Arrrgh. Where do I begin ...

- That "pretty, heat-reflective, metallic coating" is completely unnecessary. All they're doing is adding weight and that weight will throw off the balance of the spacecraft, which is now balanced properly (not top-heavy) after the Engineers & Laborers building the damned thing just trimmed 20% of the weight just by doing some smart ... well, Engineering. The spacecraft was already designed to withstand the reentry temperatures on the outer skin iirc via a circulatory liquid cooling system like the ISS has. What's the matter, the liquid cooling system didn't scale properly? The composite material that the outer shell of the craft is made out of / that was applied to it didn't work either? Good grief, don't you people test this s**t before committing it to a design?

- Tiles in place of a Heat Shield ... okay. Long as SpaceX is supplying them and the personnel to install/repair/replace them after each mission. They're much lighter than a Heat Shield too, so they'll be sure to watch the spacecraft's balance (weight distribution) carefully. We need that rear end pointing prograde and staying put when we want it to.

*sigh* Money pit. Absolute Money Pit. I could have designed a better ship using Kerbal Space Program and Autodesk Designer.

 

  • Like 1

Yeah, really. SLS/Orion is really just a dog-and-pony show, now. Something for NASA to do "in the meantime" so that the Senate Science Committee has something to complain about every year during Budget Hearings. "Create your own entertainment" is the phrase that best comes to mind.

Build SLS -- fine, whatever. At this point, SpaceX and the other NewSpace companies are up to their eyeballs with other projects. The Super-Heavy LV will get some use, certainly -- and customers will buy it, if NASA is in the market to sell rides like Roscosmos does and it's a fantastic way to generate revenue. A Super-Heavy capable of 125t at the high end?! There'll be a line out the door and around the corner for booking flights. They'd have to start up RS-25 production again with all the business; and they'd be able to with all that scratch. Develop a Satellite Dispenser that can carry 16 birds at a time -- heavy, full-size birds -- into GTO at $25m~45m a head, yeah. They'll come running.

Sadly, nobody in the U.S. Government will authorize that scenario, and NASA will be left holding the blame like usual.

  • Like 1

Speaking of pork....this is plain nutty.....

NASA awards new contract for rocket engine development

rs-25-flight-engine-a-1-test-stand-stenn
The new RS-25 engine developed under this contract will have fewer parts and welds and will be certified to a higher operational thrust level. The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays.

NASA selected Aerojet Rocketdyne of Sacramento, California, to restart production of the RS-25 engine for the agency's Space Launch System (SLS), the most powerful rocket in the world, and deliver a certified engine. SLS will use four RS-25 engines to carry the agency's Orion spacecraft and launch explorers on deep space missions, including to an asteroid placed in lunar orbit and ultimately to Mars.

Part of NASA's strategy to minimize costs of developing the SLS rocket was to leverage the assets, capabilities, and experience of the Space Shuttle Program, so the first four missions will be flown using 16 existing shuttle engines that have been upgraded.

Under the $1.16 billion contract, Aerojet Rocketdyne will modernize the space shuttle heritage engine to make it more affordable and expendable for SLS. The contract runs November 2015 and continues through Sept. 30, 2024.

The new RS-25 engine developed under this contract will have fewer parts and welds and will be certified to a higher operational thrust level. The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays.

The contract restarts the firm's production capability including furnishing the necessary management, labor, facilities, tools, equipment and materials required for this effort, implementing modern fabrication processes and affordability improvements, and producing hardware required for development and certification testing.

The contract also allows for a potential future modification that would enable NASA to order six flight engines.

NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the SLS Program for the agency. Engine testing will be performed at NASA's Stennis Space Center in Mississippi and the SLS will launch from NASA's Kennedy Space Center in Florida.

http://www.spacedaily.com/reports/NASA_Awards_Contract_to_Restart_Development_of_Engines_to_Power_Agencys_Journey_to_Mars_999.html

 "to restart production of the RS-25 engine"    implies they have the plans from prior production.

