Recommended Posts

Arrrgh. Where do I begin ...

- That "pretty, heat-reflective, metallic coating" is completely unnecessary. All they're doing is adding weight and that weight will throw off the balance of the spacecraft, which is now balanced properly (not top-heavy) after the Engineers & Laborers building the damned thing just trimmed 20% of the weight just by doing some smart ... well, Engineering. The spacecraft was already designed to withstand the reentry temperatures on the outer skin iirc via a circulatory liquid cooling system like the ISS has. What's the matter, the liquid cooling system didn't scale properly? The composite material that the outer shell of the craft is made out of / that was applied to it didn't work either? Good grief, don't you people test this s**t before committing it to a design?

- Tiles in place of a Heat Shield ... okay. Long as SpaceX is supplying them and the personnel to install/repair/replace them after each mission. They're much lighter than a Heat Shield too, so they'll be sure to watch the spacecraft's balance (weight distribution) carefully. We need that rear end pointing prograde and staying put when we want it to.

*sigh* Money pit. Absolute Money Pit. I could have designed a better ship using Kerbal Space Program and Autodesk Designer.

 

  • Like 1

Yeah, really. SLS/Orion is really just a dog-and-pony show, now. Something for NASA to do "in the meantime" so that the Senate Science Committee has something to complain about every year during Budget Hearings. "Create your own entertainment" is the phrase that best comes to mind.

Build SLS -- fine, whatever. At this point, SpaceX and the other NewSpace companies are up to their eyeballs with other projects. The Super-Heavy LV will get some use, certainly -- and customers will buy it, if NASA is in the market to sell rides like Roscosmos does and it's a fantastic way to generate revenue. A Super-Heavy capable of 125t at the high end?! There'll be a line out the door and around the corner for booking flights. They'd have to start up RS-25 production again with all the business; and they'd be able to with all that scratch. Develop a Satellite Dispenser that can carry 16 birds at a time -- heavy, full-size birds -- into GTO at $25m~45m a head, yeah. They'll come running.

Sadly, nobody in the U.S. Government will authorize that scenario, and NASA will be left holding the blame like usual.

  • Like 1

Speaking of pork....this is plain nutty.....

NASA awards new contract for rocket engine development

rs-25-flight-engine-a-1-test-stand-stenn
The new RS-25 engine developed under this contract will have fewer parts and welds and will be certified to a higher operational thrust level. The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays.

NASA selected Aerojet Rocketdyne of Sacramento, California, to restart production of the RS-25 engine for the agency's Space Launch System (SLS), the most powerful rocket in the world, and deliver a certified engine. SLS will use four RS-25 engines to carry the agency's Orion spacecraft and launch explorers on deep space missions, including to an asteroid placed in lunar orbit and ultimately to Mars.

Part of NASA's strategy to minimize costs of developing the SLS rocket was to leverage the assets, capabilities, and experience of the Space Shuttle Program, so the first four missions will be flown using 16 existing shuttle engines that have been upgraded.

Under the $1.16 billion contract, Aerojet Rocketdyne will modernize the space shuttle heritage engine to make it more affordable and expendable for SLS. The contract runs November 2015 and continues through Sept. 30, 2024.

The new RS-25 engine developed under this contract will have fewer parts and welds and will be certified to a higher operational thrust level. The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays.

The contract restarts the firm's production capability including furnishing the necessary management, labor, facilities, tools, equipment and materials required for this effort, implementing modern fabrication processes and affordability improvements, and producing hardware required for development and certification testing.

The contract also allows for a potential future modification that would enable NASA to order six flight engines.

NASA's Marshall Space Flight Center in Huntsville, Alabama, manages the SLS Program for the agency. Engine testing will be performed at NASA's Stennis Space Center in Mississippi and the SLS will launch from NASA's Kennedy Space Center in Florida.

http://www.spacedaily.com/reports/NASA_Awards_Contract_to_Restart_Development_of_Engines_to_Power_Agencys_Journey_to_Mars_999.html

 "to restart production of the RS-25 engine"    implies they have the plans from prior production.

"The new engine benefits from improvements in materials and manufacturing techniques such as five-axis milling machines, 3-D manufacturing and digital X-rays."     If they did not already have this equipment in house for use on other designs, they are incompetent.

"necessary management, labor, facilities, tools, equipment and materials required for this effort, implementing modern fabrication processes and affordability improvements, and producing hardware required for development and certification testing." as if none of this is present on site.

