It can go beyond Earth orbit, which Dragon 2 will be able to do with a Service Module, but Dream Chased and CST-100 are not up to it. Their thermal protection systems aren't up to 25,000-30,000 mph re-entries and their power systems aren't up to free flights longer than a few days.

NASA advertises Orion as a Mars spacecraft, but it couldn't really do that alone. Such an architecture would need to include a transfer vehicle with a habitat, a logistics module ("pantry"), a departure & return propulsion module/stage, a lander/return vehicle etc. The capsules job would be to taxi the crew to the transfer stack, return them to Earth, and act as a command module between.

Without those it would be limited to short missions in the space around the Earth-Moon system (cislunar space) and near-Earth asteroid missions.

Dragon 2 could do cislunar missions as well, but SpaceX's plan for far BEO is the MCT spacecraft. All indications are it's to be a beast.

Not even going to fly until 2021? SpaceX will likely be doing Lunar Checkouts/Testing on Dragon V2+ by then.

 

And yes, that's Dragon V2 PLUS -- with all the goodies, addons and (most likely) platform upgrades by then. Big, BIG stuff in the works from SpaceX around that timeframe that we'll be sure to hear about way before then. :yes:

Sad, isn't it? Orion and SLS are both circling the drain, and not just because of Falcon Heavy. It's very likely Blue Origin's own launcher (not the ULA Atlas V replacement) will be a heavy or super-heavy and capable of major campaigns. 2 of either BO's launcher or FH could likely put up an SLS level mission at a fraction of the cost.

Boeing is supplying the SLS core stages under a six-and-a-half-year, $2.8 billion contract that was finalized in July. The deal runs through 2021 and calls for the company to deliver two SLS cores, including hydrogen and oxygen tanks, and avionics.

 

 

$2.8 billion for 2 cores, seems like a good deal. Better than the $1b a year they get now for maintaining. 

$1.4B per launcher without a payload. Actual missions could run $2-5B according to govt. reports.

Two disposable (full payload mass) Falcon Heavy's would lift more than a $1.4B SLS Block-1 by a lot (~100 tonnes vs. 70 tonnes) and cost about $250M.

Now consider the fully developed SLS with a 130 tonne payload mass. It's anticipated SpaceX's BFR will also be much cheaper, but have a payload mass of 200-300 tonnes.

This because SpaceX is targeting a higher thrust level (15 million lbf) with a more advanced engine (full flow staged combustion) and using a more efficient fuel (methane) than SLS will use in its first stage. Those advanced FFSC engines started tests over a year ago at NASA Stennis.

  • Like 1

Yep. NASA needs to stick to what they are good at -- Science Missions of the Unmanned Kind. They usually get that stuff off the ground on time.

 

When we don't include the James Webb Space Telescope. That's another one that has circled the drain for too many years, blown way past budget and generally has proven the theories of NASA's bureaucracy and internal culture to be completely true. Much like the abomination that Orion and SLS is now.

 

It's a shame, really. Both programs had such potential.

 

Here's a thought -- hand the JWST over to SpaceX, with full Technical Specs and Diagrams/Schematics. They'll have that piece of equipment in space within two years, fully upgraded and uprated with modern tech and ready to do it's job.

 

Then give them the keys to Orion and SLS. Likely 85% of that technology will be immediately be scrapped (and thusly recycled), and the remaining 15% (the useful bits) will then be upgraded (since it will likely be out of date) for use in the Dragon V2+ gear.

True, but if anyone could get it finished up and into space in the next three years, they could. :yes:

 

[EDIT] Of course, they'll check the optics and mirror(s) before launch to make sure there isn't a repeat of the HST debacle. SpaceX is thorough like that.

I agree.

 

At the rate that Adaptive Optics technologies are improving/evolving for ground-based systems, we might not need the space-based Observatories. Once the major Observatories are outfitted with the Generation 4 upgrades sometime over the next few years we'll have a better idea where things stand.

 

Of course, the specialized systems like Kepler and the like will always be needed.

