud then establishes a list of the different drivers compatible with your OS and hardware. Download the drivers needed for the proper functioning of your computer. To detect your drivers, DriversCloud also displays a detailed summary of your hardware and software configuration, analyzes your BSOD, monitors in real-time your PC voltages and temperatures and lets you share your configuration online. Once the hardware components have been detected, you will be able to obtain with just a few clicks the latest drivers corresponding to the identified hardware. You can record your configuration on the site for free, and can get the corresponding URL to post the configuration to technical forums, e-mail and social networks. You can also download the detection result (the configuration) as a PDF file. To protect the user's privacy and data confidentiality, a 4-level confidentiality system was created that filters the XML marks and gives control to the user. The default level can be modified in the preferences. Using the maximum level will prevent the user from publishing his configuration and generating a corresponding PDF file. In non-connected mode, each XML configuration is stored on the server for one day (for practical reasons). However, you are given the opportunity to manually delete it. Created in 2004, and continually improved, My-Config.com has established itself on the web as a free service to PC users running Windows and Linux operating systems. The service is designed to work with the most common Internet browsers (Edge, Firefox, Chrome, Safari). Download: DriversCloud 64-bit | 20.0 MB (Freeware) Download: DriversCloud 32-bit | 18.9 MB Link: DriversCloud Home Page | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • One Month Later
      AndreaB earned a badge
      One Month Later
    • One Month Later
      agatameier earned a badge
      One Month Later
    • Week One Done
      agatameier earned a badge
      Week One Done
    • Week One Done
      ssd21345 earned a badge
      Week One Done
    • Contributor
      MarkHughes4096 went up a rank
      Contributor
  • Popular Contributors

    1. 1
      +primortal
      516
    2. 2
      +Edouard
      193
    3. 3
      PsYcHoKiLLa
      147
    4. 4
      ATLien_0
      96
    5. 5
      Steven P.
      77
  • Tell a friend

    Love Neowin? Tell a friend!