$ 1.16 billion....to get ready......:s

True...it has been planned for the "throw aways" for some time, but with time, lots, to negotiate a reasonable price for start up and a price for each engine. This is a terrible start up cost, and engine prices, probably to be released much later, will probably be terrible as well....it is surprising what NASA can accomplish with what is left over, with politicians dictating this SLS mess.

And this as well...

Aerojet Rocketdyne Signs $200 Million Contract for CST-100 Starliner Propulsion

HIGHBAY-Boeing_CST100.thumb.jpg.335f5f5b
High Bay of KSC facility used to manufacture Boeing CST-100 spacecraft.

SACRAMENTO, Calif., Nov. 23, 2015 (Aerojet Rocketdyne PR) — Aerojet Rocketdyne, a subsidiary of Aerojet Rocketdyne Holdings, Inc. (NYSE:AJRD), has signed a contract with Boeing valued at nearly $200 million that supports a new era of spaceflight – one that will carry humans to the International Space Station (ISS) from American soil once again. Under its Commercial Crew Transportation Capability (CCtCap) subcontract to Boeing, Aerojet Rocketdyne is completing the design, development, qualification, certification and initial production of the Crew Space Transportation (CST)-100 “Starliner” service module propulsion system.

 

Under the CCtCap contract, Aerojet Rocketdyne will provide seven shipsets of hardware with options for additional shipsets. Each production hardware shipset will include four Launch Abort Engines (LAEs), 24 Orbital Maneuvering and Attitude Control (OMAC) engines, 28 Reaction Control System (RCS) engines, 164 valves, 12 tanks and more than 500 feet of ducts, lines and tubing. Boeing will assemble hardware kits into the service module section of the CST-100 spacecraft at its Commercial Crew and Cargo Processing Facility at NASA’s Kennedy Space Center in Florida. Aerojet Rocketdyne also provides hardware supporting the Qualification Test Vehicle; Service Module hot fire testing, which will take place at White Sands Test Facility in New Mexico; the orbital flight test, which will be launched from Cape Canaveral Air Force Station in Florida; and Pad Abort testing, which will occur at White Sands Missile Range in New Mexico. The CST-100 is scheduled to deliver astronauts to the ISS for NASA, beginning in 2017. 

http://www.parabolicarc.com/2015/11/24/aerojet-rocketdyne-signs-200-million-contract-cst100-starliner-propulsion/#more-56911

I can imagine this as well, will eventually make it back to NASA's wallet.....with poor AR not doing so well.....and Boeing can't/or won't, do this themselves? 

Look's like a race between oldspace vampires trying to beat SpaceX to the ISS.....with a heinz 57 capsule.....:s

A year before Starliner flies they're finally signing the contracts to buy a propulsion systems for it. Figures. Last Minute Larry strikes again. 

/s   It's okay...They'll test it in a wind tunnel along with the abort system....that'll make everyone comfy and safe!

They've tested RS-88 engines on a stand, but that's not the same as a synchronized 4 engine abort sysyem for Starliner - which also has no in-quadrant redundancy. The SuperDraco pods do - if one fails the other can be throttled up and the opposing engines throttled down to balance the thrust.

Previously RS-88 was an option for the small class Bantam launcher, a liquid based LAS for Orion, as well as the the engine for Rocketplane XP -  a modified Learjet spaceplane which would have flown an SS2 style profile.

 

  • Like 1

European Service Module Undergoes Testing

 

ooEuropean_Service_Module.thumb.jpg.bff5

Orion Service Module                          NASA

 

 

Quote

The European Service Module is ESA's contribution to NASA's Orion spacecraft that will send astronauts to the Moon and beyond. It provides electricity, water, oxygen and nitrogen as well as keeping the spacecraft at the right temperature and on course.

The cylindrical module is unpressurised and 4 m long, including the main engine and tanks for gas and propellant. During launch it is held in place by the Spacecraft Adapter and is connected to the capsule where the astronauts are by the Crew Module Adapter.

The main body of the service module is around 2 m high but its main engine, the Orbital Maneuvering System Engine, extends into the Spacecraft Adapter. Likewise, some of the equipment in ESA's service module protrudes into the Crew Module Adapter.

During launch the service module fits into a 5.2 m-diameter housing. Once Orion is above the atmosphere and the rocket fairing is jettisoned, the service module's solar array unfolds to span 19 m.

The spacecraft resembles ESA's Automated Transfer Vehicle, from which it evolved. Five Automated Transfer Vehicles delivered supplies to the International Space Station and helped to keep the outpost in orbit.

