Recommended Posts

Consolidating SpaceX news into one thread.

This update is significant in that after celebrating their CCDev 2 selection they dropped a bombshell: the Dragon spacecrafts propulsive landing system will eventually be capable of landing on other planets. Wow....a crew ship and a lander - shades of the DC-X.

Latest update....

SPACEX WINS NASA CONTRACT TO COMPLETE DEVELOPMENT OF SUCCESSOR TO THE SPACE SHUTTLE

First Astronaut Mission Expected in Three Years

WASHINGTON ? NASA has awarded Space Exploration Technologies (SpaceX) $75 million to develop a revolutionary launch escape system that will enable the company?s Dragon spacecraft to carry astronauts. The Congressionally mandated award is part of the agency?s Commercial Crew Development (CCDev) initiative that started in 2009 to help private companies mature concepts and technologies for human spaceflight.

?This award will accelerate our efforts to develop the next-generation rockets and spacecraft for human transportation,? said Elon Musk, SpaceX CEO and Chief Designer. ?With NASA?s support, SpaceX will be ready to fly its first manned mission in 2014.?

Musk said the flight-proven Falcon 9 launch vehicle and Dragon spacecraft represent the safest and fastest path to American crew transportation capability. With their historic successful flight on December 8th, 2010, many Falcon 9 and Dragon components that are needed to transport humans to low-Earth orbit have already been demonstrated in flight. Both vehicles were designed from the outset to fly people.

The announcement comes at a time when the United States has a critical need for American commercial human spaceflight. After the Space Shuttle retires in a few months, NASA will be totally dependent on the Russian Soyuz to ferry astronauts to and from the International Space Station (ISS) at a cost of more than $753 million a year ? about $63 million per seat.

Musk said Dragon ? designed to carry seven astronauts at a time to the space station at a cost of $20 million a seat ? offers a far better deal for the U.S. taxpayer. While considerable flight testing remains, the critical-path technology Dragon needs for carrying humans to orbit is the launch escape system.

New Launch Abort System

SpaceX?s integrated escape system will be superior to traditional solid rocket tractor escape towers used by other vehicles in the past. Due to their extreme weight, tractor systems must be jettisoned within minutes of liftoff, but the SpaceX innovative design builds the escape engines into the side walls of Dragon, eliminating the danger of releasing a heavy solid rocket escape tower after launch.

The SpaceX design also provides crew with emergency escape capability throughout the entire flight, whereas the Space Shuttle has no escape system and even the Apollo moon program allowed escape only during the first few minutes of flight. The result is that astronauts flying on Dragon will be considerably safer.

Furthermore, the integrated escape system returns with the spacecraft, allowing for easy reuse and radical reductions in the cost of space transport. Over time, the same escape thrusters will also provide the capability for Dragon to land almost anywhere on Earth or another planet with pinpoint accuracy, overcoming the limitation of a winged architecture that works only in Earth?s atmosphere.

Under the award, SpaceX will modify Dragon to accommodate crew, with specific hardware milestones that will provide NASA with regular, demonstrated progress including:

Static fire testing of the launch escape system engines

Initial design of abort engine and crew accommodations

Prototype evaluations by NASA crew for seats, control panels and cabin

The December 8th, 2010, demonstration flight of Falcon 9 and Dragon was the first flight under NASA?s Commercial Orbital Transportation Services (COTS) program, which was initiated to develop commercial cargo services to the International Space Station. After the Space Shuttle retires, SpaceX will fly at least 12 missions to carry cargo to and from the International Space Station as part of the Commercial Resupply Services (CRS) contract for NASA.

>

dragon_in-space-12-10.jpg

Link to comment
https://www.neowin.net/forum/topic/991330-spacex-updates-grasshopper-rlv/
Share on other sites

Latest SpaceX brochure shows Falcon 9 getting the Falcon Heavy's core stretch (and presumably Merlin 1D) and an tncrease to LEO from 10.4 mT to 16 mT. Guess that's why it's in the running for the 13.5 mT CST-100.

http://www.spacex.com/downloads/spacex-brochure.pdf

There was a 90 second (1/2 mission length) Falcon 9 test fire at SpaceX's McGregor, Texas test facility. The following is from the local KWTX-TV stations comments thread -

Posted by: **** Location: Texas on Apr 20, 2011

We live 30 miles away and saw it out the window. Thought it was a nuke! Then a minute later felt the rumble and heard the roar. Good grief! How do those that live closer stand it.

'nuff said ;)

Word is leaking that the next 2 Dragon test flights for NASA's COTS program, C2 and C3, will be blended into a single mission, docking at the next launch and accelerating Dragon's availability to resupply the ISS. If so it means work on crew Dragon can accelerate as cargo Dragon exits development and becomes operational.

