In spite of initial claims that the heat shield performed well it is going to be redone. Instead of a honeycomb with 320,000 cells which have to be manually filled with AvCoat using a caulk gun style device, they're switching to tiles. Not sure what kind of tiles yet, but if I were them I'd look very hard at using a PICA variant as SpaceX has..

  • Like 1

@ jjkusaf: Funding is not so much the issue as it is a problem with NASA Management. I will be the first one to state that the job of NASA Administrator is not an easy task even in the best of times. Nor is the task of any of the other Administrative personnel responsible for the other aspects of NASA's operation. They serve many masters -- The President, Congress, the Military Detachment specifically assigned to NASA's activities, the myriad of Companies with whom NASA does business, the Scientific Community, even the Public to some degree.

 

What I am saying is that it has become too convoluted. Too many masters. Too many different interests at work.

 

I suppose that what I am saying, if there's anything meaningful in my long-winded, convoluted diatribe, is that NASA needs to either reinvent itself or needs to be reinvented. The NASA of old simply does not function properly anymore.

 

Betaguy.  I do not disagree with you and I believe your remarks mirror what I said (just in a different way).  Too many "masters" giving NASA an unclear or ever changing direction.  Having a small budget does not help achieve the smaller and more manageable goals and is a major hindrance on the larger goals (whatever they are now).

  • Like 1

@jjkusaf: Yep, just echoing and expounding on your point. :)

 

@DocM: That's probably a good idea on their part. SpaceX has had very good results using that solution, and those tiles can be replaced allowing for vehicle reuse. If they can reuse Orion, that would be quite a welcome development, since rehabbing Orion would be far less costly than performing the same procedure on a Space Shuttle by orders of magnitude. If I recall correctly, that's the primary reason they cannot reuse capsule-type craft (like Apollo, Soyuz and so forth) -- because of reentry damage. Mitigate that and reuse becomes an option if you build it in.

 

That's why I like Dragon and Dragon V2 so much. They're built from the ground up to be reusable.

  • 4 weeks later...

Good grief....a big reason why a crewed Orion will be late: they can't even build the tools to build SLS properly on the first try....

http://spacenews.com/fix-in-the-works-for-giant-sls-welding-machine/

Fix in the Works for Giant SLS Welding Machine

COLORADO SPRINGS, Colo.

So, I assume someone's going to be paying a rather large penalty over this screw up?

 

Also, why the hell are they using something so... inaccurate.. as fractions of inches to align something so critical? They need to work to millimetres!

One would hope so, but history says that like other govt. cost-plus boondoggles it'll be put on Joe Sixpack's tab.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

 

Blithering idiots.

 

Use 1 or the other, NEVER mix them!

And this was better as opposed to using manpower and cranes to fabricate this vehicle ... how?

 

They built two different Saturn variants using traditional methods and it took less than two years from concept to having something on the Launch Pad ready to test. Of course, we remember the flaws with using a pure Oxygen atmosphere, but that was an issue with the spacecraft -- the launcher itself was ready.

 

Argh. Yet another example of the wrong people being in charge of things. This whole program is fubar, by my reckoning.

Vertical fab because that's how they did it for Saturn V, and they're all about doing what they've always done.

Just look at Orion: it's a scaled up Apollo with steep sides even though a shallower side angle would give more internal volume per unit of diameter and likely a lower mass, Soyuz, Shinzhou and Dragon being successful examples.

From NASA's Saturn V history,

The vertical assembly mode was selected, even though a new high-bay area was required, because horizontal assembly posed problems in maintaining accuracy of joints in the heavy, but thin-walled tanks. In vertical assembly, gravity held the huge parts together, although a 198-metric-ton crane was required to hoist the parts atop each other, and to lower the completed booster back to the horizontal for final finishing.

  • 2 weeks later...

From my experience, you can not mix imperial and metric and expect precision. Not everyone is proficient in conversions and ultimately, the longer the supervisory tree, the more likely a mistake. The one I have forged in my head is the "Gimli glider" incident, the 767 which ran out of fuel in the early 80"s. As a side note, the maintenance crew that drove from Winnipeg to carry out repairs, also ran out of fuel..... :pinch:  

  • 2 months later...

