Logitech MX Master 3 - change order for devices..


Recommended Posts

Hi all, nice to see everything is going well here.

I have a short and probably easy question for mx owners.. As you know you have the option to switch from one device-to-another by simply clicking that special button (below). The ideea is nice but I want it this way :

1 - PC

2 - Laptop

3 - Ipad

 

Right now.. Ipad -1 ; Laptop - 2 and PC -3 . How can I change the mapping? Haven't found anything in their software.

Thanks a lot.

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

Edited by Cosmin
29 minutes ago, Cosmin said:

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

  • Like 2
7 minutes ago, adrynalyne said:

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

3 minutes ago, Matthew S. said:

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

I’ve never been able to get that working. 😕

5 minutes ago, adrynalyne said:

I’ve never been able to get that working. 😕

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

6 minutes ago, Cosmin said:

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

Doesn't matter which version you own, they're actually the same and can pair with the same devices, the only difference with the Mac one is it doesn't come with the Unifying receiver, the usb dongle)  Also my scroll is set up normal. and I don't use it with an iPad (actually dont own a modern ipad, my ipad is an iPad 2 and no longer used).

 

For your scrolling issue, try going into the Settings app -> General -> Mouse and Trackpad and turn off Natural Scrolling

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

4 minutes ago, Cosmin said:

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

Has nothing to do with Logitech, that affects all bluetooth mice brands lol.

 

Scroll direction is controlled by the OS, not the driver/hardware vendor.  Logitech may put it in a more convenient place, but I can use their mice without the software (as I do on my work laptop and with bluetooth at that, which is technically an unsupported config with logitech mice and windows).

28 minutes ago, Matthew S. said:

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Just now, adrynalyne said:

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

2 minutes ago, Matthew S. said:

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

I wonder if my g915 can use Flow, I had an MX keys last I tried. I have dual NICs as well. 

I don't think G series products support it since it's built into the logitech options software and not the g hub.

 

Also I just ran a cable, can confirm that it works when you have one dedicated nic to the host machine and one dedicated to the vm network :)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • low latency mode is still bugged and causing bootup times slow to a crawl. To fix, you have to disable the feature with vivetool. Seems as though it's not rolled out to a lot of people yet since I've only been able to find only a handful of people that are having issues.
    • I would recommend the Nothing 2a. The battery life is awesome, 2 or 3 days without going into battery power mode. The only thing that I've been looking into recently is that it doesn't "support" Graphene OS. I'm pretty sure there is a way, I just need to do some more looking.
    • You'd have to show me an example of a listing that says Gen 1, usually i'd expect that to mean Snapdragon Gen 1 (a type of chipset, which the Pixels don't use). Pixel 7 - White - 128gb - Unlocked - 85%+ battery - Grade B+ - $159 with free delivery - https://www.ebay.com/itm/398046617206 Pixel 7 - Obsidian - 128gb - Unlocked - 80%+ battery - Very Good - $157 with free delivery - https://www.ebay.com/itm/355617734563 Both look to be sold by companies with good feedback, dealing with refurbished phones and state the phones are unlocked with a clean IMEI. Obviously I can't vouch for either company though, but the listings look good in my opinion.
    • Because Chrome is doing it. And no one said anyone had to update immediately. That's silly. They could update every day for all I care as long as it's fast, and the next time the browser restarts, you're good. And the basic point is not to tee it up for bigger updates. As it is right now, all the windows I had open reopen anyway except inprivate.
    • Why? Does anybody actually want this? The constant need to close all browser sessions and wait for a new version to install, just so that there’s a integrated coupon manager feels like a waste of everyone’s time
  • Recent Achievements

    • Week One Done
      davidbazooked earned a badge
      Week One Done
    • One Month Later
      Jamswaz earned a badge
      One Month Later
    • Week One Done
      Jamswaz earned a badge
      Week One Done
    • Rookie
      Marzoid went up a rank
      Rookie
    • Community Regular
      coch went up a rank
      Community Regular
  • Popular Contributors

    1. 1
      +primortal
      514
    2. 2
      PsYcHoKiLLa
      185
    3. 3
      +Edouard
      159
    4. 4
      Steven P.
      83
    5. 5
      ATLien_0
      75
  • Tell a friend

    Love Neowin? Tell a friend!