Logitech MX Master 3 - change order for devices..
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Posts
-
By skinnyJM · Posted
Since they open sourced the calculator in Win 10/11 it is much better and can do a lot, I love it. -
By +Edouard · Posted
That's just silly imo. The lengths that man goes to just to avoid W11 is just nuts. Very, very few home users would do that. I will say this though, he is committed. Btw, I note on askwoody that Woody Leonhard passed away March, 2025 aged 73. His site was one of my favorites back in the day. Belated yes but RIP Woody. -
By +Eternal Tempest · Posted
Because of the EU (a good thing) newer android devices been getting 5 years worth of security patches. Except some Motorola which found the loop hole, and offer ZERO updates. In addition, Google for years have been making where it can patch some stuff by updating the core Google Play Store itself. As echoed earlier, you take the security risk in to your own hand beyond supported. -
By Brian Miller · Posted
Are people still using Teams? -
By Copernic · Posted
Win11Debloat 06.11.2026 by Razvan Serea Win11Debloat is a lightweight, easy to use PowerShell script that allows you to quickly declutter and customize your Windows experience. It can remove pre-installed bloatware apps, disable telemetry, remove intrusive interface elements and much more. The script also includes many features that system administrators and power users will enjoy. Such as a powerful command-line interface, support for Windows Audit mode and the option to make changes to other Windows users. All changes made by Win11Debloat can be easily reversed, and most removed apps can be restored via the Microsoft Store. A full guide on how to undo the changes is available here. Win11Debloat features: Below is an overview of the key features and functionality offered by Win11Debloat. Please refer to the wiki for more information about the default settings preset. Remove a wide variety of preinstalled apps. Click here for more info. Disable telemetry, diagnostic data, activity history, app-launch tracking & targeted ads. Disable tips, tricks, suggestions & ads across Windows. Disable Windows location services & app location access. Disable Find My Device location tracking. Disable 'Windows Spotlight' and tips & tricks on the lock screen. Disable 'Windows Spotlight' desktop background option. Disable ads, suggestions and the MSN news feed in Microsoft Edge. Hide Microsoft 365 ads on the Settings 'Home' page, or hide the 'Home' page entirely. Disable & remove Microsoft Copilot. Disable Windows Recall. Disable Click to Do, AI text & image analysis tool. Prevent AI service (WSAIFabricSvc) from starting automatically. Disable AI Features in Edge. Disable AI Features in Paint. Disable AI Features in Notepad. Disable the Drag Tray for sharing & moving files. Restore the old Windows 10 style context menu. Turn off Enhance Pointer Precision, also known as mouse acceleration. Disable the Sticky Keys keyboard shortcut. Disable Storage Sense automatic disk cleanup. Disable fast start-up to ensure a full shutdown. ...and more. Once you’ve downloaded the Win11Debloat file (Get.ps1), just follow these quick steps: Locate the Get.ps1 script file. Right-click the file and select Run with PowerShell from the context menu. If prompted by User Account Control (UAC), select Yes to grant the script the necessary administrative permissions. Win11Debloat 06.11.2026 fixes: Fix lock screen spotlight option being disabled when disabling the start recommended section by @Raphire in #619 Fix log message formatting by @Raphire Note The -RemoveCommApps and -RemoveW11Outlook command-line parameters for uninstalling a few specific apps have been removed with this release. If you previously relied on these parameters, please see this wiki page for alternative methods of removing these apps. Download: Win11Debloat 06.11.2026 | Open Source View: Win11Debloat Home Page | Screenshots 1| 2 Get alerted to all of our Software updates on Twitter at @NeowinSoftware
-
-
Recent Achievements
-
restore went up a rank
Rookie
-
AndrewSteel earned a badge
Very Popular
-
Taliseian went up a rank
Veteran
-
Clizby earned a badge
One Month Later
-
Timaximus earned a badge
One Month Later
-
-
Popular Contributors
-
Tell a friend
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now