Recommended Posts

In spite of initial claims that the heat shield performed well it is going to be redone. Instead of a honeycomb with 320,000 cells which have to be manually filled with AvCoat using a caulk gun style device, they're switching to tiles. Not sure what kind of tiles yet, but if I were them I'd look very hard at using a PICA variant as SpaceX has..

  • Like 1

@ jjkusaf: Funding is not so much the issue as it is a problem with NASA Management. I will be the first one to state that the job of NASA Administrator is not an easy task even in the best of times. Nor is the task of any of the other Administrative personnel responsible for the other aspects of NASA's operation. They serve many masters -- The President, Congress, the Military Detachment specifically assigned to NASA's activities, the myriad of Companies with whom NASA does business, the Scientific Community, even the Public to some degree.

 

What I am saying is that it has become too convoluted. Too many masters. Too many different interests at work.

 

I suppose that what I am saying, if there's anything meaningful in my long-winded, convoluted diatribe, is that NASA needs to either reinvent itself or needs to be reinvented. The NASA of old simply does not function properly anymore.

 

Betaguy.  I do not disagree with you and I believe your remarks mirror what I said (just in a different way).  Too many "masters" giving NASA an unclear or ever changing direction.  Having a small budget does not help achieve the smaller and more manageable goals and is a major hindrance on the larger goals (whatever they are now).

  • Like 1

@jjkusaf: Yep, just echoing and expounding on your point. :)

 

@DocM: That's probably a good idea on their part. SpaceX has had very good results using that solution, and those tiles can be replaced allowing for vehicle reuse. If they can reuse Orion, that would be quite a welcome development, since rehabbing Orion would be far less costly than performing the same procedure on a Space Shuttle by orders of magnitude. If I recall correctly, that's the primary reason they cannot reuse capsule-type craft (like Apollo, Soyuz and so forth) -- because of reentry damage. Mitigate that and reuse becomes an option if you build it in.

 

That's why I like Dragon and Dragon V2 so much. They're built from the ground up to be reusable.

  • 4 weeks later...

Good grief....a big reason why a crewed Orion will be late: they can't even build the tools to build SLS properly on the first try....

http://spacenews.com/fix-in-the-works-for-giant-sls-welding-machine/

Fix in the Works for Giant SLS Welding Machine

COLORADO SPRINGS, Colo.

So, I assume someone's going to be paying a rather large penalty over this screw up?

 

Also, why the hell are they using something so... inaccurate.. as fractions of inches to align something so critical? They need to work to millimetres!

One would hope so, but history says that like other govt. cost-plus boondoggles it'll be put on Joe Sixpack's tab.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

Working both Imperial and metric in one project isn't unusual for NASA and it's contractors, and conversion issues have cost missions before. In controlling the Mars Climate Orbiter orbital insertion maneuver NASA's ground based trajectory calcs used pound-seconds instead of the orbiters newton-seconds, which didn't end well.

 

Blithering idiots.

 

Use 1 or the other, NEVER mix them!

And this was better as opposed to using manpower and cranes to fabricate this vehicle ... how?

 

They built two different Saturn variants using traditional methods and it took less than two years from concept to having something on the Launch Pad ready to test. Of course, we remember the flaws with using a pure Oxygen atmosphere, but that was an issue with the spacecraft -- the launcher itself was ready.

 

Argh. Yet another example of the wrong people being in charge of things. This whole program is fubar, by my reckoning.

Vertical fab because that's how they did it for Saturn V, and they're all about doing what they've always done.

Just look at Orion: it's a scaled up Apollo with steep sides even though a shallower side angle would give more internal volume per unit of diameter and likely a lower mass, Soyuz, Shinzhou and Dragon being successful examples.

From NASA's Saturn V history,

The vertical assembly mode was selected, even though a new high-bay area was required, because horizontal assembly posed problems in maintaining accuracy of joints in the heavy, but thin-walled tanks. In vertical assembly, gravity held the huge parts together, although a 198-metric-ton crane was required to hoist the parts atop each other, and to lower the completed booster back to the horizontal for final finishing.

  • 2 weeks later...

