Recommended Posts

I was watching the live feed this morning and got a little pale when he said he'd run into a problem when the command for the bolts to engage wouldn't respond ... I was like "oh crap" ... glad it was just him not running the procedure correctly. When they finally went (all but that last one, and he issued the command again and it went) I was like "phew!".

  • 1 month later...

HOUSTON (NASA PR) — The Bigelow Expandable Activity Module (BEAM) will be deployed to its full size Thursday, May 26, and begin its two-year technology demonstration attached to the International Space Station. 

 

NASA Television will provide coverage of the expansion beginning at 5:30 a.m. EDT.

 

Events begin Tuesday, May 24 when engineers and team members from NASA and Bigelow Aerospace answer questions about the module’s expansion during a 4 p.m. Facebook Live event and at 5 p.m. on Reddit.com. Anyone may submit questions during these events at:

https://www.facebook.com/NASA/

 

and

 

http://www.reddit.com/r/IAmA/

 

NASA astronaut Jeff Williams will lead Thursday’s operations to expand the module. Designers need daylight and video communication to closely monitor the process starting at 6:10 a.m. Thursday.

 

Space station astronauts will first enter the habitat Thursday, June 2, through the station’s Tranquility module, and re-enter the module several times a year throughout the two-year test period to retrieve sensor data and assess conditions inside the module.

 

Expandable habitats are designed to take up less room on a spacecraft, but provide greater volume for living and working in space once expanded. This first test of an expandable module will allow investigators to gauge how well the habitat performs and specifically, how well it protects against solar radiation, space debris and the temperature extremes of space.

 

BEAM launched April 8 aboard a SpaceX Dragon cargo spacecraft from Cape Canaveral Air Force Station in Florida, and is an example of NASA’s increased commitment to partnering with industry to enable the growth of the commercial use of space. The BEAM project is co-sponsored by NASA’s Advanced Exploration Systems Division and Bigelow Aerospace.

 

The International Space Station serves as the world’s leading laboratory for conducting cutting-edge microgravity research and is the primary platform for technology development and testing in space to enable human and robotic exploration of destinations beyond low-Earth orbit, including asteroids and Mars.

 

For NASA TV streaming video, schedule and downlink information, visit:


http://www.nasa.gov/nasatv

GAME ON! :yes: 


Article link | Engadget website

 

Inflatable space stations could orbit the Earth by 2020

Quote

Bigelow Aerospace believes its inflatable habitat can democratize space.

bigelow-b330-ed.jpg

The latest SpaceX launch ferried not just supplies for the ISS, but also aninflatable module designed to add a small living room on the space station. That module was made by Bigelow Aerospace, which has just announcedthat it teamed up with United Launch Alliance to send its much, much bigger inflatable stations called B330 to Low Earth Orbit. One B330 can add a 330-cubic-meter (or 12,000-cubic-foot) living space to the ISS -- that's 30 percent of its total size, whereas the model that piggybacked on Falcon 9 can only expand the station by five percent.

 

In order to fit inside an Atlas V rocket, a B330 will be folded when it takes off from Earth. Even then, the Atlas V is the only rocket with a big enough payload compartment to accommodate one. That likely played a huge part in Bigelow's decision to strike a deal with ULA.

 

Besides expanding the ISS, several B330s can be linked together to form an independent space station, as well. The companies can then rent them out to private corporations and institutions that want to perform non-government scientific research in microgravity. They also think that some companies like Disney could turn them into exciting and (quite literally) out of this world tourist destinations.

 

If NASA agrees to test the B330 on the ISS like it agreed to test out its smaller predecessor for the next two years, then it will be financing the first module's launch. Either way, the duo aims to send the first of the two inflatable habitats they're planning to space sometime in 2020.


Source: Bigelow AerospaceB330

OH YEAH. :D 

I was thinking about this, and it's perfect from a Space Politics point of view. Here we have Bigelow, who is pretty much the defacto #2 in the minds of everyone of us NewSpace fans right behind SpaceX in terms of thinking outside the box and pushing new technologies. We love Bigelow and everything they are striving to achieve. :yes:

 

So to be inclusive, fair, and "let's show OldSpace that we're willing to partner with anyone" in true olive branch and "let's get a latte" fashion, they've inked a deal with ULA to test what can only be described as "Bigelow's Moneymaker" Hab ...

 

And ya know what? It's a perfect scenario. I like it. :) It shows OldSpace that Bigelow (and by extension, NewSpace because that is how NewSpace rolls) is willing to work with OldSpace on something as critically important as this. It cannot be stressed how important the 330's testing phase and Orbital Shakedown really is. And they've hired ULA to tote it uphill.

