XCOR background info:

XCOR Aerospace has been in the aerospace business since 1999. They're headquartered at the Mojave Spaceport just down the tarmac from Virgin Galactic and their specialty is re-usable liquid fueled rocket engines.

A big project is a joint-venture with Boeing to develop a very low cost 30,000 lb-f/30 kilo-Newton 2nd stage liquid hydrogen engine for boosters that could easily be scaled way up. They have also developed a reciprocating piston liquid hydrogen pump that could further cut booster costs by replacing the very expensive turbo-pumps currently in use. Lots of interested parties for that one.

Then there is the project that is starting to get a lot of attention, and customers for when it flies - the Lynx suborbital spaceplane. Lynx is on one hand like SpaceShipTwo, and on the other hand very different.

SS2 - Lynx comparisons:

SS2 is 60ft/18.29m long with a 27ft/8.23m wingspan.

Lynx is 30ft/9m long with a 24ft/7.5m wingspan

SS2 is launched from the White Knight Two mothership at 50,000 feet.

Lynx takes off directly from the ground, requiring a very short runway.

SS2 uses a hybrid solid/liquid engine; rubber fuel, nitrous oxide oxidizer.

Lynx uses 4 re-usable liquid rocket engines; kerosene fuel, liquid oxygen oxidizer.

SS2 carries 6 passengers and a crew of 2.

Lynx carries 0-1 passengers and a crew of 1.

SS2 passengers will pay $200,000 at first

Lynx passengers will pay about $100,000 at first

SS2 passengers will be able to de-seat and float around and look out through portholes.

Lynx passengers will have to remain seated, but the cockpit has a panoramic view.

SS2 can only fly from spaceports with a runway capable of handling White Knight Two and refurbing its hybrid engine

Lynx can fly from short runways, and the fuel/liquid oxygen handling can be done using a portable cart.

SS2 can carry internal experiments and mount external micro-satellite size payloads.

Lynx can do the same, but it can also launch small orbital satellites from a Dorsal Pod on its back, or even carry small telescopes for missions like NASA's Sophia flying telescope - but much higher.

These missions are not theoretical - they are sold missions and Lynx is very, very real!

This is for Neoadorable: they are working on a larger, orbital, Lynx-like vehicle that will also take off from a runway, but using a fly-back booster.

Pics below with appropriate labeling -

Flight profile animation

http://www.youtube.com/watch?v=IoEdEgf96YY

Lynx spaceplane

lynx-1.jpg

Lynx cutaway

Lynx-cutaway.jpg

Lynx cockpit cutaway - payloads

Lynx-cockpit.jpg

Lynx with Payload Pod

Lynx-payloadpod.jpg

Lynx launching satellite (or ??) from the Dorsal Pod

Lynx-payloadlaunch.jpg

Lynx with telescope in Dorsal Pod

Lynx-telescope.jpg

Link to comment
https://www.neowin.net/forum/topic/1014074-xcor-lynx-spaceplane-updates/
Share on other sites

thanks a lot for this Doc, you have made my day with the Lynx Mk II. this is indeed a step in the right direction, so we can prove to you that the future is indeed the Valkyrie rather than your beloved rockets :laugh: thanks also for the highlight and personal shout-out, very much appreciated. please do keep us informed on these guys, i even love the winking lynx logo, very awesome, and looks like they have the right idea. i just hope they have the funding and resources to make it real in the next few years.

Few years? The first bird is under construction, the engines are done and test flights are scheduled for late 2011 through early 2012. Commercial ops should start in late 2012.

Other news -

Lynx to fly Planetary Science Institute (PSI) Atsa telescope....

Lynx to fly 8 Southwest Research Institute (SwRI) missions....

http://www.swri.org/

XCOR selects world-wide payload integrators....

http://www.psi.edu/

>

The first group of XCOR Lynx payload integration specialist firms include the following (in alphabetical order): the African Space Institute of Durban, South Africa; Cosmica Spacelines of Toulouse, France; NanoRacks of Lexington, Kentucky and Washington, D.C.; the Southwest Research Institute (SwRI) in Boulder, Colorado; Space Chariots in Oxon, England; Space Experience Cura?ao of the Netherlands and the Caribbean island of Cura?ao; Spaceflight Services in Tukwila, Washington, Valencia, California, and Huntsville, Alabama; and Yecheon Astro Space Center, Yecheon, South Korea.