From my experience, you can not mix imperial and metric and expect precision. Not everyone is proficient in conversions and ultimately, the longer the supervisory tree, the more likely a mistake. The one I have forged in my head is the "Gimli glider" incident, the 767 which ran out of fuel in the early 80"s. As a side note, the maintenance crew that drove from Winnipeg to carry out repairs, also ran out of fuel..... :pinch:  

  • 2 months later...

Orion service module still seen as schedule driver

Orion.thumb.jpg.f269ebcb46aceb29f612eaa1Artist’s concept of the Orion spacecraft with the European service module’s distinctive X-wing solar panels. Credit: NASA

 

The pace of the European Space Agency’s development of a power and propulsion module for NASA’s Orion crew capsule will likely determine when an unpiloted test flight of the spaceship and its heavy-lift rocket will take off, NASA officials said last week.

The first flight of NASA’s Space Launch System is currently penciled in some time between July and September 2018, according to Bill Hill, NASA’s deputy associate administrator for exploration systems development.

“We’re a little more than three years away,” Hill told members of the NASA Advisory Council’s human exploration subcommittee July 28.

The mission will send an uncrewed Orion spacecraft into lunar orbit for a mission lasting more than 20 days. The capsule will return to Earth for a parachute-assisted ocean splashdown in a final shakedown before NASA adds final life support systems and crew accommodations for a manned flight around 2021.

NASA working on the deep space exploration rocket and capsule programs under a budget projected at approximately $3 billion per year.

 

NASA and ESA officials, together with contractors from Orion-builder Lockheed Martin and Airbus, have discussed shipping the Orion service module from Europe to NASA’s Kennedy Space Center in Florida before it is finished. European engineers could travel to the Florida spaceport to complete construction of the service module before its integration with the Orion crew capsule, which is to be assembled by Lockheed Martin at KSC’s Armstrong Operations and Checkout Building.

Engineers plan to introduce changes to the Orion crew module after a successful orbital test flight in December 2014. The upgrades include a switch from a monolithic heat shield made of ablative Avcoat material to blocks of Avcoat, a change intended to improve the manufacturability of the thermal protection system.

 

719725main_011613_mg3_Orion-SM_labels_em
 A diagram of the Orion crew capsule. Credit: NASA

The Orion service module, which did not fly on EFT-1, will include propellant tanks, batteries, pressure vessels, four solar array wings and a hypergolic engine for major burns during the mission. NASA is supplying ESA with a space shuttle Orbital Maneuvering System engine to power the Orion spacecraft, with delivery of the engine to Europe expected in early 2016, according to a schedule chart presented by Hill.

ESA is in charge of the service module’s structure, electrical system and fuel tanks. It is the first time NASA has entrusted an international partner with a major component in the critical path of a human spaceflight program.

Without ESA’s part, NASA officials said the first SLS/Orion flight — known as Exploration Mission-1 — could be delayed even further due to U.S. budget constraints. Before partnering with ESA, NASA did not have funding to complete development of the service module in time for a flight in 2017, the original target launch date for EM-1.

The ESA-funded development of the Orion service module counts as Europe’s contribution to the International Space Station’s annual operating costs from 2017 through 2020. ESA discontinued flights of its cargo delivery craft, the Automated Transfer Vehicle, in 2014.

esm_sta.thumb.png.3122c8e7cb624f22f38d73
 A structural test article of the Orion spacecraft’s service module is undergoing testing at Thales Alenia Space in Italy. It will be shipped to NASA’s Plum Brook Station in Ohio in October for further tests. Credit: NASA/ESA

Once the Orion crew and service modules are finished, NASA will send the units to Plum Brook in 2017 for combined testing in a huge thermal vacuum chamber to mimic the conditions of space. They will return to KSC for final flight preps.

ULA is kicking off production of the SLS upper stage’s first flight unit, which is propelled by an Aerojet Rocketdyne RL10 engine. The rocket is an interim upper stage for the heavy-lift launcher, and it is based on the Delta 4 booster’s five-meter (16.4-foot) second stage.

