In spite of initial claims that the heat shield performed well it is going to be redone. Instead of a honeycomb with 320,000 cells which have to be manually filled with AvCoat using a caulk gun style device, they're switching to tiles. Not sure what kind of tiles yet, but if I were them I'd look very hard at using a PICA variant as SpaceX has..

  • Like 1

@ jjkusaf: Funding is not so much the issue as it is a problem with NASA Management. I will be the first one to state that the job of NASA Administrator is not an easy task even in the best of times. Nor is the task of any of the other Administrative personnel responsible for the other aspects of NASA's operation. They serve many masters -- The President, Congress, the Military Detachment specifically assigned to NASA's activities, the myriad of Companies with whom NASA does business, the Scientific Community, even the Public to some degree.

 

What I am saying is that it has become too convoluted. Too many masters. Too many different interests at work.

 

I suppose that what I am saying, if there's anything meaningful in my long-winded, convoluted diatribe, is that NASA needs to either reinvent itself or needs to be reinvented. The NASA of old simply does not function properly anymore.

 

Betaguy.  I do not disagree with you and I believe your remarks mirror what I said (just in a different way).  Too many "masters" giving NASA an unclear or ever changing direction.  Having a small budget does not help achieve the smaller and more manageable goals and is a major hindrance on the larger goals (whatever they are now).

  • Like 1

@jjkusaf: Yep, just echoing and expounding on your point. :)

 

@DocM: That's probably a good idea on their part. SpaceX has had very good results using that solution, and those tiles can be replaced allowing for vehicle reuse. If they can reuse Orion, that would be quite a welcome development, since rehabbing Orion would be far less costly than performing the same procedure on a Space Shuttle by orders of magnitude. If I recall correctly, that's the primary reason they cannot reuse capsule-type craft (like Apollo, Soyuz and so forth) -- because of reentry damage. Mitigate that and reuse becomes an option if you build it in.

 

That's why I like Dragon and Dragon V2 so much. They're built from the ground up to be reusable.

  • 4 weeks later...

Good grief....a big reason why a crewed Orion will be late: they can't even build the tools to build SLS properly on the first try....

http://spacenews.com/fix-in-the-works-for-giant-sls-welding-machine/

Fix in the Works for Giant SLS Welding Machine

COLORADO SPRINGS, Colo.

So, I assume someone's going to be paying a rather large penalty over this screw up?

 

Also, why the hell are they using something so... inaccurate.. as fractions of inches to align something so critical? They need to work to millimetres!

One would hope so, but history says that like other govt. cost-plus boondoggles it'll be put on Joe Sixpack's tab.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

 

Blithering idiots.

 

Use 1 or the other, NEVER mix them!

And this was better as opposed to using manpower and cranes to fabricate this vehicle ... how?

 

They built two different Saturn variants using traditional methods and it took less than two years from concept to having something on the Launch Pad ready to test. Of course, we remember the flaws with using a pure Oxygen atmosphere, but that was an issue with the spacecraft -- the launcher itself was ready.

 

Argh. Yet another example of the wrong people being in charge of things. This whole program is fubar, by my reckoning.

Vertical fab because that's how they did it for Saturn V, and they're all about doing what they've always done.

Just look at Orion: it's a scaled up Apollo with steep sides even though a shallower side angle would give more internal volume per unit of diameter and likely a lower mass, Soyuz, Shinzhou and Dragon being successful examples.

From NASA's Saturn V history,

The vertical assembly mode was selected, even though a new high-bay area was required, because horizontal assembly posed problems in maintaining accuracy of joints in the heavy, but thin-walled tanks. In vertical assembly, gravity held the huge parts together, although a 198-metric-ton crane was required to hoist the parts atop each other, and to lower the completed booster back to the horizontal for final finishing.

  • 2 weeks later...

From my experience, you can not mix imperial and metric and expect precision. Not everyone is proficient in conversions and ultimately, the longer the supervisory tree, the more likely a mistake. The one I have forged in my head is the "Gimli glider" incident, the 767 which ran out of fuel in the early 80"s. As a side note, the maintenance crew that drove from Winnipeg to carry out repairs, also ran out of fuel..... :pinch:  

  • 2 months later...

