Logitech MX Master 3 - change order for devices..


Recommended Posts

Hi all, nice to see everything is going well here.

I have a short and probably easy question for mx owners.. As you know you have the option to switch from one device-to-another by simply clicking that special button (below). The ideea is nice but I want it this way :

1 - PC

2 - Laptop

3 - Ipad

 

Right now.. Ipad -1 ; Laptop - 2 and PC -3 . How can I change the mapping? Haven't found anything in their software.

Thanks a lot.

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

Edited by Cosmin
29 minutes ago, Cosmin said:

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

  • Like 2
7 minutes ago, adrynalyne said:

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

3 minutes ago, Matthew S. said:

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

I’ve never been able to get that working. 😕

5 minutes ago, adrynalyne said:

I’ve never been able to get that working. 😕

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

6 minutes ago, Cosmin said:

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

Doesn't matter which version you own, they're actually the same and can pair with the same devices, the only difference with the Mac one is it doesn't come with the Unifying receiver, the usb dongle)  Also my scroll is set up normal. and I don't use it with an iPad (actually dont own a modern ipad, my ipad is an iPad 2 and no longer used).

 

For your scrolling issue, try going into the Settings app -> General -> Mouse and Trackpad and turn off Natural Scrolling

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

4 minutes ago, Cosmin said:

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

Has nothing to do with Logitech, that affects all bluetooth mice brands lol.

 

Scroll direction is controlled by the OS, not the driver/hardware vendor.  Logitech may put it in a more convenient place, but I can use their mice without the software (as I do on my work laptop and with bluetooth at that, which is technically an unsupported config with logitech mice and windows).

28 minutes ago, Matthew S. said:

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Just now, adrynalyne said:

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

2 minutes ago, Matthew S. said:

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

I wonder if my g915 can use Flow, I had an MX keys last I tried. I have dual NICs as well. 

I don't think G series products support it since it's built into the logitech options software and not the g hub.

 

Also I just ran a cable, can confirm that it works when you have one dedicated nic to the host machine and one dedicated to the vm network :)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Anthropic pulls Fable 5 and Mythos 5 after US export control order by Pradeep Viswanathan In April this year, Anthropic launched the Claude Mythos Preview frontier model with state-of-the-art cyber and coding capabilities for a select set of companies around the world. After preparing appropriate guardrails, early this week, Anthropic launched Claude Fable 5 and Mythos 5, its most capable AI models. Claude Fable 5 is for general users and comes with strict safeguards, while Mythos 5 is designed with fewer safeguards for cybersecurity and biology use cases. Today, Anthropic abruptly suspended access to its Fable 5 and Mythos 5 AI models for all customers after receiving an export control directive from the US government. The company received the directive from the government today at 5:21 p.m. ET, and the received letter did not provide any details regarding the national security concern. Anthropic understands that the government became aware of a method to bypass, or “jailbreak,” Fable 5, which might be the reason behind the directive. The order was issued under national security authorities and requires the company to suspend all access to Fable 5 and Mythos 5 by any foreign national, whether they are inside or outside the United States. The restriction also applies to foreign national employees working at Anthropic. As a result, the company has disabled both models for all customers to ensure compliance. Access to previous Anthropic models like Opus and Sonnet is not affected by this government order. The company highlighted that it had developed strong safeguards to reduce the possibility that Fable is misused for tasks related to cybersecurity. In fact, many developers are complaining that the safeguards are going overboard. Additionally, the company worked with the US government, the UK AISI, multiple private third-party organizations, and internal teams to red-team Fable’s safeguards for thousands of hours. Finally, Anthropic noted that no testers have yet been able to find a universal jailbreak on Fable 5. As expected, Anthropic disagrees that a narrow potential jailbreak should lead to the recall of a commercial model used by hundreds of millions of people. It warned that applying this standard across the AI industry could effectively halt new frontier model deployments. Anthropic concluded by mentioning that it is working to restore access to Fable 5 and Mythos 5 as soon as possible and plans to share more details within the next 24 hours.
    • Brave Browser 1.91.172 is out.
    • Any Video Converter Free 9.2.3 by Razvan Serea Any Video Converter is an All-in-One video converting tool with an easy-to-use graphical interface, fast converting speed and excellent video quality. Any Video Converter supports all popular video formats and converts your videos to different video formats including MP4, MOV, MKV, M2TS, M4V, MPEG, AVI, WMV, ASF, OGV, WEBM, and more. It supports converting videos to customized percent (50%, 100%, 200%, and more) or resolution (480p, 720p, 1080p, 4K, and more); It supports encoding videos into x264, x265, h263p, xvid, mpeg, wmv, and more. Any Video Converter Free key features: Compatible with Windows 11/10/8.1/8/7 (32-64bit) User interface are available in 14 languages Convert all kinds of video formats including high-definition videos Extract audio from any videos and save as MP3/WMA for your mp3 player Take snapshot from any videos and build your own picture collection Support high-definition for both input and output Batch add videos from hard drive and batch convert Customize output parameters completely as you like Manage your output videos files by group or output profile Merge several video files into a single and long one Clip a video into segments Free Audio Filter: Adjust audio volume and add audio effects Crop frame size to remove black bars and retain what you want only Adjust the brightness, contrast, saturation Rotate or flip or add noise/sharpen effects Produce output video with subtitles of your own dialogue and much, much more... Any Video Converter Free 9.2.3 changelog: Fixed video download engine auto-update failures. Added custom speed control support in the speed change tool. Added support for downloading YouTube AI-generated subtitles. Added support for preserving original audio stream in the format convert tool (e.g., Dolby Atmos, DTS:X). Fixed other bugs and improved overall performance. Download: Any Video Converter Free 9.2.3 | 7.6 MB (Freeware) View: Any Video Converter Free Home Page | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • Not sure what country you’re in but in many countries you can absolutely jail the sellers behind businesses… in fact I’d say in most countries you can do that
    • I guess we are done since you refuse to read my comment you replied to or my other comment in another thread you were also a part of here.
  • Recent Achievements

    • Contributor
      MarkHughes4096 went up a rank
      Contributor
    • Dedicated
      jordanspringer earned a badge
      Dedicated
    • Rookie
      Rimplesnort went up a rank
      Rookie
    • One Year In
      Markus94287 earned a badge
      One Year In
    • One Month Later
      Markus94287 earned a badge
      One Month Later
  • Popular Contributors

    1. 1
      +primortal
      499
    2. 2
      +Edouard
      173
    3. 3
      PsYcHoKiLLa
      153
    4. 4
      ATLien_0
      92
    5. 5
      Steven P.
      79
  • Tell a friend

    Love Neowin? Tell a friend!