Dr. Alan Stern, Associate Vice President at SwRI, the former NASA Associate Administrator for Science and the Chairman of the Commercial Spaceflight Federation's Suborbital Researchers Group, said, "We are extremely excited about the capabilities that Lynx will bring to our many research clients at SwRI, so much so that we've already procured six flights for our own pathfinder and discovery missions to better understand how we can best serve our clients. As a trained researcher and test engineer, I can't wait to fly with my experiments on Lynx and ring out the processes and procedures that will help our clients succeed, and help our Institute stay at the forefront of the 21st century."

>

as usual you are right...XCOR builds an SSTO that can lift 1200 pounds now, proves it works for a few years, then we go up to several tons...then a couple decades later we got a proper SSTO. thanks as always for the reality check!

skydiving seems so yesterday compared to sub orbital flights lol

Few years? The first bird is under construction, the engines are done and test flights are scheduled for late 2011 through early 2012. Commercial ops should start in late 2012.

* adds sub orbital flights to - to do before i die list

  • 5 months later...

XCOR is finally done designing and getting a bird ready to fly later this year.

Flight Global....

reveals Lynx test schedule

?

Spacecraft designer Xcor has revealed details of a plan to achieve first flight of the Lynx Mk1 later this year and to expand the suborbital market far beyond space tourism.

First flight for the Lynx already has been delayed by two years after XCor discovered a deep stall problem with the original Lynx design. That issue has now been overcome through design changes to the wing, allowing Xcor to begin final assembly within a few weeks.

The first major piece of structure - the fuselage of the Mk1 version -- will be delivered to Xcor the week of 16 January, said Andrew Nelson, chief operating officer and vice president of business development.

Next month, Xcor will tender work packages for building the cockpit pressure vessel and strakes in February, with delivery of the two subassemblies scheduled in April in May, said Khaki Rodway McKee, the Xcor programme manager.

Roll-out of the Mk1 is scheduled in July or August from Xcor's hangar in Mojave, California, she said.

Taxi tests are scheduled to begin in October or November, which will be quickly followed by a short hop and finally a brief first flight by the end of the year.

The Lynx Mk1 design will be limited to flight tests. For commercial operations, Xcor will roll-out a Mk2 version about nine months later with two major changes. The Mk2 aeroshell will be made with different material that is easier to maintain in the field. Secondly, the metallic liquid oxygen fuel tanks on the Mk1 will be replaced by a non-flammable composite material, McKee said.

Finally, a Mk3 version of the Lynx is still being designed. It will introduce a 3.4m-long, circular payload pay mounted on top of the fuselage. The added feature will allow the Lynx to launch satellites weighing up to 650kg into low-earth orbit.

Xcor has discovered the Mk3 will require more extensive design changes than first thought. The landing gear must be strengthened and aerodynamic effects may drive the designers to make tweaks to the outer mould line, Nelson said.

As first flight approaches, Xcor also has released a detailed market projection for its new product. Company officials are seeking to break the popular notion that suborbital spaceflight is aimed solely at the space tourism market.

Tourism will account for less than 10% of the roughly $6 billion "addressable market" Xcor anticipates for the Lynx by 2015, when the company envisions a growing fleet launching into space several times a day.

Another $1.1 billion in yearly sales is projected for launching payloads, as well as $1.4 billion in revenue for launching small satellites. Xcor also projects a $2.8 billion market for vehicle and equipment sales to third parties, including the possibility of selling the rocket engine to the United Launch Alliance as a replacement for the Pratt & Whitney RL10.

(RL-10 is an old reliable upper stage engine that needs updating. XCOR has experience with innovative rocket engines designed for high reliability - and they have lots of ?experience with methane fueled engines, which could be very, very useful for fuel depots and Mars)

  • 1 month later...

Link....