Previously C2 was to be this summer and C2 around February 2012, but the blended mission could go in October 2011. The delay from summer to October is so NASA can reset itself and train the current ISS crew to do a mission the next crew was supposed to do.

SpaceX looks to be getting the most out of their CCDev2 money -

'Ya gotta admit - these guys have big, round, brass ones.

The Dragon's side-mount launch abort system will be designed and built to the point of a full-duration engine firing on the ground by next May..

Which would be May, 2012. The propulsive launch escape/landing system would also allow it to land on other bodies than Earth, the Moon or Mars (this weeks Wall Street Journal interview.)

Animation of how it'll work -

The SpaceX CCDev 2 contract has milestones they have to meet to get each parcel of the money for the abort system and other crew items. They also have the blended COTS flight (C2 + C3) for ISS cargo missions coming up.

C2/C3 is slated for October-ish. When it flies they do the required C2 simulated docing maneuvers a few kilometers from ISS, then if all goes well C3 kicks in and Dragon docks at ISS on the American end and delivers a cargo load.

The first CCDev milestones have to be met by April 12, 2012. These include a ground test of the abort/manding engines, tanks, controls etc. Most informed observers believe most of this has been in development for some time and these tests could well be done earlier - perhaps the end of the year.

Once the CCDev 2 goals have been met by all participants, or the laggards drop out or are "fired", the CCDev 3 contracts will be offered. CCDev 3 would involve manned flights to the ISS.

Also, SpaceX posted a new Crew Draon promo showing more footage of Dragon doing a propulsive landing - and it isn't on Earth or the Moon :)

nice photos! and i like the fact that they're comparing the US to China, competition is a huge motivator obviously. China's not exactly excelling in space, though, they're spending all their money on terrestrial concerns at the moment. i still hope they'll be able to proceed with their manned moon missions for later this decade, which will ultimately beg the issue of combining forces and doing a joint, much bigger mission. but yeah, all this SpaceX activity is really good for the economy of those states. i'd love to drive by one of the rockets on the interstate, they'd get a salute for sure!

I didn't take those and it was an engineering test Dragon, not flight hardware. Still, one helluva thing to see on the freeway :)

Spaceplanes have only one non-cosmetic advantage in orbital ops: a large cross-range capability, meaning they can glide to a landing up to a few hundred km either side of the orbital track, and because of its flying brick shape and huge mass the shuttle couldn't even do that very well.

This might make sense for a space ambulance or station evacuatiin vehicle that could land on any airport near a medical center, but otherwise....

In all other aspects of spafeflight; crago mass as a % of launch mass, volume/mass etc. spaceplanes operate at a severe disadvantage to capsules.

Remember your science 101: the shape with the greatest volumetric efficiency (internal volume divided by surface area) is a sphere, and capsules are closer to spherical than winged flying bricks. Dragon & Soyuz have the highest volumetric efficiency of todays capsules (CST-100 & Orion are more conical).

In beyond Earth orbit space, of which Dragon, Soyuz and Oriion are capable, wings are dead weight, their mass better used to increase cargo capability, and there isn't a spaceplane design that could handle those re-entry velocities.

heh heh i thought you took those pics. and good to know it wasn't the actual ship, uncovered would have been bad...

i know you're not a big fan of spaceplanes Doc, but as you see the popular opinion is indeed in their favor. your explanations only have scientific grounding because we've been reluctant to do the right thing...for the billions we've spent on crap hardware that hasn't flown yet we could have indeed built the Valkyrie shuttle from Avatar...for real.

Looks like the decision point for combining the Dragon C2 test flight and the C3 ISS mission is late June, and if C2+C3 is approved it'll be in the latter half of November. The main issue seems to be a relatively minor problem with the S-Band (2-2.5ghz) Omni comm gears power flux density.

Clearer shot of the test Dragon on the road - gives some scale, though it's minus the trunk/service module.

dragonontheroadzoom.jpg

Just for fun -

DragonMarsLanding.jpg

Expanding a bit, the issue woth power flux density is asafety one vs. humans in the gears output beam. Basically, too high a PFD is bad. PFD is a function of distance from the transmitter, so (IIRC) -

PFD® = kW*Gt/(4*PI*r^2)

when kW is isotropic radiated power, Gt is transmitter gain and r is meters. The result is in kw/m^2

But power at distance isn't the only standard. Basic standards come down to the direction of the max signal strength, its polarization, frequency & strength of the ambients, and the duty cycle.

