Updates will be here now.

Life support seems to be progressing....

Space News....

Bigelow Tests Life Support System

WASHINGTON ? Bigelow Aerospace completed an initial closed-loop test in March of a prototype environmental control and life support (ECLS) system designed to support extended crew stays inside the inflatable habitats the company is building to provide research facilities and hotel accommodations in space.

The March 31 demonstration was conducted inside the company?s North Las Vegas headquarters in a newly constructed test chamber, according to Eric Haakonstad, Bigelow Aerospace chief engineer. He said the test involved locking three Bigelow engineers inside the 180-cubic-meter structure for about eight hours, during which they performed a variety of tasks that demonstrated the ECLS system?s ability to control temperature, humidity, pressure, oxygen content and the removal of carbon dioxide and trace-gas contaminants from the environment.

>

Haakonstad said the initial checkout of the test facility is the first of many demos planned over the next year to simulate and test ECLS systems in support of long-duration crew stays in orbit. He said within the next couple of months Bigelow Aerospace plans to conduct a 30-hour demonstration of the ECLS system followed by another lasting up to a week.

He said both the ECLS system and its test chamber were built in-house, giving the company more control over system development.

>

Haakonstad said Bigelow?s ECLS design incorporates lessons learned from systems used aboard platforms including the international space station, the Mir space station, the space shuttle and, to a lesser extent, the Orion crew capsule currently under development by NASA.

?We?re not reinventing the wheel here,? Haakonstad said. ?All we?re trying to do is take the technology development that our tax dollars through NASA have developed and package them into a more producible form factor. We?re not trying to be cutting edge in terms of technology; we are trying to be cutting edge in terms of affordability and availability and ruggedness.?

However, unlike ECLS systems designed for short-term trips between Earth and the space station, Bigelow?s ECLS system is designed to support long-duration missions on orbit.

>

  • 2 weeks later...

To be totally honest I'd be more excited if they turned the idea of the inflatable station into a moon base or something awesome like that; if you made a facility huge enough on the moon it should be self sustainable. Are there any plans of using the idea on a moon base?

Absolutely!! Bigelow has a whole set of patents for a landable base complex to be assembled at EML-1, a gravitational equilibrium point between Earth & Moon that's a perfect place for space docks, fuel depots etc. More Bigeliw info & pics in this thread -

https://www.neowin.net/forum/topic/979120-bigelow-aerospace-long-term/

SatNews....

Robert Bigelow, Founder and President of Bigelow Aerospace, will be the Honored Keynote Speaker at the ISDC Governors' Dinner and Gala to be held in the Davidson Center at the U.S. Space & Rocket Center in Huntsville, Alabama on May 20.

>

Mr. Bigelow will also receive the National Space Society?s Space Pioneer Award for Space Development for his efforts to advance the technology of space habitats....

>

he deserves these honors, i'd name a few characters/ships after him were i a notable sci fi writer/hollywood bigwig...

and yes, Doc has been telling us about their moon base plans for a while now. i really hope they become reality by the end of this decade.

All at Google Patents - search for "Robert T Bigelow." these are the applications.

When looking at the base remember that while the hab walls are expandable & flexible at first, they are rigid after deployment. The habs also have metal cores and bulkheads at either end, making the whole structure very strong. Docking them to the solid metal hub/propulsion buses, which use the same attachment used at ISS, makes for a very solid structure.

Basic satellite bus (habitat)....

Impact shield....

Landable base....

Emergency safe haven....

Biomass disposal....

Bigelow has estimated each BA-330 module would cost ~$100M. As to the cost of the propulsion bus/hubs - that's pure guesswork, but guess high at the same as a module and you have a (probably high) cost of ~$1B for the base plus launch costs of $125M per Falcon Heavy which could well do two-fer launches.

Now consider that NASA spent ~$40B on the Constellation program over the last 6 years and have nothing to show but a cancelled program and an Orion spacecraft that may never fly, especially if Dragon works as advertised.

jesus, we could have had an entire city up there now for 40 billion...what were they thinking? or is this the true, ugly face of corruption? thanks for the figures, that's quite economical, really. i have no idea why we're not doing it then. you want to tell me we could go to Mars and establish an outpost there for like $20 billion or so? and we're still not doing it?

If we had used $0.02 worth of common sense we could have been on Mars 20+ years ago. More numbers for you -

US cost of ISS: $100 billion

2x larger volume than ISS Bigelow station: less than $1 billion

Shuttle flights: $1.5 billion, each

Falcon 9 flights: $56 million

Cost of Dragon fligyr: $133 million

Falcon Heavy flights : $80 - $125 million (2x the cargo of shuttle)

and a few examples of what $600 million pays for -

Ares I-X test flight: not light hardware. It only tested the shape & failed

Launch tower for Ares 1-X

What Congress spent on Constellation after it was cancelled

TOTAL development cost of Dragon & Falcon 9

They don't, other than blaming previous administrators, Congress/s, presidents etc. etc. etc. going back 40+ years.