XCOR Aerospace Closes $5 Million Round of Investment Capital

XCOR Aerospace reports that it recently closed a $5 million round of equity funding. The round, combined with cash on hand plus anticipated and existing contracts should fund the company through production of its Lynx Mark I Suborbital vehicle.

The financing included participation of new and previous investors. Among them are Esther Dyson, Pete Ricketts (co-owner of the Chicago Cubs) and several top Silicon Valley entrepreneurs and former venture capitalists.

"We have chosen to announce this wonderful news at the Next Generation Suborbital Researchers Conference here in Silicon Valley because we believe the future of commercial space access will be driven by enterprise customers like the attendees here [today]," said Andrew Nelson, XCOR's Chief Operating Officer.

He added, "This investment represents a vote of trust and confidence in the markets represented by NSRC participants."

Jeff Greason, Founder and CEO of XCOR noted, "I believe we were able to raise funds in these trying economic times because XCOR has demonstrated compelling value to investors and customers. Our $60-plus Million backlog of orders for Lynx suborbital vehicles, flights on Lynx, and our unique reusable non-toxic rocket engines gives the investor community reason to take notice."

As part of this financing, XCOR is also happy to announce a reformulated Board of Directors. The directors include newcomer Esther Dyson, former venture capitalist Stephen Fleming, Chairman of the Space Studies Institute Dr. Lee Valentine, and company founders Jeff Greason and Dan DeLong.

Ms Dyson is well known for her perceptive early investments in the Internet, software and social media industries, her service on private and public corporate boards and foundations, and for leading NASA's Technology and Innovation Advisory Council.

Mr Fleming is a former general partner at the venture capital firm of ATV Partners and is now Vice President at Georgia Tech where he leads the Enterprise Innovation Institute. Dr Valentine is well known in the commercial space community for his leadership of the Space Studies Institute and his work with many early stage startup companies.

Work proceeds on the Lynx suborbital vehicle at XCOR. With the recent receipt of the Lynx Mark I fuselage, the continued testing of the liquid oxygen and kerosene propulsion system, the fielding of the non-toxic high performance bi-propellant reaction control system, and the recent release of request for quotes for the cockpit pressure vessel and wing strakes, XCOR is getting ever closer to first flight.

"While the recent and unprecedented disruptions in the capital markets have impacted every fledgling aerospace company, XCOR has weathered the storm and in 2011 we had our best year ever from a revenue and profitability perspective. And while the difficulties of the last few years have delayed the Lynx, we're excited about the challenges ahead.

"There is a lot of work and sizable risk in front of us, but XCOR continues its uncompromising commitment to safety and excellence. We remain focused on delivering our customers the coolest rocket plane on the planet," said Nelson.

  • 2 months later...

From the Spacecraft Technology Expo

- Mk. I fuselage delivered

- Planning first flight at end of 2012 or early 2013

- Mk. II has composite LOX tanks, which enables apogee increase to >100 km

- Mk. III can support external payloads, such as telescopes or nanosatellite launchers

Cockpit simulator for Lynx Mk. I -

post-347280-0-86532800-1336524986.jpg

post-347280-0-30775600-1336524996.jpg

post-347280-0-56879800-1336525016.jpg

post-347280-0-85779000-1336525025.jpg

Aviation Week....

XCOR Lynx Mark I Taking Shape In Mojave

Four years after the rocket-powered Lynx project was unveiled at the Los Angeles Convention Center, the presence here of a full-scale vehicle mockup at the Spacecraft Technology Expo reveals two fundamental truths about the ?new space? market.

Firstly, propelling a privately developed spacecraft to suborbit is extremely difficult. When it first announced the project in March 2008, XCOR Aerospace hoped to be flying within two years, yet is only now assembling the first Mark I vehicle at its Mojave, Calif., facility. The company's long journey to suborbit is partly reflected in the many detailed design differences between the mockup and the artist's concept of 2008.

Secondly, the project shows staying power while underscoring XCOR's determination and the resilience of the market. Despite the challenges and the sluggish economy, the company continues to find support and raise funds. XCOR holds more than $60 million in backlog orders and recently closed a $5 million round of equity funding from new and previous investors, including Silicon Valley entrepreneurs and well-known technology ?angel? investors such as Esther Dyson.