 

Yeah ... handshakes, lattes', rockets and inflatable habs. It's a fantastic time for Space Fans. :yes: 

 

I don't get why all these media insist on the 'fact' that this is going to happen. They must have clearly been looking at another presser than I have!

 

BA has an agreement with ULA to reserve a slot for a launch in that 2020 timeframe, but that is about as far as it goes. If nobody pays for that rocket, then it won't fly... ULA certainly isn't going to pony it up, can tell you that much.

 

Bigelow just wants to warm up NASA on this idea and until they bite I do not forsee 330 going up... Yet!

Last I heard at the press release, or should I say, the way that I took it, it was just a "cooperative venture" with ULA. My impression was that it is an attempt to convince NASA of it's merits for near future ventures, and no money, at this time, has been allotted for anything...basically a PR event. In a few forums, speculation has it that SpaceX, with it's  full manifest, was probably not approached right away due to it's increasing workload at the moment.

 

I have no idea what is really planned, but have noticed "the usual suspects", with grand plans, appearing to gather for the "feeding trough", which usually means that something is up.

 

I'll wait this out and see who puts the cash down and who punches metal.

 

It would be great to see something, but I have seen too much vaporware and "power point" plans for my fill lately.

 

:D   Besides, I'm distracted by Mars goodies.

  • Like 1

My point exactly, now I believe that Bigelow is willing to field the money for building an actual flight worthy BA-330, but launching and operating it are a wholly different cookie and thats why they want NASA on board. They also literally said during their combined presser that it was more of an MOU between them (ULA and BA) with a reservation for a flight. But just as I said then, I will not buy it that ULA would actually field the booster without having somebody pony up the money for it. We're talking about a venture here that is under quarterly review for development and resource allocation on their new rocket! Do you really expect Boeing/LM would allow ULA to just 'give away' a rocket? I dont :p

  • Like 1

And the risk of something going massively wrong is higher, so the rate would obviously be highly reduced ...

 

Guess we'll just have to let this one play out. I was unaware that this was already known about. Heh.

  • Like 1
14 hours ago, Unobscured Vision said:

And the risk of something going massively wrong is higher, so the rate would obviously be highly reduced ...

 

Guess we'll just have to let this one play out. I was unaware that this was already known about. Heh.

Well, it is a tough unit as Doc has mentioned in the past. It may even be RUD proof....joking....:D

 

As well, reference Doc's upper post, it appears that some vendors are braver than others, and are willing to be on a few inaugural launches, why not the Vulcan. I think it's a great idea and a good PR move.

 

  • Like 1

origaBEAMi – An Origami Paper-Folding Activity to Create and Expand Your Own Miniature BEAM Module

 

Quote

To coincide with the Bigelow Expandable Activity Module (BEAM) technology demonstration for the International Space Station, here is a simple and fun activity called ‘origaBEAMi’ to enable you to quickly build and expand your own miniature BEAM module -- all by a series of simple folds of the paper model provided. 

You will want to first view or download the ‘crew procedures,’ which contain step by step instructions on how to print and fold your BEAM module. You can also view the video that shows the same process. Have fun, and be sure to learn more about BEAM and ISS research and technology!

beam-origami-origabeami-model02.jpg?inte

origaBEAMi paper model inflated upon completion of folding.
Credits: NASA

 

Pdf printout

 

Ground Crew assembly procedures, PDF

 

and a folding video if required.

 

How To Make an Origami BEAM – Fold your own space station module!

video is 5:43 min.

 

 

 

http://www.nasa.gov/mission_pages/station/research/news/origaBEAMi

 

http://www.space.com/32991-nasa-origami-beam-inflatable-space-habitat-model.html

 

:woot:

  • Like 1

Yep, looks like BEAM's got some pyros that didn't cut. Blah. :( Ohm values are all over the place, and those should be consistent if they'd fired. Some variation or straight open if they had. Darn it all.

 

[EDIT] Good grief, those are not the values I'd expect. Sheesh. Nail-biter.