Orion service module still seen as schedule driver

Orion.thumb.jpg.f269ebcb46aceb29f612eaa1Artist’s concept of the Orion spacecraft with the European service module’s distinctive X-wing solar panels. Credit: NASA

 

The pace of the European Space Agency’s development of a power and propulsion module for NASA’s Orion crew capsule will likely determine when an unpiloted test flight of the spaceship and its heavy-lift rocket will take off, NASA officials said last week.

The first flight of NASA’s Space Launch System is currently penciled in some time between July and September 2018, according to Bill Hill, NASA’s deputy associate administrator for exploration systems development.

“We’re a little more than three years away,” Hill told members of the NASA Advisory Council’s human exploration subcommittee July 28.

The mission will send an uncrewed Orion spacecraft into lunar orbit for a mission lasting more than 20 days. The capsule will return to Earth for a parachute-assisted ocean splashdown in a final shakedown before NASA adds final life support systems and crew accommodations for a manned flight around 2021.

NASA working on the deep space exploration rocket and capsule programs under a budget projected at approximately $3 billion per year.

 

NASA and ESA officials, together with contractors from Orion-builder Lockheed Martin and Airbus, have discussed shipping the Orion service module from Europe to NASA’s Kennedy Space Center in Florida before it is finished. European engineers could travel to the Florida spaceport to complete construction of the service module before its integration with the Orion crew capsule, which is to be assembled by Lockheed Martin at KSC’s Armstrong Operations and Checkout Building.

Engineers plan to introduce changes to the Orion crew module after a successful orbital test flight in December 2014. The upgrades include a switch from a monolithic heat shield made of ablative Avcoat material to blocks of Avcoat, a change intended to improve the manufacturability of the thermal protection system.

 

719725main_011613_mg3_Orion-SM_labels_em
 A diagram of the Orion crew capsule. Credit: NASA

The Orion service module, which did not fly on EFT-1, will include propellant tanks, batteries, pressure vessels, four solar array wings and a hypergolic engine for major burns during the mission. NASA is supplying ESA with a space shuttle Orbital Maneuvering System engine to power the Orion spacecraft, with delivery of the engine to Europe expected in early 2016, according to a schedule chart presented by Hill.

ESA is in charge of the service module’s structure, electrical system and fuel tanks. It is the first time NASA has entrusted an international partner with a major component in the critical path of a human spaceflight program.

Without ESA’s part, NASA officials said the first SLS/Orion flight — known as Exploration Mission-1 — could be delayed even further due to U.S. budget constraints. Before partnering with ESA, NASA did not have funding to complete development of the service module in time for a flight in 2017, the original target launch date for EM-1.

The ESA-funded development of the Orion service module counts as Europe’s contribution to the International Space Station’s annual operating costs from 2017 through 2020. ESA discontinued flights of its cargo delivery craft, the Automated Transfer Vehicle, in 2014.

esm_sta.thumb.png.3122c8e7cb624f22f38d73
 A structural test article of the Orion spacecraft’s service module is undergoing testing at Thales Alenia Space in Italy. It will be shipped to NASA’s Plum Brook Station in Ohio in October for further tests. Credit: NASA/ESA

Once the Orion crew and service modules are finished, NASA will send the units to Plum Brook in 2017 for combined testing in a huge thermal vacuum chamber to mimic the conditions of space. They will return to KSC for final flight preps.

ULA is kicking off production of the SLS upper stage’s first flight unit, which is propelled by an Aerojet Rocketdyne RL10 engine. The rocket is an interim upper stage for the heavy-lift launcher, and it is based on the Delta 4 booster’s five-meter (16.4-foot) second stage.

Preparations on the Space Launch System’s twin solid rocket boosters is also due to start soon at Orbital ATK’s facilities in Utah. A final qualification firing of a stationary booster is scheduled for April 2016.

Work on SLS ground systems at KSC is also proceeding, Hill said.

 

 

Structural modifications to the SLS mobile launch platform, originally built for the ill-fated Ares 1 rocket, were finished in July under a $20 million contract with a local Florida construction firm, Hill said.