XCOR CEO Jeff Greason also continues to exude confidence in the project and the market as a whole. ?It took a while, but we think we're there,? he says, describing the path to Lynx. ?We've been through two generations of rocket-powered vehicles so far. Firstly, there was the EZ-Rocket between 2001 and 2005, which was aimed at pushing down the cost of rocket-powered operations. Then there was the X-Racer, between 2006 and 2008, which was all about operational tempo. We got it down to around nine minutes between flights and up to seven flights per day.?

Now, with the prospect of long-awaited suborbital flights looming in 2013, Greason says the influence of pioneering operations such as the Lynx will be greater than the sum of its parts. ?People talk about the tradeoff between robotic operations and humans?but I don't think a robot has been invented that can enjoy the spaceflight for me, or can do experiments and say, 'Mmmm . . . that looks funny to me.' So it's a game-changer in a way that will impact other uses of human spaceflight.?

Assembly of the initial vehicle is underway, with the truss structure that will support the propulsion system currently being attached to the fuselage. The structure will provide a housing for the vehicle's four XR-5K18 liquid oxygen/kerosene (LOX/RP) rocket engines. Initial tests of the LOX piston pump are about to start, paving the way for closed-loop testing of the engine using its own pump-fed fuel, rather than pressure-fed from offboard sources. XCOR has also received the LOX tank and is issuing requests for bids for the aerodynamic strakes, or fairings, which will enclose the fuel tanks between the fuselage and the wing.

The mockup at the show indicated the changes made to improve the stability and control of the final configuration, including the broader nose section and extended chine. Other changes?which were made after subsonic wind-tunnel trials in 2009 at the U.S. Air Force Research Laboratory in Dayton, Ohio, and follow-on tests at NASA Marshall Space Flight Center?included larger-chord wingtip-mounted vertical fins with extended ventral sections. A final set of wind-tunnel campaigns in both facilities is scheduled shortly to confirm minor aerodynamic changes.

XCOR_LYNX_NorrisAWST.jpg

  • 1 month later...

An interview with Jeff Greason, XCOR boss and a Burt Rutan style aeronautical genius. A lot of people would love it if he were appointed King of NASA.