Preparations on the Space Launch System’s twin solid rocket boosters is also due to start soon at Orbital ATK’s facilities in Utah. A final qualification firing of a stationary booster is scheduled for April 2016.

Work on SLS ground systems at KSC is also proceeding, Hill said.

 

 

Structural modifications to the SLS mobile launch platform, originally built for the ill-fated Ares 1 rocket, were finished in July under a $20 million contract with a local Florida construction firm, Hill said.

A new contract should be signed within weeks to add cladding and support arms to the mobile launch tower, which is sitting outside the Vehicle Assembly Building at KSC. The addition of new work platforms inside the cavernous VAB’s High Bay 3 is about 30 percent complete, according to Hill.

Eleven construction projects are underway at launch pad 39B, where SLS missions will take off. The work includes refurbishment of the flame trench and sound suppression water system.

Ground systems at KSC should be ready around the end of 2017, officials said.

 http://spaceflightnow.com/2015/08/03/orion-service-module-seen-as-schedule-driver/

Cheers....:)

We'll see if the ATV derived service module is affordable or not. Or if it can make the schedule. Lockheed had hoped to dislodge it with bits from their Jupiter/Exoliner CRS II entry, but NASA wasn't keen on that systems complexity wet it's CRS mission. Lockheed was trying to piggyback R&D for a lot of projects into CRS II.

Edited by DocM

NASA Invites Media to Orion Spacecraft Parachute Test in Arizona

WASHINGTONAug. 4, 2015 /PRNewswire-USNewswire/ -- NASA is inviting media to attend a test of the Orion spacecraft's parachutes on Wednesday, Aug. 26 at the U.S. Army's Yuma Proving Ground in Arizona. An engineering model of the spacecraft will drop from an airplane 35,000 feet up to evaluate how it fares when the parachute system does not perform as expected.

 

During the test, Orion engineers will carry out a scenario in which one of the spacecraft's two drogue parachutes and one of its three main parachutes fail. This high-risk assessment is the penultimate drop test of the scheduled engineering evaluations leading up to next year's tests to qualify the parachute system for crewed flights. 

http://www.spacedaily.com/reports/prnewswire-space-news.html?doc=201508041509PR_NEWS_USPR_____DC72272&showRelease=1&dir=0&categories=AEROSPACE-AND-SPACE-EXPLORATION&andorquestion=OR&&passDir=0,1,2,3,4,5,6,15,17,34

Hope the test goes well

Note.....LDSD chute issues .....and now a chute test which is intentionally defective.....first thing that popped into my head......Cheers

Funny...and true...

Ironic, since all they have to do is get a military expert, of which the US Armed Forces has many, that can drop a tank (or any heavy equipment) anywhere on the planet on a routine basis.....with chutes that work......:) 

The Orion/CST nonsense needs to be put to pasture already. Way over budget, way overdue and suffering from "feature creep". For NASA to make this debacle the "measuring stick" for scheduling is just plain disgusting. And now they've had to spend nearly half a billion USD to secure seats on Soyuz flights to the ISS -- money that could have (and should have) been used to get the more viable (and nearly flight-ready, if not already) Dragon 2 Manned program up and running. It could be flying this year. Yes, THIS YEAR. Not in 2018, 2024 or whatever year these dipsticks arbitrarily cook up for convenience. With the funding used for those Soyuz flights, Dragon 2 could be up and running now.

But nooooooo .... the ever-present, maddening bureaucracy needs its' "Bridge to Nowhere".