Orion service module still seen as schedule driver

Orion.thumb.jpg.f269ebcb46aceb29f612eaa1Artist’s concept of the Orion spacecraft with the European service module’s distinctive X-wing solar panels. Credit: NASA

 

The pace of the European Space Agency’s development of a power and propulsion module for NASA’s Orion crew capsule will likely determine when an unpiloted test flight of the spaceship and its heavy-lift rocket will take off, NASA officials said last week.

The first flight of NASA’s Space Launch System is currently penciled in some time between July and September 2018, according to Bill Hill, NASA’s deputy associate administrator for exploration systems development.

“We’re a little more than three years away,” Hill told members of the NASA Advisory Council’s human exploration subcommittee July 28.

The mission will send an uncrewed Orion spacecraft into lunar orbit for a mission lasting more than 20 days. The capsule will return to Earth for a parachute-assisted ocean splashdown in a final shakedown before NASA adds final life support systems and crew accommodations for a manned flight around 2021.

NASA working on the deep space exploration rocket and capsule programs under a budget projected at approximately $3 billion per year.

 

NASA and ESA officials, together with contractors from Orion-builder Lockheed Martin and Airbus, have discussed shipping the Orion service module from Europe to NASA’s Kennedy Space Center in Florida before it is finished. European engineers could travel to the Florida spaceport to complete construction of the service module before its integration with the Orion crew capsule, which is to be assembled by Lockheed Martin at KSC’s Armstrong Operations and Checkout Building.

Engineers plan to introduce changes to the Orion crew module after a successful orbital test flight in December 2014. The upgrades include a switch from a monolithic heat shield made of ablative Avcoat material to blocks of Avcoat, a change intended to improve the manufacturability of the thermal protection system.

 

719725main_011613_mg3_Orion-SM_labels_em
 A diagram of the Orion crew capsule. Credit: NASA

The Orion service module, which did not fly on EFT-1, will include propellant tanks, batteries, pressure vessels, four solar array wings and a hypergolic engine for major burns during the mission. NASA is supplying ESA with a space shuttle Orbital Maneuvering System engine to power the Orion spacecraft, with delivery of the engine to Europe expected in early 2016, according to a schedule chart presented by Hill.

ESA is in charge of the service module’s structure, electrical system and fuel tanks. It is the first time NASA has entrusted an international partner with a major component in the critical path of a human spaceflight program.

Without ESA’s part, NASA officials said the first SLS/Orion flight — known as Exploration Mission-1 — could be delayed even further due to U.S. budget constraints. Before partnering with ESA, NASA did not have funding to complete development of the service module in time for a flight in 2017, the original target launch date for EM-1.

The ESA-funded development of the Orion service module counts as Europe’s contribution to the International Space Station’s annual operating costs from 2017 through 2020. ESA discontinued flights of its cargo delivery craft, the Automated Transfer Vehicle, in 2014.

esm_sta.thumb.png.3122c8e7cb624f22f38d73
 A structural test article of the Orion spacecraft’s service module is undergoing testing at Thales Alenia Space in Italy. It will be shipped to NASA’s Plum Brook Station in Ohio in October for further tests. Credit: NASA/ESA

Once the Orion crew and service modules are finished, NASA will send the units to Plum Brook in 2017 for combined testing in a huge thermal vacuum chamber to mimic the conditions of space. They will return to KSC for final flight preps.

ULA is kicking off production of the SLS upper stage’s first flight unit, which is propelled by an Aerojet Rocketdyne RL10 engine. The rocket is an interim upper stage for the heavy-lift launcher, and it is based on the Delta 4 booster’s five-meter (16.4-foot) second stage.

Preparations on the Space Launch System’s twin solid rocket boosters is also due to start soon at Orbital ATK’s facilities in Utah. A final qualification firing of a stationary booster is scheduled for April 2016.

Work on SLS ground systems at KSC is also proceeding, Hill said.

 

 

Structural modifications to the SLS mobile launch platform, originally built for the ill-fated Ares 1 rocket, were finished in July under a $20 million contract with a local Florida construction firm, Hill said.