Fact is a lot of things contributed including not being willing to try the new - especially if it meant a congressman/senator's district losing an existing contract. This is why Congress is demanding a Shuttle-derived heavy launcher instead of opening it up to competition - ATK (the makers of the shuttle's solids), the NASA centers that would be involved and such are in the districts of very influential representatives. Some of it was just bad decision making.

this is the truth i always try to lie to myself about, thanks for reminding me of the reality of things. progress is at the mercy of idiots and short sighted con artists. i really hope this will change soon. i hope it will be realized by all that there's endless wealth to be made from space exploration, and then greed will take us forward. i know, sounds evil, but then it took just that to get humans to pretty much do anything of any material value ever since we left the African veldt all those many millennia ago...

  • 2 weeks later...

ISDC = International Space Development Conference at the Von Braun Center in Huntsville, Alabama (near a NASA center)

These are the slides from their presentation -

http://images.spaceref.com/news/2011/isdc.bigelow.pdf

Their new 180,000 sq/ft factory is almost finished, and they've reduced the launch mass og the huge BA-2100, now known as Olympus, to 65 metric tons from the originally quoted 100 metric tons. This puts it wjthin the margins of a Falcon Heavy with a Raptor (hydrogen) 2nd stage or NASA's proposed SLS system.

Also interesting is their concept for NASA's Plymouth Rock asteroid mission; a BA-330 as the hab, a crew return vehicle and one of their big hub/propulsion modules for a crew of 4. Nice....

  • 2 weeks later...

Bigelow Aerospace space station factory update June 6, 2011

180,000 sq/ft just outside of Las Vegas for the construction of BA-Sundancer, BA-330, BA-Olympus, docking nodes, 2 sizes of propulsion buses, and the integration of life support, maneuvering, avionics and other subsystems. First launch manifested is for a BA-Sundancer in 2014 atop a SpaceX Falcon 9.

Current ->> new construction, which is a full 700' long

Bigelow-Map.gif

img20110606-007.jpg

img20110606-014.jpg

img20110606-006.jpg

img20110606-018.jpg

img20110606-023.jpg

img20110606-025.jpg

img20110606-027.jpg

img20110606-015.jpg

Here's another number for you; this 180,000 sq ft exapasion will take their total up to 370,000 sq ft

This includes offices, R&D, factory space, testing, vehicle integration and a large mission control center, which they had to build early because of having 2 Genesis modules already in orbit as testbeds. Yup, like SpaceX they're already flying.

Mission Control

mission-control-last.jpg

missions-control-first.jpg

mission-control.jpg

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Microsoft confirms Recycle Bin bug across all versions of Windows by Usama Jawad A couple of days ago, we reported that the latest Patch Tuesday update has seemingly resulted in a lot of issues for many users, including OneDrive and Dropbox access problems, BitLocker recovery lockouts, and BSODs. Although Microsoft is yet to acknowledge these bugs, it has confirmed another, relatively smaller issue across all supported versions of Windows. In an update on its Windows Release Health Dashboard, Microsoft has confirmed that after installing June's Patch Tuesday update (KB5094126), you'll experience unexpected behavior when leveraging Recycle Bin. Basically, when you attempt to delete an item from the Recycle Bin, the confirm dialog will show you the internal file name of that content rather than the actual name. For example, the file may be named abc.png, but the confirm dialog will ask if you're sure that you want to permanently delete $Rxxxxx.png from the Recycle Bin. This is pretty much it for the scope of the bug itself; it just displays the wrong name in the confirm dialog. The correct name will be shown in the list view of the Recycle Bin and if you restore the file, it will return with the correct name as well. This issue affects pretty much all supported versions of Windows client and server, including: Client: Windows 11, version 26H1; Windows 11, version 25H2; Windows 11, version 24H2; Windows 11, version 23H2; Windows 10, version 22H2; Windows 10 Enterprise LTSC 2021; Windows 10 Enterprise LTSC 2019; Windows 10 Enterprise LTSB 2016 Server: Windows Server 2025; Windows Server 2022; Windows Server 2019; Windows Server 2016; Windows Server 2012 R2; Windows Server 2012 As things currently stand, Microsoft is working on a concrete solution that will be released in a "future" Windows update. It remains to be seen if the firm will wait till the next Patch Tuesday or roll out an out-of-band (OOB) fix. The good news is that commercial customers can deploy a workaround right now, but they will have to reach out to Microsoft Support for Business for additional details.
    • They said by this time everyone will have flying cars. WELL...
    • A study by physicist Henry Tye of Cornell University suggests that the universe may not expand forever. Instead, it could eventually stop expanding, begin contracting and end in a "Big Crunch" roughly 20 billion years from now. Maybe not as we now know that time can flow backwards.
    • Of course. Simply reverse the polarity.
    • It is clear from this aricle that "Time Is On My Side" no matter which direction it is flowing., https://noai.duckduckgo.com/?i...m%2Fwatch%3Fv%3DsEj8lUx0gwY
  • Recent Achievements

    • Reacting Well
      BizSAR earned a badge
      Reacting Well
    • First Post
      AndreaB earned a badge
      First Post
    • Week One Done
      Huge Trailer earned a badge
      Week One Done
    • Week One Done
      Classifyskilleducation earned a badge
      Week One Done
    • One Month Later
      eurospharma62 earned a badge
      One Month Later
  • Popular Contributors

    1. 1
      +primortal
      577
    2. 2
      +Edouard
      183
    3. 3
      PsYcHoKiLLa
      75
    4. 4
      Michael Scrip
      72
    5. 5
      neufuse
      64
  • Tell a friend

    Love Neowin? Tell a friend!