"The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays."     If they did not already have this equipment in house for use on other designs, they are incompetent.

"necessary management, labor, facilities, tools, equipment and materials required for this effort, implementing modern fabrication processes and affordability improvements, and producing hardware required for development and certification testing." as if none of this is present on site.

$ 1.16 billion....to get ready......:s

True...it has been planned for the "throw aways" for some time, but with time, lots, to negotiate a reasonable price for start up and a price for each engine. This is a terrible start up cost, and engine prices, probably to be released much later, will probably be terrible as well....it is surprising what NASA can accomplish with what is left over, with politicians dictating this SLS mess.

And this as well...

Aerojet Rocketdyne Signs $200 Million Contract for CST-100 Starliner Propulsion

HIGHBAY-Boeing_CST100.thumb.jpg.335f5f5b
High Bay of KSC facility used to manufacture Boeing CST-100 spacecraft.

SACRAMENTO, Calif., Nov. 23, 2015 (Aerojet Rocketdyne PR) — Aerojet Rocketdyne, a subsidiary of Aerojet Rocketdyne Holdings, Inc. (NYSE:AJRD), has signed a contract with Boeing valued at nearly $200 million that supports a new era of spaceflight – one that will carry humans to the International Space Station (ISS) from American soil once again. Under its Commercial Crew Transportation Capability (CCtCap) subcontract to Boeing, Aerojet Rocketdyne is completing the design, development, qualification, certification and initial production of the Crew Space Transportation (CST)-100 “Starliner” service module propulsion system.

 

Under the CCtCap contract, Aerojet Rocketdyne will provide seven shipsets of hardware with options for additional shipsets. Each production hardware shipset will include four Launch Abort Engines (LAEs), 24 Orbital Maneuvering and Attitude Control (OMAC) engines, 28 Reaction Control System (RCS) engines, 164 valves, 12 tanks and more than 500 feet of ducts, lines and tubing. Boeing will assemble hardware kits into the service module section of the CST-100 spacecraft at its Commercial Crew and Cargo Processing Facility at NASA’s Kennedy Space Center in Florida. Aerojet Rocketdyne also provides hardware supporting the Qualification Test Vehicle; Service Module hot fire testing, which will take place at White Sands Test Facility in New Mexico; the orbital flight test, which will be launched from Cape Canaveral Air Force Station in Florida; and Pad Abort testing, which will occur at White Sands Missile Range in New Mexico. The CST-100 is scheduled to deliver astronauts to the ISS for NASA, beginning in 2017. 

http://www.parabolicarc.com/2015/11/24/aerojet-rocketdyne-signs-200-million-contract-cst100-starliner-propulsion/#more-56911

I can imagine this as well, will eventually make it back to NASA's wallet.....with poor AR not doing so well.....and Boeing can't/or won't, do this themselves? 

Look's like a race between oldspace vampires trying to beat SpaceX to the ISS.....with a heinz 57 capsule.....:s

A year before Starliner flies they're finally signing the contracts to buy a propulsion systems for it. Figures. Last Minute Larry strikes again. 

/s   It's okay...They'll test it in a wind tunnel along with the abort system....that'll make everyone comfy and safe!

They've tested RS-88 engines on a stand, but that's not the same as a synchronized 4 engine abort sysyem for Starliner - which also has no in-quadrant redundancy. The SuperDraco pods do - if one fails the other can be throttled up and the opposing engines throttled down to balance the thrust.

Previously RS-88 was an option for the small class Bantam launcher, a liquid based LAS for Orion, as well as the the engine for Rocketplane XP -  a modified Learjet spaceplane which would have flown an SS2 style profile.

 

  • Like 1

European Service Module Undergoes Testing

 

ooEuropean_Service_Module.thumb.jpg.bff5

Orion Service Module                          NASA

 

 

Quote

The European Service Module is ESA's contribution to NASA's Orion spacecraft that will send astronauts to the Moon and beyond. It provides electricity, water, oxygen and nitrogen as well as keeping the spacecraft at the right temperature and on course.

