It's always nice to see a Delta Heavy fly, but otherwise... Orion, SLS. I just cant stop thinking about the lost opportunity cost. And for what? And to where? For no reason -except $$$$$ spent -and nowhere worth going to at that cost, and maybe not at all.

Economies and budgets in decline everywhere, resources squandered, time wasted...

  • Like 1

SpaceX has a manifest whose value is approaching $6B, and of that $1.6B is NASA for Cargo Resupply Services.

Commercial Crew launch contracts won't be added for 2 more years, and any use of NASA facilities not a part ofCommercial Cargo or Crew is on SpaceX's dime. This includes their cargo fairing, Falcon 9 v1.1, Falcon Heavy and the F9R reusability developments.

SpaceX also paid to upgrade a stand at NASA Stennis for testing the Raptor Mars engine, and it's components have been tested since late May. That train is leaving the station a lot sooner than most people think, and certainly sooner than 2030.

The biggest issue with SLS I find is that, the senate is hellbent on giving back the Michoud facilities and anyone else who lost their job at the Space Shuttle's retirement their job back, which is nice... But... The SSMEs are shall we say this, old, like pre 1980's old. The SRBs I happen to have a bit of beef with using Solid fuel, as opposed to using liquid fueled engines which can be shut down in case of an emergency. Docm please chime in if I am straying off topic too much. But for pete's sake, SLS is tax payer dollars going to waste imh. You figure, they are going to wait till 2018 to shoot Serial # 1 of SLS because of NASAs laughable budget... Like Docm and previous poster quipped, Spacex will be running a taxi service to the moon before 2018.

The old Shuttle SSME's (RS-25) will only be used on the first few SLS flights, IIRC they only have 12, then they need a new engine which hasn't been chosen yet. They could re-start the RS-25 line and produce new expendable versions, or use another engine. Either will be very expensive.

Then there is the SLS upper stage kettle of worms.

NASA spent $billions upgrading Saturn V's J-2 upper stage engine to the J-2X then shelved it. Sound familiar? Now they're using 4 RL10C-1's, whose heritage dates to 1962, in a totally new Exploration Upper Stage. This while simultaneously searching for an RL10 replacement in the EELV Centaur upper stages.

/sigh....

With SpaceX's fracking bloody huge Raptor engine components already on a test stand at NASA Stennis it's not too big a reach that their BFR launcher will fly years before the upgraded (non RS-25) SLS does.

BFR makes SLS look small, with very good reasons to believe it'll be a 12.5 to 15 meter wide core vs. SLS's 8.4 meters. They'll need those big tanks to feed 9(!) Raptors and still keep the BFR under 400 feet tall.

NASA should save some major bucks and use BFR, but the Lockheed/Boeing lobby has too much influence in the Senate regardless of what party's in control.

  • Like 1

So essentially Docm, the SLS is doa... These guys hoarded 12 motors for the first few flights, and then... oh wait, there are no more engines...  Also, if I may ask isn't the RL10 also part of the DELTA IV Upper stage?

 

Also, 12 motors, which means if they pin 4 of these things, they are looking at 3 flights until its game over, 5 like the ARES V design and well. its going to be a shorter ride until they run out of SSMEs

The RL10 is used in both the Atlas V Centaur upper stage (1 or 2 engines) and the Delta IV DCSS (Delta Cryogenic Second Stage).

Atlas V may be scrapped because of the Russian engine deal. ULA and Blue Origin are working on a methane fueled EELV using the latters BE-4 in the first stage and the smaller BE-3 in the second stage.

It would have more first stage thrust and a better first stage Isp than Atlas V, which could eliminate solid boosters for most launches.

Hey Docm, what would SpaceX have to do to to Human rate the Falcon 9 v 1.1.?

Falcon 9 v1.1/F9R was designed as a human rated launcher, so physically it already is. The main difference would be a software upload to reduce G loads the crew is exposed to and avoid maneuvers that would make aborts difficult (aka "black zones".)

It actually goes goes beyond the usual human ratings because it has engine-out capability. Engine-out for Falcon 9 v1.1 means there is armor plate and fireproofing between its 9 engines, so if one or two fail catastrophically the others are protected and can simply throttle up to continue the mission.

Having the 9 engine layout means losing one only reduces thrust by 11% instead of 50% like Antares. Such a single engine failure with Falcon 9 wouldn't end the mission

This has actually been used during a CRS flight of Falcon 9 v1.0, which also had engine-out. The fuel dome of its #5 engine let go so the computers shut its systems off, burned the remaining 8 engines longer to compensate (it's engines weren't throttleable), and Dragon got to ISS 30 minutes early.

Most likely January given all the effort and the delay caused by getting Dragon CRS-5 reconfigured to haul up duplicates of critical cargo lost in the Antares explosion.

