Logitech MX Master 3 - change order for devices..


Recommended Posts

Hi all, nice to see everything is going well here.

I have a short and probably easy question for mx owners.. As you know you have the option to switch from one device-to-another by simply clicking that special button (below). The ideea is nice but I want it this way :

1 - PC

2 - Laptop

3 - Ipad

 

Right now.. Ipad -1 ; Laptop - 2 and PC -3 . How can I change the mapping? Haven't found anything in their software.

Thanks a lot.

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

Edited by Cosmin
29 minutes ago, Cosmin said:

Worked..thanks. Wonder if posibile to invert direction for scroll from ipados. Or maybe install  their software if available for ipados. 

Noticed also that : on bluetooth devices (ipad & laptop) the connection was easily done.. but on pc with the logitech receiver refuses to connect even I set on mouse to blink on 1. 😔

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

  • Like 2
7 minutes ago, adrynalyne said:

You might need to use the unifying software to change slots for the receiver. Not sure on that one. 

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

3 minutes ago, Matthew S. said:

Also if you want the "virtual" dual screen set up you need to install the Logi Options software and configure flow on both your Laptop and Desktop, I have it set up with my iMac and PC since their on the same desk and use slot 3 for my work laptop (manually have to switch since the logi options software isn't approved...).

 

MX Master 3 Manual

I’ve never been able to get that working. 😕

5 minutes ago, adrynalyne said:

I’ve never been able to get that working. 😕

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

6 minutes ago, Cosmin said:

Hopefully I don't need the flow-feature for it.. and I have to specify that I own the normal version of MX 3, not the mac one.

The sad part is that I've read that on ipad invert-scroll direction is not possible. For W10 I've did it from their software.. I wonder how you're actually feeling with scroll inversed..

Doesn't matter which version you own, they're actually the same and can pair with the same devices, the only difference with the Mac one is it doesn't come with the Unifying receiver, the usb dongle)  Also my scroll is set up normal. and I don't use it with an iPad (actually dont own a modern ipad, my ipad is an iPad 2 and no longer used).

 

For your scrolling issue, try going into the Settings app -> General -> Mouse and Trackpad and turn off Natural Scrolling

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

4 minutes ago, Cosmin said:

I've also found on google some words related to.. AssistiveTouch. I'll try your method first anyway.

It's very sad that logitech is not focusing as much as it's normal on ipados14.

 

If you're using it on a mac then you have the logitech software dedicated and that's no problem.

Has nothing to do with Logitech, that affects all bluetooth mice brands lol.

 

Scroll direction is controlled by the OS, not the driver/hardware vendor.  Logitech may put it in a more convenient place, but I can use their mice without the software (as I do on my work laptop and with bluetooth at that, which is technically an unsupported config with logitech mice and windows).

28 minutes ago, Matthew S. said:

They have to be on the same vlan/subnet and if your running hyperv on your desktop... can't use bridge mode for the vswitch... (unless you have dual nics, which i do but dont have hooked up...)

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Just now, adrynalyne said:

They were, but I didn’t know about the hyper-v gotcha. I’ve changed my setup since, so it makes less sense to use it that way but yeah...it was irritating. 

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

2 minutes ago, Matthew S. said:

Yea discovered that real quick cause I set it up before I enabled Hyper-V and went "WTF" when I couldn't swoosh over to my iMac anymore and realized the only thing I changed was added a vswitch that bridged to my network card, disabled that and went back to normal... but can't access my vm's outside the host... gotta get up off my ass and run that second cable...

I wonder if my g915 can use Flow, I had an MX keys last I tried. I have dual NICs as well. 

I don't think G series products support it since it's built into the logitech options software and not the g hub.