The cylindrical module is unpressurised and 4 m long, including the main engine and tanks for gas and propellant. During launch it is held in place by the Spacecraft Adapter and is connected to the capsule where the astronauts are by the Crew Module Adapter.

The main body of the service module is around 2 m high but its main engine, the Orbital Maneuvering System Engine, extends into the Spacecraft Adapter. Likewise, some of the equipment in ESA's service module protrudes into the Crew Module Adapter.

During launch the service module fits into a 5.2 m-diameter housing. Once Orion is above the atmosphere and the rocket fairing is jettisoned, the service module's solar array unfolds to span 19 m.

The spacecraft resembles ESA's Automated Transfer Vehicle, from which it evolved. Five Automated Transfer Vehicles delivered supplies to the International Space Station and helped to keep the outpost in orbit.

Three types of engine push Orion to its destination and can turn it in all directions to align the spacecraft as needed.

Inside the Service Module, large tanks hold fuel as well consumables for the astronauts: oxygen, nitrogen and water.

Radiators and heat exchangers keep the astronauts and equipment at a comfortable temperature, while the module's structure is the backbone of the entire vehicle, like a car chassis.

The European Service Module is built by main contractor Airbus Defence and Space, with many companies all over Europe supplying components. The final product is assembled in Europe before being shipped to NASA in the USA.

http://spaceref.com/orion-1/european-service-module-undergoes-testing.html

 

In depth article at this link.....

http://www.nasaspaceflight.com/2015/12/nasa-testing-orions-european-service-module/

:)

  • 1 month later...

NASA Safety Panel Worries about Schedule Pressure on Exploration Programs

 

shiny-Orion-879x485.thumb.jpg.e2e17a82b0

The ASAP report warns of several concerns with Orion, including its heat shield and life support system, that could create safety issues if NASA tries to keep the first crewed mission on a schedule for launch in 2021. Credit: NASA

 

Quote

WASHINGTON — An independent safety panel warns that “a continuing and unacknowledged accretion of risk” in NASA’s human space exploration programs, caused by schedule pressures and flat funding, could put crews on future missions in jeopardy.

 

NASA’s Aerospace Safety Advisory Panel (ASAP), in its annual report published Jan. 13, stated it has growing concerns about a variety of issues in the development of the Space Launch System and Orion spacecraft that result in “an apparent erosion of safety” in those programs.

 

“Over the past year, the Panel has noted a continuing and unacknowledged accretion of risk in space flight programs that we believe has the potential to significantly impact crew safety and the safe execution of human space missions,” the report stated. “The Panel’s concern is not the result of singular action but the accumulated impact of decisions made and risks assumed — either explicitly or tacitly, in small or large steps — that have mounted up and led to an apparent erosion of safety.”

 

One specific area of concern ASAP raised in its report is the schedule for Exploration Mission 2 (EM-2), the second flight of the SLS and the first intended to carry a crew. In September, NASA announced that mission had a 70-percent chance of being ready for launch by April 2023, but that NASA would continue to work towards a launch in 2021, as originally scheduled.

 

ASAP criticized that approach. “NASA’s internal direction to the programs is to work to a 2021 EM-2 launch date, which has a schedule confidence level close to zero at requested funding levels,” the report stated, adding that NASA appeared to be making “safety trade-offs” to make that date.

The report cited several specific issues with SLS and Orion development and planning for the EM-2 mission, including development of a new SLS upper stage called the Exploration Upper Stage and testing of the life support system in Orion on that mission. The report suggested some of those concerns could be eased if NASA kept Orion in Earth orbit during that mission, rather than go into cislunar space as currently planned.

 

“This decision,” the report said of NASA’s current EM-2 plans, “reflects an aggressive development plan that takes the Exploration System from qualification testing to integrated human operations in cislunar space in just two missions.”

 

Other issues raised by ASAP include revisions to a planned in-flight abort test of Orion, changes to the spacecraft’s heat shield and “zero fault tolerant” systems in Orion’s service module, such as propellant valves, that could result in catastrophic failures of the overall spacecraft.