A new contract should be signed within weeks to add cladding and support arms to the mobile launch tower, which is sitting outside the Vehicle Assembly Building at KSC. The addition of new work platforms inside the cavernous VAB’s High Bay 3 is about 30 percent complete, according to Hill.

Eleven construction projects are underway at launch pad 39B, where SLS missions will take off. The work includes refurbishment of the flame trench and sound suppression water system.

Ground systems at KSC should be ready around the end of 2017, officials said.

 http://spaceflightnow.com/2015/08/03/orion-service-module-seen-as-schedule-driver/

Cheers....:)

We'll see if the ATV derived service module is affordable or not. Or if it can make the schedule. Lockheed had hoped to dislodge it with bits from their Jupiter/Exoliner CRS II entry, but NASA wasn't keen on that systems complexity wet it's CRS mission. Lockheed was trying to piggyback R&D for a lot of projects into CRS II.

Edited by DocM

NASA Invites Media to Orion Spacecraft Parachute Test in Arizona

WASHINGTONAug. 4, 2015 /PRNewswire-USNewswire/ -- NASA is inviting media to attend a test of the Orion spacecraft's parachutes on Wednesday, Aug. 26 at the U.S. Army's Yuma Proving Ground in Arizona. An engineering model of the spacecraft will drop from an airplane 35,000 feet up to evaluate how it fares when the parachute system does not perform as expected.

 

During the test, Orion engineers will carry out a scenario in which one of the spacecraft's two drogue parachutes and one of its three main parachutes fail. This high-risk assessment is the penultimate drop test of the scheduled engineering evaluations leading up to next year's tests to qualify the parachute system for crewed flights. 

http://www.spacedaily.com/reports/prnewswire-space-news.html?doc=201508041509PR_NEWS_USPR_____DC72272&showRelease=1&dir=0&categories=AEROSPACE-AND-SPACE-EXPLORATION&andorquestion=OR&&passDir=0,1,2,3,4,5,6,15,17,34

Hope the test goes well

Note.....LDSD chute issues .....and now a chute test which is intentionally defective.....first thing that popped into my head......Cheers

Funny...and true...

Ironic, since all they have to do is get a military expert, of which the US Armed Forces has many, that can drop a tank (or any heavy equipment) anywhere on the planet on a routine basis.....with chutes that work......:) 

The Orion/CST nonsense needs to be put to pasture already. Way over budget, way overdue and suffering from "feature creep". For NASA to make this debacle the "measuring stick" for scheduling is just plain disgusting. And now they've had to spend nearly half a billion USD to secure seats on Soyuz flights to the ISS -- money that could have (and should have) been used to get the more viable (and nearly flight-ready, if not already) Dragon 2 Manned program up and running. It could be flying this year. Yes, THIS YEAR. Not in 2018, 2024 or whatever year these dipsticks arbitrarily cook up for convenience. With the funding used for those Soyuz flights, Dragon 2 could be up and running now.

But nooooooo .... the ever-present, maddening bureaucracy needs its' "Bridge to Nowhere".