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • I just looked on my computer and there are settings and log files for utilities I have never even turned on!
    • O&O ShutUp10 3.1.1104 by Razvan Serea O&O ShutUp10 offers a simple yet effective way to take control of your Windows privacy. It provides access to almost 50 privacy-related tweaks, most of them hidden or not easily accessible to the average computer users. Using a very simple interface, you decide how Windows 10/11 should respect your privacy by deciding which unwanted functions should be deactivated. Using ShutUp10 you can easily disable Windows Defender, turn off telemetry, disable peer-to-peer updates, turn off Wi-Fi Sense, disable automatic Windows updates, turn off and reset Cortana and more. ShutUp10 allows you to create a System Restore point before you apply any changes, so that you can revert your system at any time if you run into problems. O&O ShutUp10 is entirely free and does not have to be installed – it can be simply run directly and immediately on your PC. And it will not install or download retrospectively unwanted or unnecessary software, like so many other programs do these days! O&O ShutUp10 Free and Premium The latest version brings O&O ShutUp10 Premium, expanding the app’s long-standing privacy controls with automatic enforcement of user-defined settings. Instead of manually rechecking options after every Windows update, users can set their preferred privacy configuration once—or apply recommended settings in a single click—and the tool continuously monitors them in the background. If Windows 10 or 11 re-enables disabled features or introduces new data collection paths, Premium restores the chosen settings automatically without user intervention. The free version remains available and fully functional for manual adjustments, offering the same core privacy controls for Windows. However, the Premium tier is aimed at users who want long-term, hands-off protection, adding automatic reapplication after updates, ongoing monitoring, and optional notifications to ensure privacy settings remain consistent over time. O&O ShutUp10 3.1.1104 changelog: Added “Show Differences” button in the overview panel “Don’t show again” option for the restore point prompt Ctrl+F keyboard shortcut for search/filter functionality Detection and linking of system-wide and user-specific setting associations Automatic search while typing PREM: Option to preserve notification counters and timestamps across application restarts PREM: Reset blocked settings button in the Settings dialog PREM: Informational message when no settings are blocked PREM: Update check can also be triggered from the menu PREM: Notification deduplication and activity log summary feature Improved L005 “Disable Windows Location Service”: Version-specific split (up to Windows 11 23H2) and new variant for Windows 11 24H2+ L001 (Disable Location): Added Night Light warning to the description in all languages Search now detects setting IDs even when ID display is disabled and offers to enable it Detection and removal of Copilot/AI desktop apps in RecallTerminator Optimized High DPI support PREM: Reset button is now only enabled when blocked items exist – setting IDs are shown in the confirmation dialog PREM: Updated tray icons with higher-resolution versions PREM: Activity Log timestamps now use localized date and time formats PREM: Tray icon status now uses OK/Warning indicators and localized tooltips PREM: Recall folder detection switched to service-based detection PREM: Copilot uninstallation now provides UI feedback and improved verification Fixed Description text was not displayed correctly for the last item and disappeared when clicking the scrollbar Crash when clicking a search result heading or the […] button PREM: Installation path is now correctly preserved during upgrades PREM: Tray icon was not reliably removed when exiting the application PREM: Main window was not displayed correctly in single-instance mode PREM: Incorrect display of the & symbol in tray icon tooltips on Windows 10 PREM: Fixed notification flooding after sleep/standby PREM: Dashboard was not refreshed after applying recommended settings during onboarding PREM: Progress bar was not reset after deleting Recall folders PREM: Fixed service startup failures PREM: Fixed incorrect drift detection when Automatic Protection was disabled PREM: Notifications now correctly count all deviating settings when protection is enabled PREM: Registration Wizard was shown after sleep/standby despite a valid license Download: O&O ShutUp10 3.1.1104 | 76.4 MB (Freeware) Download: O&O ShutUp10 32-bit | ARM64 View: O&O ShutUp10 Home Page | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • Fascinating...W h i t e P o w e r is now also asterisks out.  
    • In the past few days I have noticed two odd moderation activities. First, when I posted the term 'White Nationist Christian' it was asterisk's out. When I changed it to **** it was allowed! Second, in the Politics is a ###business thread I was allowed to post that the GOP is a party of p e d ophiles but I was censored  when I posted the GOP are a party of p e d ophile protectors. Wtf Neowin. Please explain.
  • Recent Achievements

    • One Month Later
      Vincian earned a badge
      One Month Later
    • First Post
      Jocimo earned a badge
      First Post
    • Week One Done
      suprememobiles48 earned a badge
      Week One Done
    • One Month Later
      Windows Guy earned a badge
      One Month Later
    • One Month Later
      Prasann earned a badge
      One Month Later
  • Popular Contributors

    1. 1
      +primortal
      547
    2. 2
      +Edouard
      166
    3. 3
      PsYcHoKiLLa
      86
    4. 4
      Steven P.
      66
    5. 5
      neufuse
      65
  • Tell a friend

    Love Neowin? Tell a friend!