 

ASAP noted that SLS and Orion have received more money from Congress than what NASA has requested in recent years, but that a flat funding profile has contributed to development issues the panel found. “This distribution of resources reflects one more typically observed in ‘level-of-effort’ programs rather than a budget constructed to achieve the needed design efforts of a major program’s discrete and integrated requirements,” the report stated.

 

ASAP, which in past years has been critical of NASA’s commercial crew program, was more supportive of it in this year’s report. The panel cited “substantial improvement in openness and interaction” with program management, a concern it raised in its 2014 report. It also endorsed keeping two companies in the program, despite budget pressures.

 

However, ASAP warned that “significant challenges” still exist for the commercial crew program and the two companies, Boeing and SpaceX, currently developing crew vehicles. The panel concluded there is “a high likelihood of delays to the first test flights” scheduled for 2017, citing ongoing delays in completing reviews of the companies’ plans to certify their vehicles for carrying NASA astronauts.

 

“The Panel’s concern is that over time, schedule or budget pressure — or both — will lead the [NASA commercial crew] Program Office to accept more risk than desirable for crew and mission safety,” the report stated.

 

ASAP also cast a skeptical eye on NASA’s overall plan for sending humans to Mars, known by the agency as the “Journey to Mars.” The panel criticized a lack of technical details and mission architectures in a NASA report released in October about the Journey to Mars. Providing more details, the panel argued, “would go a long way toward gaining the needed support from future administrations, the Congress, and the general public.”

“If not,” the panel added, “then perhaps NASA should be working on a different mission, or at least using a different approach for the current mission.”

http://spacenews.com/nasa-safety-panel-worries-about-schedule-pressure-on-exploration-programs/

 

Yes...SLS got slammed...but at least they eased up on commercial crew....:)

  • 2 weeks later...

Lockheed says Orion is on track for fall 2018, meaning any slip takes it into 2019. No meat bags on board until 2023-ish, but said slips means 2024-2025.  

 

Also, for SpaceX's BFS to land on Mars in 2025 it would have to launch around November 2024 (optimum for that synod), meaning it could fly people before Orion.

 

/sigh

 

http://spacenews.com/lockheed-says-orion-still-on-schedule-for-2018-mission/

  • Like 1

Oh good grief. Kill it already. They'll be testing FX, FHX and BFR by then. 2024-2025 ... sheesh.

 

It's LH/M -- of course it's going to slip to 2025. They're gonna milk Bessie for all she's worth just to get the money.

 

And is there really a reason that damned SM is the width it is?? I mean, honestly. Widen that [bleeping] thing already. Get some real "Service" out of that "Service Module", you hacks. It's not like there's a design purpose for it to be that skinny. It looks like you're balancing a Badminton cone on the end of a chopped toilet paper tube. Yikes.

  • Like 1
  • 1 month later...

Oh, brother

 

NASA OIG Audit of the Spaceport Command and Control System for SLS and Orion

 

Status Report From: NASA Office of Inspector General 

 

Posted: Monday, March 28, 2016

 

WHY WE PERFORMED THIS AUDIT

 

NASA's Ground Systems Development and Operations (GSDO) Program is responsible for preparing the Kennedy Space Center (Kennedy) to launch the next generation of rockets and spacecraft, including the Space Launch System (SLS) and Orion Multi-Purpose Crew Vehicle (Orion) NASA plans to use for deep space exploration. To accomplish this mission, the GSDO Program must move vehicles to launch pads, manage and operate the equipment required to connect spacecraft with rockets, and send the integrated vehicles into space. As part of this effort, the GSDO Program is developing the Spaceport Command and Control System (SCCS) a software system that will control pumps, motors, valves, power supplies, and other ground equipment; record and retrieve data from systems before and during launch; and monitor the health and status of spacecraft as they prepare for and launch. To create the SCCS, NASA is writing a large amount of computer code to "glue" together multiple existing software products or, in some cases, the parts of those products the Agency deems most effective for its purposes.