SpaceX Names Bret Johnsen as Chief Financial Officer

Former Broadcom Executive Joins Company at a Time of Incredible Growth

Hawthorne, CA ? Space Exploration Technologies (SpaceX) has named Bret Johnsen as Chief Financial Officer, bringing 20 years of financial leadership experience in high-profile, publicly traded companies to SpaceX as it undergoes rapid growth on the back of tremendous technological and market success.

Johnsen's appointment follows the company?s fourth straight year of profitability (2007-2010). The total value of SpaceX NASA and commercial contracts recently topped $3 billion for over 40 launches. The company has also grown to more than 1,300 employees.

?Bret has an exceptional talent for financial management in high-growth, publicly held technology companies,? said Elon Musk, SpaceX CEO and CTO. ?Looking at his career, he is clearly someone that always sought out tough challenges and produced impressive results. His experience will be invaluable to SpaceX as we implement the financial standards and processes needed to allow for the possibility of becoming a public company.?

?I am thrilled to be part of a team that is transforming the space industry,? said Johnsen. ?It is exciting to join such a pioneering company as it continues to grow and increase market share. My job at SpaceX will be to ensure financial discipline, while supporting the formula that makes SpaceX great.?

Johnsen spent nearly a decade at Broadcom Corporation, the world?s largest manufacturer of semiconductors for wired and wireless communications. He played a key role in helping transform Broadcom into a leading Fortune 500 technology company. There he developed processes that drove operating efficiencies, saving Broadcom millions of dollars annually. Starting out as Controller for a number of business groups within Broadcom, he quickly rose up the ranks. He ultimately was named Vice President, Corporate Controller and Principal Accounting Officer, overseeing an 80-member accounting organization in nine countries for the cutting-edge technology company.

After leaving Broadcom, he served as Senior Vice President and Chief Financial Officer for Mindspeed Technologies. Last year, he was named ?CFO of the Year? by the Orange County Business Journal for bringing the chip maker through the recession by cutting costs, reworking debt, selling stock and raising cash through patent sales. ?The moves helped reposition Mindspeed for profitability and brought renewed attention from Wall Street,? the Journal said.

Johnsen holds a Bachelor of Science in Accounting from the University of Southern California and a Master of Science in Finance from San Diego State University. He is a certified public accountant in the State of California.

  • 2 weeks later...

NASA Admin. Gen. Charles Bolden & Princeton Astrophysicist Christopher Chyba think SpaceX is "disruptive," in the good way. Prof. Chyba also testified as much in Senate testimony....

Aviation Week...

NASA might ease its ?delicate position? by following the cost-cutting approaches used by Space Exploration Technologies Inc. (SpaceX) in developing the Falcon 9 launch vehicle, a key member of the panel that reviewed U.S. human spaceflight plans for President Barack Obama is telling Congress.

Administrator Charles Bolden apparently agrees, saying that the SpaceX approach to management is ?disruptive technology? that can bring ?great gains? to the space program.

?They don?t spread things all over the country the way that NASA and defense contractors tend to do,? Bolden told the President?s Council of Advisors on Science and Technology on May 19. ?They?re very focused in two locations in the country. They bring everything in-house. They have no subcontractors, so everything comes to them. That?s disruptive.?

As NASA struggles to restructure itself with the government in a cost-cutting mood, agency analysts have put some numbers behind Bolden?s view, notes Christopher F. Chyba, a professor of astrophysics and international affairs at Princeton University. Chyba played a key role in the 2009 deliberations of the panel headed by former Lockheed Martin CEO Norman Augustine.

Testifying before the Senate Commerce Committee on May 18, Chyba repeated his 2009 warning that NASA has never been able to develop one vehicle and fly another at the same time, and is unlikely to be able to do so today (AW&ST Aug. 3, 2009, p. 28). But he says NASA may be able to learn from SpaceX as the agency develops the heavy-lift launch vehicle Congress has ordered it to build for missions beyond low Earth orbit (LEO).

?I think one would want to understand in some detail . . . why would it be between four and 10 times more expensive for NASA to do this, especially at a time when one of the issues facing NASA is how to develop the heavy-lift launch vehicle within the budget profile that the committee has given it,? Chyba says.