The pad abort test involves a temporary platform attachment for LC-40's TEL (transporter erector launcher) that'll raise Dragon 2 to its launch height. It also provides the operational data lines and stage 2 mechanical and fluid attachments. It's been mounted to the TEL and tested, so after CRS-5 they'll re-mount it and prep for the pad abort.

It's also VERY likely Falcon 9 will launch 2 Cygnus CRS missions while Orbital qualifies different engines for Antares. Most likely the RD-193, a derivation of the RD-191 used in Angara. It's a drop-replacement for Antares NK-33.

Most likely January given all the effort and the delay caused by getting Dragon CRS-5 reconfigured to haul up duplicates of critical cargo lost in the Antares explosion.

The pad abort test involves a temporary platform attachment for LC-40's TEL (transporter erector launcher) that'll raise Dragon 2 to its launch height. It also provides the operational data lines and stage 2 mechanical and fluid attachments. It's been mounted to the TEL and tested, so after CRS-5 they'll re-mount it and prep for the pad abort.

It's also VERY likely Falcon 9 will launch 2 Cygnus CRS missions while Orbital qualifies different engines for Antares. Most likely the RD-193, a derivation of the RD-191 used in Angara. It's a drop-replacement for Antares NK-33.

Will they fly the Cygnus capsule up or will they just use a Dragon capsule since it's already fitted to go on a Falcon 9?

They'll fly an improved Cygnus spacecraft. The Cygnus uses interfaces that are very similar to other Orbital built satellites F9 has launched and the companies have worked well together.

The improvement consists of adding container segments which make it longer, and also making it possible to use Cygnus as a crew mission habitat for Orion, Dragon 2 or CST-100 during long duration flights.

For Dragon 2 the theory is a Cygnus could be mounted to the F9 upper stage but inside a Dragon 2 stretched Trunk. Dragon and the Trunk would separate, turn around, dock with and move away with the Cygnus much as Apollo did with the LEM.

Cygnus-Congigurations.jpg

cst100_cygnus_bkgtest2.jpg

Thanks you guys, for clearing that out. So I take it the next step for SPACEX would be to go through the battery of tests to certify DRAGON 2.0 as human rated, are there any timelines for said work to commence?

Pad abort around January 2015 as discussed, an in-flight abort test spring/summer 2015 at Vandenberg, and a full up orbital test in early/mid 2016. SpaceX believes a crewed test could happen later in 2016, but NASA may not have the funding.

SpaceX may fly a crew in 2016 on their own dime to put an exclamation point on things since CST-100 won't be ready until 2017.

  • 1 month later...

NASA announces that the RS-25 (aka: Space Shuttle Main engines) will be the permanent first stage propulsion, with AEROJET restarting the production of said motors, the motors are modified for SENATE LAUNCH SYSTEM, ehem, I mean Space launch system, and thus now called RS-25D

 

 

http://news.yahoo.com/nasa-conducts-1st-test-fire-shuttle-era-engine-123208742.html

  • 1 month later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • draw.io Desktop 30.2.6 by Razvan Serea draw.io desktop is a downloadable security-first diagramming application that runs on Windows, MacOS and Linux. Creating diagrams in the desktop app doesn’t need an internet connection. This is useful when you are disconnected or when you must create diagrams in a highly secure environment, where data protection is of the utmost importance. When you use the draw.io desktop app, your diagrams will be stored on your local device. Because this is a stand-alone application, also designed to run offline, there are no interfaces to cloud storage platforms available. Of course, you can still store your diagrams in folders that are synchronised to your cloud storage if you wish. Easy-to-use diagram editor The draw.io apps work just like the office and drawing tools you are used to using. Drag and drop shapes from the shape libraries and drag to draw connectors between them. Drag connectors to add waypoints and set a precise shape and position, or let them reroute automatically. Double click and start typing to add a label to anything. Create tables and swimlane flows with a familiar tool. Style shapes and connectors with customisable palettes, sketch options, fonts and text formatting tools. Search for shapes, including in open-source icon libraries. Use our vast libraries of shapes and templates, organised into logical categories, to create a range of diagrams and infographics. Generate diagrams from text descriptions using our smart templates. Diagram faster with keyboard shortcuts. draw.io Desktop 30.2.6 changelog: Uses electron 42.5.0 #2452 Updates to draw.io core 30.2.6. Download: draw.io 64-bit | Standalone (Open Source) Download: draw.io 32-bit | ARM64 | ARM64 Standalone Links: draw.io Home Page | Project page @GitHub | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • One Month Later
      Excellence2025 earned a badge
      One Month Later
    • Week One Done
      Excellence2025 earned a badge
      Week One Done
    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      497
    2. 2
      +Edouard
      207
    3. 3
      PsYcHoKiLLa
      146
    4. 4
      Steven P.
      74
    5. 5
      FloatingFatMan
      69
  • Tell a friend

    Love Neowin? Tell a friend!