 

In the past, NASA has experienced difficulties with similar large, complex software development efforts. For example, between 1995 and 2002, the Agency spent more than $500 million on two separate attempts to update command and control software at Kennedy. Both efforts failed to meet their objectives and were substantially scaled back or cancelled prior to completion.

 

In this audit we examined whether NASA is effectively managing the SCCS software development effort. To complete this objective, we performed work at Kennedy, interviewed GSDO Program officials and commercial companies involved with command and control software, and reviewed various studies concerning the SCCS, Federal laws, and NASA policies.

 

WHAT WE FOUND

 

The SCCS development effort has significantly exceeded initial cost and schedule estimates. Compared to fiscal year 2012 projections, development costs have increased approximately 77 percent to $207.4 million and the release of a fully operational version has slipped by 14 months from July 2016 to September 2017. In addition, several planned capabilities have been deferred because of cost and timing pressures, including the ability to automatically detect the root cause of specific equipment and system failures. Without this information, it will be more difficult for controllers and engineers to quickly diagnose and resolve issues. Although NASA officials believe the SCCS will operate safely without these capabilities, they acknowledge the reduced capability could affect the ability to react to unexpected issues during launch operations and potentially impact the launch schedule for the combined SLS-Orion system.

 

The root of these issues largely results from NASA's implementation of its June 2006 decision to integrate multiple products or, in some cases, parts of products rather than developing software in-house or buying an off-the-shelf product. Writing computer code to "glue" together disparate products has turned out to be more complex and expensive than anticipated. As of January 2016, Agency personnel had developed 2.5 million lines of "glue-ware," with almost two more years of development activity planned. In comparison, NASA reengineered the Hubble Space Telescope command and control system with approximately 500,000 lines of "glue-ware" code.

 

Audit of the Spaceport Command and Control System March28,2016 IG-16-015 (A-15-008-00)SCCS Project managers told us the decision to develop SCCS in this manner was motivated by several factors. Managers did not want to rely on a single company's software because if that company encountered financial difficulties or stopped providing technical support NASA's space exploration efforts could be negatively impacted. In addition, at the time the decision was made, managers believed the effort to integrate the various software products would not be overly time-consuming or technically complex. While that decision may have been reasonable based on what managers knew at the time, it is now clear they underestimated the complexity of the software integration activities that would be required.

 

In the past, NASA has encountered difficulties with large and complex command and control software development efforts, failing on two occasions to meet expected requirements despite spending more than $500 million. In something of a repeat of this pattern, the SCCS development effort is more than 1 year behind schedule and significantly over cost, and several planned software capabilities have been deferred.

 

NASA made its decision regarding the SCCS software architecture nearly 10 years ago, but in our view this may no longer be the most prudent course of action given significant advances in commercial command and control software over that time. For example, the two companies under contract with NASA to deliver supplies to the International Space Station Orbital Sciences Corporation and Space Exploration Technologies both use commercial software products to accomplish their missions. In our judgment, the GSDO Program's reluctance to change course reflects a cultural legacy at NASA of over-optimism and over-promising what the Agency can achieve in a specific timeframe.

 

WHAT WE RECOMMENDED

 

In a draft of this report, we recommended the Associate Administrator for Human Exploration and Operations commission an independent assessment to evaluate the status of the SCCS software development effort and determine the necessary steps to reduce the risk of further cost, schedule, and performance issues, including consideration of acquiring commercial command and control software to replace some or all of the system currently under development.

NASA agreed to conduct an independent assessment of the command and control system once software for Exploration Mission-1 the first launch of the combined SLS-Orion system scheduled for November 2018 is successfully delivered. We consider management's plan responsive to our recommendation. Therefore, the recommendation is resolved and will be closed upon completion and verification of the proposed corrective action.
// end //

  • Like 3
  • 1 month later...

Whats wrong with this picture?

 

NASA didn't ask Congress for the money to build the Exploration Upper Stage, and they stopped work on the ICPS upper stage, so SLS has no upper stage. None. Zip. Nada. Even so, NASA still claims they'll make the Sept. 2018 launch date. 