Sickening.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Simple answer is yes, you will still get the Windows updates and as long as browser is up to date, you will be good. Only thing secure boot does is protect you against boot level threats and make it harder to install other OS's. I've been looking into this pretty thoroughly lately myself as wifes computer has secure boot disabled plus my other, older computers that run Linux, don't have secure boot enabled. Have seen all kinds of questions about this on the Linux Mint and MX Linux forums. Just don't suddenly enable secure boot now.
    • How many other companies will follow Ford's lead? Or, have they already gotten lazy and become enslaved to AI--and now can't figure out how to get out of that mess.
    • Why would any self-respecting intelligent person follow any recommendation by Donald's GOP administration? With almost two years of fabrications, deceit, and blatantly illegal behavior, why believe them now? They had best be gone after the November 2026 election, so we'll wait and see.
    • AltSendme 0.4.1 by Razvan Serea AltSendme is a minimal, cross-platform application designed for fast, secure, and private peer-to-peer file transfers. It allows users to send files or entire directories directly between devices without relying on cloud servers, accounts, or any personal information. Everything is encrypted end-to-end using modern protocols like QUIC and TLS 1.3, ensuring both strong security and low-latency performance. Transfers are verified with BLAKE3 for data integrity, and interrupted downloads automatically resume, making the experience reliable even on unstable connections. You can transfer anything—images, videos, documents, and more. Integrity checks are performed on both ends, so your files are automatically verified for correctness during both sending and receiving. AltSendme works seamlessly across local networks or long-distance links, capable of saturating multi-gigabit connections for extremely fast delivery. With built-in NAT traversal and encrypted relay fallback, it connects devices almost anywhere. The app integrates with the Sendme CLI and will soon support mobile and web platforms. Fully free and open-source, AltSendme offers a lightweight, privacy-first alternative to traditional cloud-based services, removing size limits, upload costs, and unnecessary data exposure. AltSendme 0.4.1 changelog: Release Highlights Self-hosted relays: Run your own iroh relay so transfers don't rely on public infrastructure. Includes a full deployment template in deploy/relay/ with Docker Compose for a VPS and configuration examples for production use. Fly.io support: One-click deploy template for Fly.io, including a quick-start config (fly.dev.toml) for testing without a custom domain, plus production setup with Let's Encrypt and your own hostname. Relay settings UI: New Settings → Network panel to choose how AltSendme connects: automatic public relays, custom self-hosted URLs (with optional auth token), or disabled. Test connections, verify latency, and see live relay status in the footer. Disable relays: Turn off relay servers entirely when you only need same-network transfers (e.g. LAN). Direct connections only. No relay hop required when devices can reach each other. Android graduates from beta: Android is now part of the regular release cycle alongside desktop. APKs ship with each version (universal, arm64, and armv7). Other improvements Private relay access control via shared auth token Relay fallback notifications when a custom relay is unreachable Broadcast mode toggle in sharing settings Android release build fixes (split-per-ABI APKs, universal APK preservation) UI polish: mobile safe-area insets, dropzone layout, transfer progress animation Bug fixes for minification-related serialization issues and system tray icon loading What's Changed feat(relay): add relay status functionality and settings UI (a120cdf) feat(relay): implement custom relay server configuration and verification (51276c7) feat(relay): add configuration for private relay access and enhance observability features (48fbabf) feat(relay): enhance relay URL validation, display connection status (d4fffa0) feat(relay): add RelayChangeGuard component and enhance relay-related translations (16ba514) feat(broadcast): add toggle setting for broadcast mode in sharing UI (ca6d977) fix(relay): correct QUIC discovery port, pin image, templatize fly.dev (52a2ba5) fix: More broken serialization due to minification (67491a9) fix(android): preserve true universal APK across per-ABI builds (e9f256f) fix(ui): conditional safe-area insets padding on mobile (1182f0e) refactor(transfer): CircularRing component animation fix (944572b) chore(android): drop x86 and x86_64 release APKs, keep universal+arm64+armv7 (34ada0b) Download: AltSendme 0.4.1 | ARM64 | ~9.0 MB (Open Source) Download: AltSendme for MacOS | Android Links: AltSendme Home Page | GitHub | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • You are mostly right about the ephemeral nature of it. As I mention in the article, if you dont add a second device or take a backup of your account before uninstalling it, then yes you will lose access to your account. That said, in terms of actual user experience when you sync multiple devices your message history carries across and there's also a Saved Messages chat like there is on Telegram to send messages and attachments between your installs. But yh, what you point out are correct and its not trying to emulate Messenger or Telegram.
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      495
    2. 2
      +Edouard
      225
    3. 3
      PsYcHoKiLLa
      149
    4. 4
      Steven P.
      75
    5. 5
      FloatingFatMan
      71
  • Tell a friend

    Love Neowin? Tell a friend!