Three types of engine push Orion to its destination and can turn it in all directions to align the spacecraft as needed.

Inside the Service Module, large tanks hold fuel as well consumables for the astronauts: oxygen, nitrogen and water.

Radiators and heat exchangers keep the astronauts and equipment at a comfortable temperature, while the module's structure is the backbone of the entire vehicle, like a car chassis.

The European Service Module is built by main contractor Airbus Defence and Space, with many companies all over Europe supplying components. The final product is assembled in Europe before being shipped to NASA in the USA.

http://spaceref.com/orion-1/european-service-module-undergoes-testing.html

 

In depth article at this link.....

http://www.nasaspaceflight.com/2015/12/nasa-testing-orions-european-service-module/

:)

  • 1 month later...

NASA Safety Panel Worries about Schedule Pressure on Exploration Programs

 

shiny-Orion-879x485.thumb.jpg.e2e17a82b0

The ASAP report warns of several concerns with Orion, including its heat shield and life support system, that could create safety issues if NASA tries to keep the first crewed mission on a schedule for launch in 2021. Credit: NASA

 

Quote

WASHINGTON — An independent safety panel warns that “a continuing and unacknowledged accretion of risk” in NASA’s human space exploration programs, caused by schedule pressures and flat funding, could put crews on future missions in jeopardy.

 

NASA’s Aerospace Safety Advisory Panel (ASAP), in its annual report published Jan. 13, stated it has growing concerns about a variety of issues in the development of the Space Launch System and Orion spacecraft that result in “an apparent erosion of safety” in those programs.

 

“Over the past year, the Panel has noted a continuing and unacknowledged accretion of risk in space flight programs that we believe has the potential to significantly impact crew safety and the safe execution of human space missions,” the report stated. “The Panel’s concern is not the result of singular action but the accumulated impact of decisions made and risks assumed — either explicitly or tacitly, in small or large steps — that have mounted up and led to an apparent erosion of safety.”

 

One specific area of concern ASAP raised in its report is the schedule for Exploration Mission 2 (EM-2), the second flight of the SLS and the first intended to carry a crew. In September, NASA announced that mission had a 70-percent chance of being ready for launch by April 2023, but that NASA would continue to work towards a launch in 2021, as originally scheduled.

 

ASAP criticized that approach. “NASA’s internal direction to the programs is to work to a 2021 EM-2 launch date, which has a schedule confidence level close to zero at requested funding levels,” the report stated, adding that NASA appeared to be making “safety trade-offs” to make that date.

The report cited several specific issues with SLS and Orion development and planning for the EM-2 mission, including development of a new SLS upper stage called the Exploration Upper Stage and testing of the life support system in Orion on that mission. The report suggested some of those concerns could be eased if NASA kept Orion in Earth orbit during that mission, rather than go into cislunar space as currently planned.

 

“This decision,” the report said of NASA’s current EM-2 plans, “reflects an aggressive development plan that takes the Exploration System from qualification testing to integrated human operations in cislunar space in just two missions.”

 

Other issues raised by ASAP include revisions to a planned in-flight abort test of Orion, changes to the spacecraft’s heat shield and “zero fault tolerant” systems in Orion’s service module, such as propellant valves, that could result in catastrophic failures of the overall spacecraft.

 

ASAP noted that SLS and Orion have received more money from Congress than what NASA has requested in recent years, but that a flat funding profile has contributed to development issues the panel found. “This distribution of resources reflects one more typically observed in ‘level-of-effort’ programs rather than a budget constructed to achieve the needed design efforts of a major program’s discrete and integrated requirements,” the report stated.

 

ASAP, which in past years has been critical of NASA’s commercial crew program, was more supportive of it in this year’s report. The panel cited “substantial improvement in openness and interaction” with program management, a concern it raised in its 2014 report. It also endorsed keeping two companies in the program, despite budget pressures.

 

However, ASAP warned that “significant challenges” still exist for the commercial crew program and the two companies, Boeing and SpaceX, currently developing crew vehicles. The panel concluded there is “a high likelihood of delays to the first test flights” scheduled for 2017, citing ongoing delays in completing reviews of the companies’ plans to certify their vehicles for carrying NASA astronauts.

 

“The Panel’s concern is that over time, schedule or budget pressure — or both — will lead the [NASA commercial crew] Program Office to accept more risk than desirable for crew and mission safety,” the report stated.