- Orion is too far into development to cancel, so they might as well finish it. Adapters can be made to fit it to Commercial vehicles, such as Falcon 9 Heavy and so on, as we saw with the test flight using the Delta 4 Heavy. Since the Falcon 9 Heavy won't be ready for active service until 2016 or 2017 (at the earliest), this fits nicely into NASA's schedule.

 

- SLS, however, is not far enough along (aside from construction facilities which are in-progress). That large, upright welder that has given them trouble lately has not actually built anything yet, correct? If they were to cancel the SLS program right now, that will reduce a huge financial, oversight, and operational headache and eliminate the other infrastructure upgrades and changes they apparently are required to perform to Complex 39B; and in fact they would then be in a position to lease that area to Commercial Interests like SpaceX, Orbital, and others.

 

So, in my view, cancelling SLS (and its' massive construction & infrastructure needs) would not only free up NASA to finish Orion ahead of the current schedule, but allow them to lease 39B and recoup some money for the Government. Even if it does not necessarily serve NASA, it's good business practice and will attract Commercial customers to the Cape.

 

Thanks for the article, Doc. You're on top of things us usual. :)

Something I was thinking about (and it's really a shame) is that for all of the fantastic work that NASA has done in the past and continues to do (to some degree)  in the present, and with all of the incredible science going on in partnership with all of the various Universities, Agencies, and other Government programs around the world, NASA seems incapable of managing its' own affairs in a common-sense fashion. I'm not kidding ... it's almost as if there is some kind of purposeful incentive to do things as inefficiently and wastefully as possible.

 

During my Military days it was like that as well, to some degree. Not nearly as blatant, but anyone who has served in the U.S. Military will know exactly what I'm talking about -- that mind-numbing "hurry up and wait" thing that drove each and every one of us completely batty.  :laugh: Nothing got done expeditiously.

 

It's sad, and shouldn't be like that. NASA used to be the pinnacle of what human beings could accomplish when we worked together toward common goals. Once we got our heads out of the sand and began working with other Governments (like Russia), there was no limit to what we could accomplish. I think our best days of Space Exploration are still ahead of us, but we need to clean house. NASA, as it currently exists, has to go.

Something I was thinking about (and it's really a shame) is that for all of the fantastic work that NASA has done in the past and continues to do (to some degree)  in the present, and with all of the incredible science going on in partnership with all of the various Universities, Agencies, and other Government programs around the world, NASA seems incapable of managing its' own affairs in a common-sense fashion. I'm not kidding ... it's almost as if there is some kind of purposeful incentive to do things as inefficiently and wastefully as possible.

 

During my Military days it was like that as well, to some degree. Not nearly as blatant, but anyone who has served in the U.S. Military will know exactly what I'm talking about -- that mind-numbing "hurry up and wait" thing that drove each and every one of us completely batty.  :laugh: Nothing got done expeditiously.

 

It's sad, and shouldn't be like that. NASA used to be the pinnacle of what human beings could accomplish when we worked together toward common goals. Once we got our heads out of the sand and began working with other Governments (like Russia), there was no limit to what we could accomplish. I think our best days of Space Exploration are still ahead of us, but we need to clean house. NASA, as it currently exists, has to go.

WE need to clean house the next couple elections or nothing is ever going to change.  That will fix more than just problems with NASA.  It should solve a lot of other problems.

Not sure which one is worse, to be honest. Two sides of the same coin. Both sides of the aisle are responsible for creating the current state of affairs, and they both have a responsibility to fix it if they are tasked to do so. Generally it turns out worse than before.

 

I think one of the problems is that the entrenched elements in NASA and other organizations (and this also goes for the Corporations whom rely on the large Government contracts such as ULA) are resistant to change and in many cases do everything they can to prevent it.

 

Sad, really, when there's no accountability for poor performance in a system organized like NASA is.

  • Like 1

So that would just change the focus from democrat proc to republican proc...

Both sides are bad.  Some new members make it in and aren't so bad, but even they slowly start caring more about their wallet instead of what's right or what's more efficient.  There needs to be accountability and not a bunch of things snuck into bills just to get votes.  Not easy to change or fix it anymore I'm afraid.