A new contract should be signed within weeks to add cladding and support arms to the mobile launch tower, which is sitting outside the Vehicle Assembly Building at KSC. The addition of new work platforms inside the cavernous VAB’s High Bay 3 is about 30 percent complete, according to Hill.

Eleven construction projects are underway at launch pad 39B, where SLS missions will take off. The work includes refurbishment of the flame trench and sound suppression water system.

Ground systems at KSC should be ready around the end of 2017, officials said.

 http://spaceflightnow.com/2015/08/03/orion-service-module-seen-as-schedule-driver/

Cheers....:)

We'll see if the ATV derived service module is affordable or not. Or if it can make the schedule. Lockheed had hoped to dislodge it with bits from their Jupiter/Exoliner CRS II entry, but NASA wasn't keen on that systems complexity wet it's CRS mission. Lockheed was trying to piggyback R&D for a lot of projects into CRS II.

Edited by DocM

NASA Invites Media to Orion Spacecraft Parachute Test in Arizona

WASHINGTONAug. 4, 2015 /PRNewswire-USNewswire/ -- NASA is inviting media to attend a test of the Orion spacecraft's parachutes on Wednesday, Aug. 26 at the U.S. Army's Yuma Proving Ground in Arizona. An engineering model of the spacecraft will drop from an airplane 35,000 feet up to evaluate how it fares when the parachute system does not perform as expected.

 

During the test, Orion engineers will carry out a scenario in which one of the spacecraft's two drogue parachutes and one of its three main parachutes fail. This high-risk assessment is the penultimate drop test of the scheduled engineering evaluations leading up to next year's tests to qualify the parachute system for crewed flights. 

http://www.spacedaily.com/reports/prnewswire-space-news.html?doc=201508041509PR_NEWS_USPR_____DC72272&showRelease=1&dir=0&categories=AEROSPACE-AND-SPACE-EXPLORATION&andorquestion=OR&&passDir=0,1,2,3,4,5,6,15,17,34

Hope the test goes well

Note.....LDSD chute issues .....and now a chute test which is intentionally defective.....first thing that popped into my head......Cheers

Funny...and true...

Ironic, since all they have to do is get a military expert, of which the US Armed Forces has many, that can drop a tank (or any heavy equipment) anywhere on the planet on a routine basis.....with chutes that work......:) 

The Orion/CST nonsense needs to be put to pasture already. Way over budget, way overdue and suffering from "feature creep". For NASA to make this debacle the "measuring stick" for scheduling is just plain disgusting. And now they've had to spend nearly half a billion USD to secure seats on Soyuz flights to the ISS -- money that could have (and should have) been used to get the more viable (and nearly flight-ready, if not already) Dragon 2 Manned program up and running. It could be flying this year. Yes, THIS YEAR. Not in 2018, 2024 or whatever year these dipsticks arbitrarily cook up for convenience. With the funding used for those Soyuz flights, Dragon 2 could be up and running now.

But nooooooo .... the ever-present, maddening bureaucracy needs its' "Bridge to Nowhere".