 

ASAP also cast a skeptical eye on NASA’s overall plan for sending humans to Mars, known by the agency as the “Journey to Mars.” The panel criticized a lack of technical details and mission architectures in a NASA report released in October about the Journey to Mars. Providing more details, the panel argued, “would go a long way toward gaining the needed support from future administrations, the Congress, and the general public.”

“If not,” the panel added, “then perhaps NASA should be working on a different mission, or at least using a different approach for the current mission.”

http://spacenews.com/nasa-safety-panel-worries-about-schedule-pressure-on-exploration-programs/

 

Yes...SLS got slammed...but at least they eased up on commercial crew....:)

  • 2 weeks later...

Lockheed says Orion is on track for fall 2018, meaning any slip takes it into 2019. No meat bags on board until 2023-ish, but said slips means 2024-2025.  

 

Also, for SpaceX's BFS to land on Mars in 2025 it would have to launch around November 2024 (optimum for that synod), meaning it could fly people before Orion.

 

/sigh

 

http://spacenews.com/lockheed-says-orion-still-on-schedule-for-2018-mission/

  • Like 1

Oh good grief. Kill it already. They'll be testing FX, FHX and BFR by then. 2024-2025 ... sheesh.

 

It's LH/M -- of course it's going to slip to 2025. They're gonna milk Bessie for all she's worth just to get the money.

 

And is there really a reason that damned SM is the width it is?? I mean, honestly. Widen that [bleeping] thing already. Get some real "Service" out of that "Service Module", you hacks. It's not like there's a design purpose for it to be that skinny. It looks like you're balancing a Badminton cone on the end of a chopped toilet paper tube. Yikes.

  • Like 1
  • 1 month later...

Oh, brother

 

NASA OIG Audit of the Spaceport Command and Control System for SLS and Orion

 

Status Report From: NASA Office of Inspector General 

 

Posted: Monday, March 28, 2016

 

WHY WE PERFORMED THIS AUDIT

 

NASA's Ground Systems Development and Operations (GSDO) Program is responsible for preparing the Kennedy Space Center (Kennedy) to launch the next generation of rockets and spacecraft, including the Space Launch System (SLS) and Orion Multi-Purpose Crew Vehicle (Orion) NASA plans to use for deep space exploration. To accomplish this mission, the GSDO Program must move vehicles to launch pads, manage and operate the equipment required to connect spacecraft with rockets, and send the integrated vehicles into space. As part of this effort, the GSDO Program is developing the Spaceport Command and Control System (SCCS) a software system that will control pumps, motors, valves, power supplies, and other ground equipment; record and retrieve data from systems before and during launch; and monitor the health and status of spacecraft as they prepare for and launch. To create the SCCS, NASA is writing a large amount of computer code to "glue" together multiple existing software products or, in some cases, the parts of those products the Agency deems most effective for its purposes.

 

In the past, NASA has experienced difficulties with similar large, complex software development efforts. For example, between 1995 and 2002, the Agency spent more than $500 million on two separate attempts to update command and control software at Kennedy. Both efforts failed to meet their objectives and were substantially scaled back or cancelled prior to completion.

 

In this audit we examined whether NASA is effectively managing the SCCS software development effort. To complete this objective, we performed work at Kennedy, interviewed GSDO Program officials and commercial companies involved with command and control software, and reviewed various studies concerning the SCCS, Federal laws, and NASA policies.

 

WHAT WE FOUND

 

The SCCS development effort has significantly exceeded initial cost and schedule estimates. Compared to fiscal year 2012 projections, development costs have increased approximately 77 percent to $207.4 million and the release of a fully operational version has slipped by 14 months from July 2016 to September 2017. In addition, several planned capabilities have been deferred because of cost and timing pressures, including the ability to automatically detect the root cause of specific equipment and system failures. Without this information, it will be more difficult for controllers and engineers to quickly diagnose and resolve issues. Although NASA officials believe the SCCS will operate safely without these capabilities, they acknowledge the reduced capability could affect the ability to react to unexpected issues during launch operations and potentially impact the launch schedule for the combined SLS-Orion system.

 

The root of these issues largely results from NASA's implementation of its June 2006 decision to integrate multiple products or, in some cases, parts of products rather than developing software in-house or buying an off-the-shelf product. Writing computer code to "glue" together disparate products has turned out to be more complex and expensive than anticipated. As of January 2016, Agency personnel had developed 2.5 million lines of "glue-ware," with almost two more years of development activity planned. In comparison, NASA reengineered the Hubble Space Telescope command and control system with approximately 500,000 lines of "glue-ware" code.