>

>

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • You pay just $100 per TB with this rare 4TB PCIe Gen4 NVMe SSD deal by Sayan Sen SSDs and GPUs are incredibly hard to get nowadays due to high pricing. Discounts are quite rare which is why we report on them as soon as we spot a good deal. For example AMD's new 9070 GRE was finally up for sale at a very good price of just $500 thanks to a special coupon. Sadly that deal is gone but if you happen to be looking for a 4TB NVMe SSD and can spend around $400 there is a really good offer on sale that you should not miss out on as TeamGroup's 4TB G50 model is on sale for that that price which means you are only paying $100 per TB, a very good deal in the current market (purchase link under the specs table down below). The TeamGroup T-FORCE G50 NVMe SSD is a PCIe Gen4 drive and as such it promises to deliver sequential read speeds of up to 5,000 MB/s, helping accelerate game loading, file transfers, and everyday computing tasks. Since this is a 4TB drive you can use it for a gaming library to take advantage of things like DirectStorage. The SSD features an InnoGrit controller and SLC caching technology to support consistent performance. An ultra-thin, patented graphene heatsink is included to aid in heat dissipation. Get it at the link below: Team Group T-FORCE G50 4TB Internal SSD (TM8FFE004T0C129): $449.99 + $50 off w/ promo code SSF69668, limited offer => $39.99 (Sold and Shipped by Newegg US) Good to know This Amazon deal is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases.
    • I agree. I also think Phil stayed too long. They should definitely fire whoever thought all a console platform needed was Call of Duty, Elder Scrolls, and Fallout to survive. Asha and crew are still saying they need more Elder Scrolls and Fallout games. They simply don't get it.
    • Macbook Air is an appealing option, as are plethora of Windows devices with various different CPU's
    • Mozilla highlights Firefox Nova 2026 redesign and more upcoming features with new roadmap by Sayan Sen Last month Mozilla confirmed that Firefox was set to get a major redesign this year. Dubbed "Project Nova", it can already be tested and will roll out to all users later this year.The idea is to keep the browser competitive in a rapidly evolving internet landscape. As such the revamp focuses on improving privacy, usability, performance, accessibility, and customization. Key privacy features including the built-in VPN, private browsing mode, and Enhanced Tracking Protection, will be more visible and easier to manage, while users will have the option to disable AI features entirely through a dedicated kill switch. Additionally, the redesign promises faster page loading, the return of Compact mode, expanded personalization options, and stronger accessibility support. You can find the full details in the dedicated piece linked above. In a new blog post today the company once again reiterated on Nova and also emphasized other new and upcoming features like the settings revamp that is intended to make it easier for users to understand browser settings. In order to make it simpler for users to keep up with such features Mozilla today is launching Firefox roadmap. Hence enthusiasts and interested users will be able to check out what's cooking and also share feedback about the upcoming additions. Alongside the roadmap announcement, Mozilla also highlighted what's new in Firefox 152. One of the biggest additions is the arrival of Tab Groups on Android. The feature, which has already been helping desktop users organize large numbers of tabs, is now beginning to roll out on mobile. Users will be able to group related tabs together, assign names and colors to them, and return to them later. Mozilla says support for iOS will arrive later this year. Firefox 152 also introduces the aforementioned redesigned Settings experience. The company says the changes are meant to make controls easier to find and help users discover features they may not have previously known about. Existing preferences are not changing, though they are now better organized. Another notable addition is the new Blocked Tracker Widget, which provides a visual overview of Firefox's privacy protections by showing how many trackers have been blocked over time and the types of tracking activity the browser has stopped. Looking ahead, Mozilla revealed several upcoming roadmap features. They include customizable keyboard shortcuts, as well as enhanced PDF editing tools that will allow documents to be split, merged, and reorganized directly within Firefox. The company is also working on bringing Multi-Account Containers into the native Firefox experience thus removing the need for a separate extension. Meanwhile Firefox's built-in VPN is set to expand to mobile devices. Mozilla is also developing AI-powered features like Quick Answers, which can provide concise responses to voice queries, and Smart Window, its optional AI browsing experience that is now available without a waitlist. Finally, a new Power Saving Mode is in the works and will help reduce the impact of resource-heavy tabs on mobile devices in order to extend battery life. The video below summarizes the upcoming changes in an easy to understand format: You can find the announcement blog post here on Mozilla's official website.
  • Recent Achievements

    • One Year In
      Console General earned a badge
      One Year In
    • One Year In
      Twozo Technologies earned a badge
      One Year In
    • One Month Later
      Twozo Technologies earned a badge
      One Month Later
    • Week One Done
      Twozo Technologies earned a badge
      Week One Done
    • Veteran
      branfont went up a rank
      Veteran
  • Popular Contributors

    1. 1
      +primortal
      513
    2. 2
      +Edouard
      196
    3. 3
      PsYcHoKiLLa
      109
    4. 4
      Steven P.
      89
    5. 5
      Nick H.
      71
  • Tell a friend

    Love Neowin? Tell a friend!