Sickening.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • foobar2000 2.25.10 by Razvan Serea foobar2000 is an advanced freeware audio player for the Windows platform. It features the simplest, most minimalistic interface you'll ever see in this kind of program. Other features include full unicode support, ReplayGain support and native support for several popular audio formats. foobar2000 features: Supported audio formats: MP3, MP4, AAC, CD Audio, WMA, Vorbis, FLAC, WavPack, WAV, AIFF, Musepack, Speex, AU, SND... and more with additional components. Gapless playback. Full unicode support. Easily customizable user interface layout. Advanced tagging capabilities. Support for ripping Audio CDs as well as transcoding all supported audio formats using the Converter component. Full ReplayGain support. Customizable keyboard shortcuts. Open component architecture allowing third-party developers to extend functionality of the player foobar2000 2.25.10 changelog: Improved implementation of built-in UPnP Media Renderer, implemented gapless playback compatible with popular UPnP control apps. Enabled discovery of OpenHome UPnP devices as output devices. Enabled TLS v1.3 encryption for HTTPS connections. Fixed Ogg/Opus files with single chapter not showing correct track numbers. Fixed Direct2D visualizations getting stuck after GPU driver reinitialization. Updated 7-Zip library to 26.01. Updated UnRAR library to 7.2.6. Download: foobar2000 64-bit | 7.3 MB (Freeware) Download: foobar2000 32-bit | 6.4 MB Links: Home Page | foobar2000 for Mac | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • Pick up Babbel Language Learning lifetime subscription at 47% off with code by Steven Parker Learn all 14 languages and access more than 10,000 hours of high-quality language education online. Today's highlighted deal comes via our Apps + Software section of the Neowin Deals store, where you can pick up a lifetime subscription to Babbel Language Learning at 47% off. Note: Available to U.S. customers & NEW users only. Learn Spanish, French, Italian, German, and many more languages with Babbel, the #1 top-grossing language-learning app in the world. Developed by over 100 expert linguists, Babbel is helping millions of people speak a new language quickly and with confidence. After just one month, you will be able to speak confidently about practical topics, such as transportation, dining, shopping, directions, making friends and socializing and much more! Get lifetime access to learn all 14 languages Practice with 10-15 minute bite-sized lessons that fit conveniently into your schedule Cover a wide range of useful real-life topics, from travel to family, business, food & more Use speech recognition technology to keep your pronunciation on point Learn at a variety of skill levels, from beginner to advanced Get personalized review sessions to reinforce what you learn so it really sticks Study whenever & wherever you want and your progress will be synchronized across your devices Use offline mode to access courses, lessons & review items when not on Wi-Fi—just download them beforehand Languages Available: Spanish (Spain), German, Italian, French, Portuguese, Swedish, Turkish, Dutch, Polish, Indonesian, Norwegian, Danish, Russian, Spanish (Latin America) Good to know Length of access: lifetime Valid for New Users in the USA Only Redemption deadline: redeem your code within 30 days of purchase Please note redemption is required via Web Browser. Access to the mobile app will be available after redemption has been completed via web browser Max number of devices: Unlimited Access options: desktop & mobile Number of languages: 14 (all current languages) Updates included Babbel Language Learning: Lifetime Subscription (All Languages) normally costs $299, but you can pick it up for just $159 for a limited time - that represents a saving of $140. For a full description, specs, and license info, click the link below. Deal Price $159.00 with code LEARN (was $299) NOTE: For NEW users in the US only. Support queries If you have queries or need support for any of the Neowin Deals, please use the contact form here. Neowin Deals are managed and sold by StackCommerce who represent Neowin on an affiliate basis. Why we post these deals We post these because we earn commission on each sale so as not to rely solely on advertising, which many of our readers block. It all helps toward paying staff reporters, servers and hosting costs. So for those that keep moaning and complaining, be thankful we're still online for you to even do that. Other ways to support Neowin Whitelist Neowin by not blocking our ads Create a free member account to see fewer ads Make a donation to support our day to day running costs Subscribe to Neowin - for $14 a year, or $28 a year for an ad-free experience Disclosure: Neowin benefits from revenue of each sale made through our branded deals site powered by StackCommerce.
    • AltSendme 0.4.2 is out.
    • Simple answer is yes, you will still get the Windows updates and as long as browser is up to date, you will be good. Only thing secure boot does is protect you against boot level threats and make it harder to install other OS's. I've been looking into this pretty thoroughly lately myself as wifes computer has secure boot disabled plus my other, older computers that run Linux, don't have secure boot enabled. Have seen all kinds of questions about this on the Linux Mint and MX Linux forums. Just don't suddenly enable secure boot now.
    • How many other companies will follow Ford's lead? Or, have they already gotten lazy and become enslaved to AI--and now can't figure out how to get out of that mess.
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      494
    2. 2
      +Edouard
      225
    3. 3
      PsYcHoKiLLa
      148
    4. 4
      Steven P.
      75
    5. 5
      FloatingFatMan
      71
  • Tell a friend

    Love Neowin? Tell a friend!