Sickening.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Microsoft is bringing a much-needed Recap app to Teams, here is a first look by Usama Jawad Microsoft Teams is heavily used in work and school environments, and perhaps one of its core but extremely useful features is the ability to record meetings. In past years, Microsoft has further improved upon this functionality by integrating AI, but you do need a Microsoft 365 Copilot license to leverage most, if not all, all of those capabilities. Now, the Redmond tech firm is making another significant enhancement in the area of Teams meeting recordings. Up until now, if you wanted to access Teams recordings, you had to arduously locate the meeting invite and navigate to the dedicated tab, or go to the cloud storage location such as a SharePoint site. This was a rather overwhelming activity, especially if you don't remember the name of the meeting or the meeting occurred quite a while ago. Microsoft is now attempting to solve this problem through a dedicated Recap app that consolidates all your recordings. This centralized experience will allow users to find all recordings from the past 30 days and also offer access to other related services such as transcripts and AI-powered summaries. Customers will have the option to search for recordings, filter them, and review multiple meetings by generating AI-powered podcast-style recaps. The Recap app will list all available recordings in both thumbnail and list views. The former is shown below: And here is how Teams users with a Microsoft 365 Copilot license can select multiple recordings to generate a podcast-style audio recap: Microsoft has emphasized that the Recap app is pre-installed in Teams but it will not be pinned by default. Users will able to navigate to the Teams app store from the left rail, and pin it from the apps section. It will be enabled by default for all users once it becomes available. It's worth noting that while Teams recordings and transcripts can be accessed by all users governed by existing permissions, AI-powered features like intelligent summaries, audio recaps, and video recaps will require a Microsoft 365 Copilot license. The Recap app will be generally available to Teams users on Windows, Mac, and the web by the end of next month, with mobile support coming soon.
    • It's so stupid that you have to "enroll" in these extended updates.
    • Helium Browser 0.13.6.1 by Razvan Serea Helium is a private, fast, and honest Chromium-based web browser — built for people, with love. It offers the best privacy by default, unbiased ad-blocking, and a clean experience free from bloat and noise. Proudly based on Ungoogled-Chromium, Helium removes Google’s clutter while keeping a fast, efficient development pipeline. With thoughtful touches like native !bangs and split view, Helium is a people-first, fully open-source browser that puts control back in your hands. Privacy, security, and control come first. Ads, trackers, and third-party cookies are blocked automatically, HTTPS is enforced everywhere, and all Chromium extensions work seamlessly — while Google can’t track your activity. Helium’s 13,000+ offline-ready !bangs let you jump straight to sites or AI tools like ChatGPT instantly. Open-source, people-first, and unbiased, Helium delivers a browsing experience that’s fast, secure, and free from noise, ads, and compromises. Helium Browser key features: Performance Fast, efficient, and lightweight — built on Chromium’s optimized engine. Energy-saving and consistent — stays fast over time without slowing down. No bloat — stripped of unnecessary components for maximum speed. Minimalist interface — compact, clean, and distraction-free. Customizable toolbar — hide elements you don’t need. Smooth and stable — no flicker, lag, or animation glitches. Comfort-focused experience — intuitive and unobtrusive. Privacy & Security Best privacy by default — blocks ads, trackers, phishing, and third-party cookies. Unbiased ad-blocking — powered by community filters and uBlock Origin. No telemetry or analytics — zero background web requests on first launch. Strict HTTPS enforcement — warns for insecure sites. Passkeys supported — modern authentication made simple. No built-in password manager or cloud sync — your data stays yours. Extension Compatibility Full Chromium extension support — including MV2 extensions. Anonymized Chrome Web Store requests — Google can’t track extension installs. Extended MV2 support — maintained for as long as possible. Smart Features Native !bangs — browse faster using 13,000+ offline-ready shortcuts. AI integration — use !chatgpt and others directly from the address bar. Offline functionality — bangs work without an Internet connection. Philosophy People-first design — open source, transparent, and community-driven. No ads, no noise, no bias — privacy and honesty over profit. Helium Browser 0.13.6.1 changelog: c6feb7e0 revision: bump to 6 (#2015) 03a16cfa merge: update to chromium 149.0.7827.200 (#2014) d447f889 merge: update ungoogled-chromium to 149.0.7827.200 8f30897f Update to Chromium 149.0.7827.200 1772f7ce bump-platform: check if b/s/chrome exists instead of just b/s/ (#2003) Download: Helium 64-bit | Portable 64-bit |~100.0 MB (Open Source) Download: Helium ARM64 | Portable ARM64 Links: Helium Home Page | macOS | Linux | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • Too late for a slightly older computer I had that didn't meet the hardware requirements for Windows 11 but had great hardware. I installed ubuntu on that thing and gave to a friend's kid.
  • Recent Achievements

    • Week One Done
      tuben earned a badge
      Week One Done
    • First Post
      OffsetAbs earned a badge
      First Post
    • Reacting Well
      OffsetAbs earned a badge
      Reacting Well
    • First Post
      Kolakid60 earned a badge
      First Post
    • Week One Done
      xvvxcvv earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      425
    2. 2
      +Edouard
      184
    3. 3
      PsYcHoKiLLa
      149
    4. 4
      Steven P.
      72
    5. 5
      FloatingFatMan
      71
  • Tell a friend

    Love Neowin? Tell a friend!