 

It's enough to make a sentient being cry.

 

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

3 hours ago, DocM said:

Whats wrong with this picture?

 

NASA didn't ask Congress for the money to build the Exploration Upper Stage, and they stopped work on the ICPS upper stage, so SLS has no upper stage. None. Zip. Nada. Even so, NASA still claims they'll make the Sept. 2018 launch date. 

 

It's enough to make a sentient being cry.

 

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

Yes...I read that....

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

 

then wandered over to this....

http://www.spacedaily.com/reports/Thornton_leads_upgrade_of_ground_special_power_for_Orion_999.html

 

then this....

http://nasawatch.com/archives/2016/05/nasa-forgot-to.html

 

then did this.....

:s

 

// as a side note, could they mean that they "stopped the man rated work" but are continuing with non rated? It also took an employee to tell them about the electrical systems available, on something they purchased to specification.....this is shaping up to be a race like this.....

 

giphy.gif

 

:D

Yep, makes one wonder if in fact NASA is abandoning the Man-rated portion of the SLS design, and will use it instead for non-manned missions; and will leave the Manned Missions to Boeing, LH/M and SpaceX.

 

Interesting development.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Onkyo Dolby Atmos AV receivers are really solid deals by Sayan Sen Recently we covered great deals on several soundbar models from the likes of Sony, JBL, Samsung and others for really good prices (the lowest in several months). Aside from that we also reported on the Edifier S3000MKII, a hi-fi two-way bookshelf monitor that's available for only $800. Today we bring a list of AV receivers from Onkyo that are available at great prices including the Onkyo NR7100, RZ30, and 8470 (purchase links under the specs table down below). The Onkyo TX-NR7100 and Onkyo TX-RZ30 are both 9.2-channel AV receivers designed for immersive home theater setups but they occupy slightly different tiers within Onkyo’s lineup with the RZ30 positioned as the more advanced model. The TX-NR7100 is a THX Certified 9.2-channel receiver offering up to 100 W per channel (8 ohms, 2 channels driven). It supports Dolby Atmos, DTS:X, and IMAX Enhanced formats, with flexible configurations such as 5.1.4 or 7.1.2 speaker layouts. A key highlight is its built-in Dirac Live Room Correction which should help optimize sound based on your room and its acoustics. In comparison, both models share several core capabilities though the RZ30 is geared toward enthusiasts seeking more precise calibration and system flexibility, while the NR7100 is positioned as a slightly more accessible, value-focused option with strong all-round performance. The technical specs of the RZ30 and NR7100 9.2 AVRs are given in the table below: Specification Onkyo TX-RZ30 Onkyo TX-NR7100 Power Output (FTC, 2ch driven) ~100 W/ch (8Ω, 20Hz–20kHz, 0.08% THD) 100 W/ch (8Ω, 20Hz–20kHz, 0.08% THD) Dynamic / Peak Power 9 × 170 W (6Ω, 1kHz, 1% THD, 1ch driven) 220 W/ch (6Ω, 1kHz, 10% THD, 1ch driven) Frequency Response 5 Hz – 100 kHz (+1/-3 dB) 10 Hz – 100 kHz (+1/-3 dB) THD 0.08% 0.08% Room Correction Dirac Live (full bandwidth) Dirac Live (with AccuReflex support) Immersive Audio Dolby Atmos, DTS:X, IMAX Enhanced Dolby Atmos, DTS:X, IMAX Enhanced Speaker Layout Support Up to 7.2.2 / 5.2.4 / 9.2 processing Up to 7.2.4 / 5.2.4 / 9.2 processing HDMI Inputs / Outputs 6 inputs / 2 outputs (eARC) 6 inputs / 2 outputs (Main + Sub/Zone 2) HDMI 2.1 Support 8K/60, 4K/120, VRR, ALLM, QFT, DSC, eARC 8K/60, 4K/120, VRR, ALLM, QFT, DSC, eARC Video Formats HDR10+, Dolby Vision, HDCP 2.3 HDR10+, Dolby Vision, HDCP 2.3 Streaming / Network Wi-Fi, AirPlay 2, Chromecast, Bluetooth, DTS Play-Fi Wi-Fi, AirPlay 2, Chromecast, Bluetooth, DTS Play-Fi Get them at the links below: Onkyo TX-RZ30 9.2-Channel AV Receiver: $797.00 (Sold and shipped by Electronic Expo) Onkyo TX-NR7100 9.2-Channel AV Receiver: $699.00 (Sold and shipped by Adorma) Onkyo TX-8470 2 Ch Stereo Receiver: $449.00 (Sold and Shipped by Adorma) Good to know This Amazon deal is U.S. specific, and not available in other regions unless specified. We only use first-party seller links or authorized dealer links (at the time of article publishing); ensure that you purchase from such links only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases.