  • Like 1

Yep, that's why I'm of the opinion that NASA in it's current form needs to end. I know that I'm over-simplifying it, but a short-list breakdown includes:

 

- The current unmanned missions (Voyager, New Horizons, Dawn, etc) are mostly run by JPL in California.

- The US Operations to the ISS are conducted from the JSC in Texas.

- Primary launch facilities, vehicle assembly and coordination from KSC in Florida.

- Research and Development for NASA is conducted all over the United States and Canada.

- Science and Climatology Programs are worldwide, but many fall under the auspices and direction of NASA.

- Dedicated Recovery and Rehabilitation assets , much of which was left over from the Apollo and Space Shuttle programs that were never fully decommissioned or recycled.

- Administration and Training Facilities, many of which are no longer used.

 

This is probably 60% of what NASA is.

 

So, what needs to be done? What can be done? What should be done? These are the real questions, and there are no easy answers other than 'it cannot be allowed to continue like this'.

  • 2 weeks later...

So, what needs to be done? What can be done? What should be done? These are the real questions, and there are no easy answers other than 'it cannot be allowed to continue like this'.

 

I think simply put...funding and a clear direction to head.  It is hard to head in a direction when the "next" administration changes what the previous one set.  It is hard to head in any direction without funding.

 

Funding...funding...funding.  Give NASA a direction and the money to create technology and they will achieve the goal (or try).  

 

Obviously not doable now but leading up to the moon landings NASA received between 2-4.5% of the budget (varied every year).  With funding the US put its first man in space in 1961 and then just 8 years later they put man on another celestial body.  Just 8 years...to me that is fascinating...going from barely getting off the ground to the moon in just 8 years.

 

Today, they only receive about .5% with a budget of $18B in 2015.  To put that into perspective....

- You could barely buy 9 B-2 bombers  

- The F-35 program has cost around $400B to date (or around $21B per year since 1996).

 

--Neither one of those can go to space and/or perform scientific research which reveals the unknown for the benefit of all humans.

Hmm. Not quite what they had in mind at 80%(?) of the stated reentry speed for a manned mission ...

 

Either the seawater or the reentry itself did that. It that's indeed reentry damage, they're going to have to re-think that whole Heat Shield.

 

Video of the reentry itself didn't show any of the characteristics of the Heat Shield "burning up", as it would be quite noticeable in the plume as embers or trailing sparks.

 

This is something the Orion people will have to examine (and simulate in controlled conditions) to get a better idea of what's going on.

@ jjkusaf: Funding is not so much the issue as it is a problem with NASA Management. I will be the first one to state that the job of NASA Administrator is not an easy task even in the best of times. Nor is the task of any of the other Administrative personnel responsible for the other aspects of NASA's operation. They serve many masters -- The President, Congress, the Military Detachment specifically assigned to NASA's activities, the myriad of Companies with whom NASA does business, the Scientific Community, even the Public to some degree.

 

What I am saying is that it has become too convoluted. Too many masters. Too many different interests at work.

 

I suppose that what I am saying, if there's anything meaningful in my long-winded, convoluted diatribe, is that NASA needs to either reinvent itself or needs to be reinvented. The NASA of old simply does not function properly anymore.