 

Also I just ran a cable, can confirm that it works when you have one dedicated nic to the host machine and one dedicated to the vm network :)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Camtasia 2026.1.3 by Razvan Serea TechSmith Camtasia is the complete professional solution for high-quality screen recording, video editing and sharing. Camtasia 2026 makes editing your videos easier, and faster than ever. The new editor is packed with enhanced video processing, all-new production technology, an innovative library, and stock videos and other creative assets to help you create more polished, professional videos. No video experience needed. Anyone can create informative, engaging videos. Create professional, eye-catching videos: Add special video effects - Apply Behaviors that are perfectly designed to animate your text, images, or icons. Get a crisp, polished look without being a professional video editor. Drag-and-drop your edits - What you see is what you get. Every effect and element in your video can be dropped and edited directly in the preview window. And you can edit at resolutions up to beautiful 4K, for clear video at any size. Get exceptional performance - Camtasia takes full advantage of your computer’s processor with 64-bit performance. You’ll get fast rendering times and enhanced stability—even on your most complex projects. Camtasia 2026.1.3 changelog: Feature Updates Improved keyboard navigability in tool panels. Improved screen reader accessibility of headings in Preferences. Tool panels can now be resized using a keyboard-navigable control. Updated color of folder icon in User Library tab for better visibility. Grouped media now render a composite waveform considering all audio media within that group. Added Long Path Aware to the manifest of Editor and Recorder. Performance Improvements Improved performance for editing groups on the timeline. Improved the project loading performance when timeline has lots of trec media with cursor data. Updates for IT Administrators Updated cpp-httplib from 0.38.0 to 0.43.3. Updated expat from 2.7.4 to 2.8.0. Updated freetype from 2.13.3 to 2.14.3. Updated harfbuzz from 13.0.1 to 14.2.0. Updated libpng16 from 1.6.55 to 1.6.58. Updated pango from 1.57.0 to 1.57.1. Updated girepository from 2.86.3 to 2.88.0. Updated pcre2-posix from 10.47.0 to 12.0.2. Added new harfbuzz-gpu.dll. Updated FFmpeg from 7.1.1 to 7.1.2. Updated aom from 3.11.0 to 3.13.1. Updated dav1d from 1.5.0 to 1.5.1. Updated ogg from 1.3.5 to 1.3.6. Updated SDL2 from 2.32.4 to 2.32.10. Updated zlib from 1.3.1 to 1.3.2. Updated Nalpeiron binaries to version 4.4.69.3. Bug Fixes Fixed an issue which prevented some user submitted crash reports from being sent. Fixed a potential memory leak when decoding HEVC or VP9 video. Fixed a potential crash when trying to delete a range selection on a magnetic track. Fixed a bug with the Properties Panel showing stale properties when only a caption is selected on the timeline. Fixed an issue that could prevent the Opacity and Blur properties from being changed in the Background Removal effect. Fixed an issue where larger Camtasia online projects may fail to open in Camtasia Editor. Table of contents thumbnails are no longer created for Smart Player exports with no table of contents. Fix resetting skew revert to revert just skew and not scale as well. Fixed editing in Snagit with snagX file with Unicode characters. Fixed a bug where grouped visual media could be cropped in some cases. Fixed importing SnagX files with Unicode characters. Localization fixes. Download: Camtasia 2026.1.3 | 309.0 MB (Shareware) View: Camtasia Homepage | Tutorials | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • yeah it seems to be Edge only. The dialog buttons work as expected in Chrome and Firefox. The phone is using Android 16 (OneUI 8.5) and Edge version  149.0.4022.53
    • I'm not aware of this issue, but to help the other guys.  What version of Android are you using? Did you try a different browser? To see if Edge is the issue here.
    • I agree when are you going to read this (really poor BTW) article? Here is a better article so you actually know what is going on and answers questions you had in other comments --> https://arstechnica.com/gadgets/2026/05/speed-boosting-low-latency-profile-is-one-of-the-improvements-coming-to-windows-11/ It is unclear if one will be able to disable the new profile at this point but I am not seeing any reason why one would.
  • Recent Achievements

    • One Month Later
      Jamswaz earned a badge
      One Month Later
    • Week One Done
      Jamswaz earned a badge
      Week One Done
    • Rookie
      Marzoid went up a rank
      Rookie
    • Community Regular
      coch went up a rank
      Community Regular
    • One Year In
      slackerzz earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      512
    2. 2
      PsYcHoKiLLa
      188
    3. 3
      +Edouard
      157
    4. 4
      Steven P.
      83
    5. 5
      ATLien_0
      75
  • Tell a friend

    Love Neowin? Tell a friend!