    • A different thing with Russia. When you say is it better, depends on things. It is better that we don't have the E.U making rules and laws that have nothing to do with them. Is the trading part better? No, that is really mucked up, but then we knew that was going to happen and we would have make agreements, like we do with other parts of the world. Freedom of movement is certainly better, but could be improved, we still need more control over our borders. do you live in the U.K?
    • So what am I quoting from them? I never listened to what Farage or his cronies said. I wanted the U.K to leave the E.u years before the referendum and it had nothing to do with Farage and his cronies. So what country do you live in? Did we work much better together? We were always at logger heads with the E.U because we disagreed with them so much. Maggie was always on at them. I would have thought the E.U was glad to get rid of us as we stopped the integration or made it a two tier. Now without us they can integrate more. I would not have voted out if it was just a trading block and we can still work together on somethings.
    • MPC-BE 1.9.0 by Razvan Serea Media Player Classic - BE is a free and open source audio and video player for Windows. Media Player Classic - BE is based on the original "Media Player Classic" project (Gabest) and "Media Player Classic Home Cinema" project (Casimir666), contains additional features and bug fixes. The BE mod (Black Edition Mod) is a skinned version of Media Player Classic Home Cinema, much better looking than the plain old MPC. MPC-BE 1.9.0 changelog: Splitters Fixed crashes in some situations. AudioSplitter Added support for the RF64 format. Fixed reading of channel layout for some WavPack files. Added support for ID3 tags for Wave64 files. Unknown Wave64 chunks are now ignored. AviSplitter Added support for 'y408' video. Improved support for 'HEVC' video. FLVSplitter Added support for VVC video. MP4Splitter Improved handling of corrupted files. MatroskaSplitter Expanded support for V_UNCOMPRESSED video codecs. Fixed support for frame rotation (ProjectionPoseRoll). Improved support for "V_MS/VFW/FOURCC / HEVC". MpcDvdVideoDecoder Fixed conversion to YUY2. Fixed display of menus for some DVD-Videos. RoQVideoDecoder Output in NV12 and YV12 formats is allowed. Full range is used. MPC Video Decoder RGB32 format will be output as a top-down bitmap by default. Added support for the "IID_MediaSideDataDOVIMetadataV2" interface. Removed support for the deprecated "IID_MediaSideDataDOVIMetadata" interface. Fixed retrieving the name of the video adapter when using NVDEC. Fixed crashes in some situations. MPC Video Converter Added support for AYUV video format. MpcAudioRenderer Improved input format validation. Optimized retrieval of supported formats for exclusive mode. Added the "Keep audio device active when paused" setting. Fixed crashes and freezes in various situations. Subtitles Added the ability to open the properties of an external subtitle renderer in the "Subtitles" settings panel. Fixed external subtitle connections for VSFilter. Fixed a crash when rendering PGS/SUP subtitles when using AVX2. YouTube Improved support for yt-dlp. The built-in YouTube parser is no longer used. Player The HTTP read strategy has been changed. If the playlist contains one entry, more key combinations can be used to control the player (jump through chapters, adjust volume). Improved support for reading ASX playlists. The translation of the MediaInfo report for Chinese, Korean and Japanese has been removed. Added blocking of 32-bit filter "PICVideo Lossless JPEG Decompressor" (pvljpg20.dll), because it crashes. Added blocking of the system filter "AVI Decompressor", which will eliminate the crash of VFW codecs. Fixed a rare crash when using the "/slave" key. Fixed a crash when getting a list of fonts for OSD. Added the ability to load an external audio file using hotkeys. Fixed opening a network path starting with \?