  • Like 2

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Russia was able to invade Crimea because of those people. But my point is that I've personally heard how great it was to be "back in Russia" right afterwards - look how great it is now. I've asked you a question in another comment which you haven't answered, so I'll ask it again: is it better now without "Europrats"?
    • ZimaBoard 2 1664 Starter Kit review: it's a cool and affordable DIY NAS by Steven Parker IceWhale Technology reached out to me asking if I was interested in testing the ZimaBoard 2, and after convincing them to send me the Starter Kit, it arrived at my doorstep in May. A bit of background: it is a Shanghai-based Chinese company founded in 2020, which specializes in single-board servers and personal cloud solutions. From searching around online, user feedback on the company and ZimaOS is mostly positive, so we're off to a good start. In addition, I should probably point out that although they do not have a large portfolio of NAS devices, with just four of what they do offer, they seem to have covered everything from a relatively low-priced entry point with the ZimaBoard 2, right up to the high end, with the ZimaCube 2 Creator Pack that even includes an NVIDIA RTX PRO 2000. Anyway, as already mentioned, what we have today is the ZimaBoard 2 Starter Kit, and here are the full specifications: ZimaBoard 2 Model 832, 1664 CPU Intel Core N150 (4x E Cores/Threads, Max burst up to 3.6 GHz) TDP: 6W (Base) 10W (Max) Graphics Intel UHD Graphics 24 EUs (1.00 GHz) Memory 8 GB, 16 GB DDR5 4800MT/s non ECC SODIMM (soldered) Disk Capacity 60 TB (30 TB x 2) Supported RAID Types TRAID, TRAID +, RAID0, RAID1, RAID5, RAID 6, RAID 10 Storage 2 x SATA 3.0 6Gb/s Ports with Power Bootloader 32 GB, 64 GB eMMC Network 2x RJ-45 2.5 GbE PCIe 1 x PCIe 3.0 (via LPC) USB Ports 2 x USB-A 3.1 (5 Gbps) Display Mini-DisplayPort 1.4 (4K@60Hz) Hardware Transcoding Engine H.264, H.265, MPEG-4, VC-1 Maximum resolution: 4K (4096 x 2160); Maximum FPS: 60 Virtualization Intel® AES New Instructions Intel® Virtualization Technology (VT-x) Intel® Virtualization Technology for Directed I/O (VT-d) Size (H/W/D) 140mm x 83mm x 31mm Weight 0.4 kg (only ZimaBoard 2 device) Power 12v 5A Power Supply Warranty 1 year (Global) 2 Years (EU) OS ZimaOS v1.6.1 MSRP $339, $399 ($548.60) As you can see above, there are two variants of the ZimaBoard 2. The lesser variant has half the eMMC storage and 8 GB less RAM, although it also costs $60 less than the top variant we are testing today. The above pricing is only for the ZimaBoard 2. I put the MSRP of the Starter Kit next to it in brackets, although as of publishing, it is discounted to $534.50. The ZimaBoard 2 started life on Kickstarter and shipped to backers in August last year. It became available via the official website in late 2025 and Q1 2026. This hobbyist NAS contains the still relatively new N150 Intel CPU released in the first quarter of 2025, with support for DisplayPort 1.4, HDMI 2.1, although in this case, the memory is integrated into the board itself, so it will not be possible to upgrade or expand the amount. It also supports AV1 decoding, as well as H.264, VP8, VP9, H.265 (8 bit), and H.265 (10 bit). The different capabilities in the Alder Lake-N (and Twin Lake) series are listed below. Processor E-cores L3-cache Turbo clock GPU GPU-clock TDP Intel N355 8 6 MB 3.9 GHz 32 EUs 1.35 GHz 9 W Intel Core 3 N350 3.9 GHz 1.35 GHz 7 W Intel Core i3-N305 3.8 GHz 1.25 GHz 9 W Intel Core i3-N300 3.8 GHz 1.25 GHz Intel N250 4 3.8 GHz 1.25 GHz 6 W Intel Processor N200 3.7 GHz 0.75 GHz Intel N150 3.6 GHz 24 EUs 1 GHz Intel N97 1.2 GHz 12 W Intel Processor N100 3.4 GHz 0.75 GHz 6 W The CPU is part of the Twin Lake series that sits near the bottom of the N-series, designed for low- powered systems and entry-level laptops, and as such has a base level TDP of just 6W. As I have noted before, we are seeing another NAS with a great amount of RAM. It's important to mention that the ZimaBoard 2's memory is integrated into the base board (which is why they have two variants of it). As a reminder, up until a couple of years ago, it was commonplace to only get 2 or 4GB max on a flagship Synology or QNAP home NAS. Ever since the likes of TerraMaster and more have entered the market with ample RAM sizes included in their NAS offerings, it has gone a long way in forcing the hands of the traditional makers to up their game a bit. First impressions The Starter Kit came in one outer box with several packages inside it (shown above). I forgot to take pics of it because when it arrived, it wasn't clear what was inside, and I had to confirm with my contact that I received the entire