In it he discusses how XCOR got started, and at the end some tidbits about their project after Lynx: a runway launch/landing 2 stage winged launcher with stages that would fly back to the launch site, and fly multiple missions a day.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Maybe it's just my old-school soul talking, but I’ve always felt that games aren't 'real' games until they hit the PC. Leaving the PC community out at launch just doesn't sit right with me. That being said, I'm probably going to buy the PS5 just for the fun of trying it out.
    • The Vibe Coding Playbook: Building Your Tech Business with AI —was $35, now FREE by Steven Parker Claim your complimentary copy (worth $35) of "The Vibe Coding Playbook: Building Your Tech Business with AI" for free, before the offer ends on June 23. Description A detailed and up-to-date walkthrough for entrepreneurs with limited (or non-existent) coding skills who want to build profitable software companies using new gen-AI tools. In The Vibe Coding Playbook: Building Your Tech Business With AI, renowned AI and data science educator Siraj Raval walks you through exactly what you need to do to build a technology business with generative AI-powered code assistants. Raval offers step-by-step guidance for non-technical professionals and entrepreneurs interested in creating scalable, profitable enterprises without spending years learning how to code. This book conceives of new artificial intelligence tools, like Cursor, as “co-founders,” lighting your way to constructing valuable software products and services. You’ll learn to build minimally viable products (MVPs), iterate on your software products as you develop and after launch, and grow your company while maintaining a lean, efficient, solopreneur-focused structure. Inside the book: Detailed guidance for entrepreneurs interested in creating powerful tech solutions for niche problems and markets without hiring expensive software developers Strategies for using generative AI tools to substitute for traditional technical co-founders Illustrative case studies from real-world founders who built successful technology businesses without learning to code Useful tools for non-technical entrepreneurs, including prompt libraries, decision trees, QR codes linking to video tutorials demonstrating key techniques, and access to an exclusive online community of like-minded founders Perfect for ambitious professionals and entrepreneurs who want to build a successful technology company now – using commercially available AI tools – The Vibe Coding Playbook is your personal roadmap to creating useful and profitable software for customers without learning how to code. How to download for free Please ensure you read the terms and conditions to claim this offer. Complete and verifiable information is required in order to receive this free offer. If you have previously made use of these offers, you will not need to re-register. Was $35, but is now FREE | Below free offer link expires on June 23. The Vibe Coding Playbook: Building Your Tech Business with AI The below offers are also available for free in exchange for your (work) email: The Vibe Coding Playbook: Building Your Tech Business with AI ($35 Value) FREE - Expires 6/23 The Persuasion Engine: How Any Business Can Use AI-Powered Neuromarketing to Understand and Win Customers ($28 Value) FREE - Expires 6/24 How to Do More with Less: Future-Proofing Yourself in an AI-driven Economy ($28 Value) FREE - Expires 6/30 Cloud Security Fundamentals: Building the Foundations for Secure Cloud Platforms ($131.95 Value) FREE - Expires 7/1 The Complete Free AI Learning: Master ChatGPT, Claude, Gemini & More ($21 Value) FREE How to Build an AI Design Workflow with Gamma ($21 Value) FREE The Ultimate Linux Newbie Guide – Featured Free content Python Notes for Professionals – Featured Free content Learn Linux in 5 Days – Featured Free content Quick Reference Guide for Cybersecurity – Featured Free content We post these because we earn commission on each lead so as not to rely solely on advertising, which many of our readers block. It all helps toward paying staff reporters, servers and hosting costs. Other ways to support Neowin The above deal not doing it for you, but still want to help? Check out the links below. Check out our partner software in the Neowin Store Buy a T-shirt at Neowin's Threadsquad Subscribe to Neowin - for $14 a year, or $28 a year for an ad-free experience Disclosure: An account at Neowin Deals is required to participate in any deals powered by our affiliate, StackCommerce. For a full description of StackCommerce's privacy guidelines, go here. Neowin benefits from shared revenue of each sale made through the branded deals site.
    • Rockstar confirms Grand Theft Auto VI pre-orders begin next week, unveils cover art by Pulasthi Ariyasinghe The release date of Grand Theft Auto VI has moved quite a lot since its original announcement in 2023, but it finally looks like the game has found its final launch slot. Rockstar today had a new video upload on its YouTube channel, and while it wasn't a new trailer for the game, the company revealed two things. This was the pre-order kickoff date for Grand Theft Auto VI as well as the game's official cover art. The company revealed that June 25 is when fans of the series will be able to pre-order their copy of Grand Theft Auto VI. Pre-orders will be available both digitally and in retail stores. The newly unveiled cover art shows off the two new protagonists, as well as a few more characters that are probably vital to the campaign storyline. Shots of vehicles players can use like a light helicopter, motorcycle, sports car, and speed boat are also seen here, alongside a shot of a crocodile. "Jason and Lucia have always known the deck is stacked against them," says Rockstar describing the campaign's protagonist duo. "But when an easy score goes wrong, they find themselves on the darkest side of the sunniest place in America, in the middle of a conspiracy stretching across the state of Leonida — forced to rely on each other more than ever if they want to make it out alive." Grand Theft Auto VI is coming to Xbox Series X|S and PlayStation 5 on November 19, 2026. A PC version has not been confirmed yet, though it's expected by many to land after the console release. When asked about this, the Take-Two CEO says it considers the core audience for the Grand Theft Auto franchise to be on consoles.
  • Recent Achievements

    • Week One Done
      Huge Trailer earned a badge
      Week One Done
    • Week One Done
      Classifyskilleducation earned a badge
      Week One Done
    • One Month Later
      eurospharma62 earned a badge
      One Month Later
    • Week One Done
      With What earned a badge
      Week One Done
    • Week One Done
      Harris Gilbert earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      553
    2. 2
      +Edouard
      168
    3. 3
      PsYcHoKiLLa
      72
    4. 4
      Michael Scrip
      64
    5. 5
      ATLien_0
      64
  • Tell a friend

    Love Neowin? Tell a friend!