\UNC. The "Determine duration when adding" playlist setting now works for YouTube video URLs. The "Online media services" settings panel has been redesigned. Added a "Merge files using FFmpeg" option to the file saving dialog. This option is activated when playing multiple streams obtained using yt-dlp. Added loading of local .dpl playlists ("DAUMPLAYLIST"). Fixed a hang when the user closes the player during the URL opening process. Various interface fixes. Installer Updated MPC Video Renderer 0.10.5. Updated MPC Script Source 0.2.17. Added MPC Image Source 0.3.6. Translations Updated Japanese translation (by tsubasanouta). Updated Chinese (Traditional) and Dutch translation (by beter). Updated Romanian translation (by Andrei Miloiu). Updated Hungarian translation (by mickey). Updated Turkish translation (by cmhrky). Updated German translation (by Klaus1189). Updated Chinese (Simplified) translation (by wushantao). Updated Italian translation (by mapi68). Updated Korean translation (by Hackjjang). Updated Chinese (Traditional) (by udfbe). Updated libraries dav1d 1.5.3-6-g04b69f9; ffmpeg n8.2-dev-1857-g4653e68aab; libpng git-v1.6.55-9-g7d52a8087; Little-CMS git-lcms2.18-26-gf739cda; MediaInfo git-v26.05-38-g702c9b7fd; ZenLib git-v0.4.41-91-g073f297; zlib 1.3.2. Download: MPC-BE 64-bit | Portable MPC-BE 64-bit | ~20.0 MB (Open Source) Download: MPC-BE 32-bit | Portable MPC-BE 32-bit Link: Media Player Classic - BE Home Page Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • Apple reportedly looks to blacklisted Chinese memory chips as RAM prices climb by Karthik Mudaliar Image via Apple Apple is reportedly trying to get a clearance from the Trump administration to buy memory from ChangXin Memory Technologies (CXMT) to get some relief from soaring DRAM prices. As per a report by the Financial Times, Apple approached the Commerce Department more than a month ago and also spoke to other officials and allies in Washington. For starters, CXMT is a company that's already been placed on the Pentagon's list of Chinese military companies. The Chinese company is the country's top DRAM maker. For Apple, the timing is certainly awkward but not surprising. Tim Cook had recently warned that Apple would have to raise prices because AI companies are buying up large amounts of memory for data centers, and just like that, Apple raised MacBook and iPad prices. Micron also recently revealed that customers have committed billions of dollars to secure memory supply years in advance, which shows us how aggressive securing infrastructure has become. This gives suppliers such as Samsung, SK Hynix, and Micron more leverage, while pushing hardware makers to look for alternatives. CXMT is one of those alternatives, but not the simplest one. Apple has spent many years trying to diversify parts of its supply chain away from China, especially for final assembly, while still depending heavily on Chinese manufacturing and suppliers. Even domestic brands from China are moving towards CXMT and YMTC instead of relying on Samsung, Micron, and SK Hynix. For Apple, though, it would invite more scrutiny than local Chinese companies. For now, this is more like a lobbying effort rather than a confirmed supply deal. There's no official statement from either of the parties. What is clearer, though, is the pressure behind such a request. AI demand has certainly made hardware a bottleneck, and companies are trying everything they can to bring things back to normal, even if that means making politically sensitive choices. Source: Financial Times
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      498
    2. 2
      +Edouard
      227
    3. 3
      PsYcHoKiLLa
      149
    4. 4
      Steven P.
      75
    5. 5
      FloatingFatMan
      70
  • Tell a friend

    Love Neowin? Tell a friend!