Starter Kit. In the box ZimaBoard 2 ZimaBoard 2 HDD Expansion Bracket + PCIe card frame Zimaboard Mini DisplayPort Male to HDMI Female Cable 4K 60Hz Zimaboard PCIe 3.0 x4 to Dual NVMe M.2 SSD Adapter Card Quick guide [full online guide] Limited warranty notice Screws Design Where to start? You'd be forgiven for mistaking it as an SSD enclosure if not for all the ports on it. It is completely made out of metal, and the top is an entire heatsink. It has a premium feel about it, but it definitely looks like a hobby device. As you will see, the completed build looks like it belongs in a server or meter closet rather than as a showpiece on someone's desk. On what I am calling the rear, there's a Mini DisplayPort (1.4), two 2.5 GbE ports, with Type A 3.1 USB ports, and then the barrel connector port. Around the front, there are two SATA6 ports with a power connector in the middle. Left side Right side One side is completely free of ports. On the other there's a slit that allows for the feed of a CPU fan cable, and a PCIe 3.0 X4 slot. Top Bottom The top is entirely made up of a heatsink except for the extended height for the I/O on the rear. Around the other side, you can find the ZIMA branding and some regulatory information stamped near the bottom. As you may see from the bottom of the ZimaBoard 2, it scratches quite easily from just moving it around on my Ikea island. Teardown Before we get started, let's have a look at this thing on the inside. The steps to get to the board are as follows: Remove the four smaller Torx screws on the bottom of the ZimaBoard 2; Remove the four larger Torx screws on the sides of the device; Carefully unstick the CMOS battery from the PCB; Remove two Phillips screws on the PCB; Lift out the PCB. Yes, as you can tell from the instructions, you need three different tools to remove Torx and Phillips screws (10 in total), and unhelpfully, one of the screws is located under the CMOS battery, which is stuck onto the PCB. Building Now comes the fun part. Because the ZimaSpace website does not provide any guidance on how to put the Starter Kit together. They only have guidance for connecting the CPU fan. However, they did upload a video to their YouTube channel that shows the entire process. To install the fan, first remove the four screws on the bottom of the ZimaBoard 2, then on the inside, there is a CPU FAN connector where you can attach the fan, reattach the ZimaBoard 2 frame, and feed the fan cable through the provided slit. Then remove the nearest screw on the side and attach the fan frame to the side of the device using the same screw. ZimaBard 2 screws Aligning the screws Bottom view Remember those four screws we removed to access the CPU FAN? Longer screws are provided in the box with the HDD Expansion Bracket, which is what you will now need to attach the ZimaBoard 2 to it. Helpfully, the orientation on how to attach it is made obvious when the frame can only be screwed on at the same overall length as the ZimaBoard 2. If you do it the wrong way around (which is what I did initially) one side hangs off the frame, and it becomes difficult to attach the PCIe Adapter Card cable. PCIe card frame Other side PCIe slot connector Next, it's time to attach the PCIe card frame, which is fastened with the help of 3.5-inch SATA HDD (3 screws). These are toolless screws that you can just use your fingers to fasten them with. Then it is time to connect the provided PCIe cable with the slot connector on one side of the ZimaBoard 2, feed it through the bottom of the HDD frame, and fasten it with two standoffs. Both bracket options 2280 standoffs with 2x 4TB MP44Q The PCIe 3.0 X4 card comes with a short bracket option, handy if you decide to place it inside a different NAS or rack server, but here we need the long bracket. Oddly enough, the M.2 standoffs were preinstalled into the 22110 position, but extra standoffs are included in the box, which I installed at the 2280 position for our use. I added a couple of MP44Q M.2 PCIe 4.0 SSDs (2 x 4TB) that can be availed on Amazon for $478.99 (the lowest price for 3 months) that TEAMGROUP supplied us with Then we have the almost completed build, you just need to push the card into the PCIe slot. Unfortunately, IceWhale Technologies did not provide a screw for the PCIe card frame (this is also apparent in their own video). Here it is at several different angles, with the last pic showing the SATA Y-Cable connected to the two WD Red Plus 4TB drives. Setup and Usage Next, you connect your cables to the I/O, and the ZimaBoard 2 powers on automatically, as there is no power button on the device. Power is controlled through the Settings in ZimaOS. BIOS The ZimaBoard 2 includes an Aptio BIOS from American Megatrends [1, 2, 3], and you can setup pretty much everything here including the boot order, which is locked to the UEFI OS, however above that choice you can enable or disable booting to a SATA/USB bootloader so this would still allow you to switch to an alternative bootloader and boot from it, or disable it to instead always start from the first disk with an OS installed on it. Initial Setup Upon connecting to the LAN and booting up, the ZimaBoard 2 can be reached by navigating to the IP address (shown if you have a monitor connected), or you can find it using the ZIMA Client desktop application, which is essentially a Zima device finder. Initializing the ZimaBoard 2 The ZimaOS setup process is pretty straightforward, through a wizard, and in full above, it basically consists of setting up an account and some handy tips, and that's that! Post Setup (ZimaOS update) Upon first boot, you are alerted that there is a ZimaOS update from 1.5.0 to 1.6.1, which I applied; the full process is shown above with the changelog. ZimaBoard 2 Storage Setup Next, it is time to set up the storage. ZimaOS actually throws everything onto the eMMC flash drive; it is also the default location of AppData, which is definitely something to be wary about, as the 45GB available storage could fill up quickly. HDDs I first attempted to create a Storage Pool using the two 4TB WD Red Plus NAS drives, and got an error message: After several attempts and then looking online, I discovered it was a bug with ZimaOS where the fix was simply to reboot ZimaOS and then try again, this time I was able to create a RAID mirror using the two drives. SSDs I did the same for the SSDs, as you will see in the above gallery, when I created the second Storage Pool, it only allowed me to select available drives. ZimaBoard 2 AppData ZimaOS comes with an App Store that includes a repository of almost 400 apps, so you will be able to find most of what you'll need for a NAS (although after a quick search, I wasn't able to find a Surveillance Manager), and now comes the important part: moving the default AppData location off the 45GB eMMC and onto a larger volume: Open Settings Then Apps Then, in the Select a new location field, click on the new Storage volume you want to move it to (in my case, the Apps Storage Pool), which is the SSD RAID mirror. Confirm the Migration warning Be praised! You can also do this for Docker (which by default installs onto the 45GB eMMC flash drive) and the User database. Plex Setup Next, I tested the configuration by installing the Plex Server app from the App Store. The library folders must already exist (which I placed into the Storage Pool). Plex Server setup is straightforward and requires very little configuration. In my case, all I had to do was add the media path I just created, which you can also browse to using the folder icon in the path field. In addition, you can now map the new Media library in Windows Explorer using the Zima Client. Oddly enough, it is not possible to access the ZimaBoard 2 over the Network Neighborhood; you must map drives using the client, which is shown in the last image in the above gallery. I watched one of my Blu-Ray rips, which is Dolby Vision with Dolby Atmos, and the content played fine with no stuttering or buffering, which is what anyone needs in this scenario. ZimaBoard 2 Zima Client mobile app There's also a client for mobile. It is pretty barebones, as shown in the above gallery, for example, the Apps screen launches the WebUI for that app, and the Backup must be done manually. On opening Backup, you can select internal storage folders on your phone to backup to the ZimaBoard 2's storage, and although this is constantly scanned, the backup action itself must be manually triggered. There is an option to allow foreground backup (last image in the above gallery), but this basically means the queued backup gets triggered when you manually open the app. Benchmarking SATA PCIe 3.0 X4 A CrystalDiskMark test on a mapped network drive from within a Windows 11 25H2 PC (image above) connected over a 2.5 GbE was well within acceptable ranges. Writes were generally better on the SSD RAID mirror. SATA PCIe 3.0 X1 I also ran the NAS Performance tester, which tests the link speed performance. As you can see, it pretty much maxes out the 2.5GbE connection. Of course, you can also opt to bond the two 2.5 GbE connections for a bit more umph, but I didn't do that. Thermals Top PCIe card SATA HDDs Next, I measured some hotspots while playing content on Plex. It's fair to say this will perform better than a NAS that is enclosed in a metal or plastic case, as almost everything storage-wise is exposed! Anyway, the ZimaBoard 2 did not break a sweat with Plex streaming or disk benchmarks. ZimaOS Factory Reset ZimaOS does not include a factory reset option. Instead, you have to download the ZimaOS image and flash it to the eMMC manually. The flashing process is shown in the above gallery. The steps to do so are listed below: Download the ZimaOS image here; Open BalenaEtcher (Run as Administrator) and select the image; Select your inserted USB drive (min 8 GB) Flash to it; Connect your USB drive, monitor, keyboard, USB hub (optional), mouse (optional), and network cable (recommended) to the ZimaBoard 2; Connect power and press F11 continuously; Select your USB drive starting with UEFI in the boot device menu; Press Enter on the Install ZimaOS option; Select /dev/mmcblk0 (MMC) flash drive as target; Confirm with (three times) to wipe the target disk; Wait a couple of minutes while ZimaOS installs; Remove the USB drive and confirm with a reboot; Your ZimaBoard 2 has been factory reset. However, you don't have to stick with ZimaOS, in fact the company also offers official CasaOS images, that are based on Debian; or as they say themselves, put anything you want on this "hackable single board server" it's up to you. Conclusion I had a lot of fun putting this together. I've custom-built all my own PCs and servers since the 90s, and this is the first time I have had to put a NAS together. Even if the actual base ZimaBoard 2 was already a completed build, it still feels pretty custom. I just wish that IceWhale Technology included a getting-started guide in the box for the Start Kit, which would have really completed this kit. Instead, I had to search for the official video on the YouTube channel to make sure I wasn't doing anything wrong. So who is this for? Definitely the hobbyist who is comfortable building their own PC and servers. It also has a much smaller footprint than its nearest equivalent (in terms of specs), like the Beelink Me Pro, which is another NAS I will be testing soon. Although the Beelink does not come with the PCIe 3.0 X4 expansion, the ZimaBoard 2 Starter Kit suddenly looks to be a great bargain, even if it only offers the two 3.5-inch bays over the four in the other example. It makes a lot of sense to use Intel's N150 chip inside a NAS; it is more than capable of doing what the ZimaBoard 2 is intended for, media streaming and backup. It also looks like the IceWhale Technology staff are quite active in the official forums helping people with issues they come across with ZimaOS and the devices, peer support seems to be good as well, I was quickly able to find why I was not able to create a new Storage Pool in ZimaOS v1.6.1 even though that is quite a serious bug, hopefully it will be fixed in the next update. If you are comfortable with the command line and Docker, you'll be fine. You can do great things with this hardware. This was my first time with ZimaOS. It seems a bit barebones in comparison to the likes of Synology DSM, TOS, and UGOS, but it has a ton of apps to get you started with your home or small business NAS. Where to buy As of publishing, IceWhale Technology is running a discount of up to 5% for the Starter Kit. If you opt to get just the ZimaBoard 2 itself, it does come with a SATA Y-Cable, so you will be able to connect up to two 3.5-inch HDDs to it. ZimaBoard 2 1668 Starter Kit for $534.50 on Amazon US (was $548.60) ZimaBoard 2 832 Starter Kit for $372.88 on Amazon US (was $390.60) Zimaboard 2 1668 (16GB+64GB) for $419.90 on Amazon US Zimaboard 2 832 (8GB+32GB) for $359.90 on Amazon Disclosure: IceWhale Technology provided a free sample without any editorial input or review pre-approval. Good to know The Amazon link is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, when you purchase through links on our site, we earn from qualifying purchases.
    • It's in the Insider's group so yes it's technically beta, though these days it's hard to see much of a difference unless you opt for the most extreme beta builds, which I don't. When I moved here from the Release Preview channel I did so primarily because I wanted to see how well the restored taskbar functionality (restored from Win10, and earlier) is working and whether it was time to finally abandon SAB--and it is--working fine, so far. Not as polished as SAB, but it'll do for me.
    • I've been using MWB Premium for a number of years so that along with Windows updates and updated browser should be fine. Thanks for that.
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      488
    2. 2
      +Edouard
      222
    3. 3
      PsYcHoKiLLa
      147
    4. 4
      Steven P.
      74
    5. 5
      FloatingFatMan
      71
  • Tell a friend

    Love Neowin? Tell a friend!