 

Audit of the Spaceport Command and Control System March28,2016 IG-16-015 (A-15-008-00)SCCS Project managers told us the decision to develop SCCS in this manner was motivated by several factors. Managers did not want to rely on a single company's software because if that company encountered financial difficulties or stopped providing technical support NASA's space exploration efforts could be negatively impacted. In addition, at the time the decision was made, managers believed the effort to integrate the various software products would not be overly time-consuming or technically complex. While that decision may have been reasonable based on what managers knew at the time, it is now clear they underestimated the complexity of the software integration activities that would be required.

 

In the past, NASA has encountered difficulties with large and complex command and control software development efforts, failing on two occasions to meet expected requirements despite spending more than $500 million. In something of a repeat of this pattern, the SCCS development effort is more than 1 year behind schedule and significantly over cost, and several planned software capabilities have been deferred.

 

NASA made its decision regarding the SCCS software architecture nearly 10 years ago, but in our view this may no longer be the most prudent course of action given significant advances in commercial command and control software over that time. For example, the two companies under contract with NASA to deliver supplies to the International Space Station Orbital Sciences Corporation and Space Exploration Technologies both use commercial software products to accomplish their missions. In our judgment, the GSDO Program's reluctance to change course reflects a cultural legacy at NASA of over-optimism and over-promising what the Agency can achieve in a specific timeframe.

 

WHAT WE RECOMMENDED

 

In a draft of this report, we recommended the Associate Administrator for Human Exploration and Operations commission an independent assessment to evaluate the status of the SCCS software development effort and determine the necessary steps to reduce the risk of further cost, schedule, and performance issues, including consideration of acquiring commercial command and control software to replace some or all of the system currently under development.

NASA agreed to conduct an independent assessment of the command and control system once software for Exploration Mission-1 the first launch of the combined SLS-Orion system scheduled for November 2018 is successfully delivered. We consider management's plan responsive to our recommendation. Therefore, the recommendation is resolved and will be closed upon completion and verification of the proposed corrective action.
// end //

  • Like 3
  • 1 month later...

Whats wrong with this picture?

 

NASA didn't ask Congress for the money to build the Exploration Upper Stage, and they stopped work on the ICPS upper stage, so SLS has no upper stage. None. Zip. Nada. Even so, NASA still claims they'll make the Sept. 2018 launch date. 

 

It's enough to make a sentient being cry.

 

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

3 hours ago, DocM said:

Whats wrong with this picture?

 

NASA didn't ask Congress for the money to build the Exploration Upper Stage, and they stopped work on the ICPS upper stage, so SLS has no upper stage. None. Zip. Nada. Even so, NASA still claims they'll make the Sept. 2018 launch date. 

 

It's enough to make a sentient being cry.

 

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

Yes...I read that....

http://spacenews.com/nasa-working-towards-september-2018-slsorion-launch/

 

then wandered over to this....

http://www.spacedaily.com/reports/Thornton_leads_upgrade_of_ground_special_power_for_Orion_999.html

 

then this....

http://nasawatch.com/archives/2016/05/nasa-forgot-to.html

 

then did this.....

:s

 

// as a side note, could they mean that they "stopped the man rated work" but are continuing with non rated? It also took an employee to tell them about the electrical systems available, on something they purchased to specification.....this is shaping up to be a race like this.....

 

giphy.gif

 

:D

Yep, makes one wonder if in fact NASA is abandoning the Man-rated portion of the SLS design, and will use it instead for non-manned missions; and will leave the Manned Missions to Boeing, LH/M and SpaceX.

 

Interesting development.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • All these CEOs got the biggest boners thinking about firing employees for AI. Turned out it was just a wet dream.
    • And the fact that the majority of people from Poland are white European Christians while the people you are complaining about in post after post are not is just a coincidence... Every sentence in your post I am replying to is racist nonsense. None of it is actually based on any facts whatsoever. All immigrants are seeking a better life too. It's literally the only reason they would risk everything and leave their homes, families, and homeland. They are working and contributing to the economy too, as you even admit. They get the same benefits your partner did AND that YOU are eligible for as well. That is one of the key things of the EU and a mark of a civilization. That is the definition of a society where everyone is given a chance, treated equally and fairly, and is judged by the content of their character, not their different skin color or which version of ignorant superstitious nonsense their parents lied about as children. Racists around the world said the same things about the Irish and Jews and Poles (like your partner) and...every other immigrant movement over the centuries. What's your family's heritage, by the way? Were your ancestors lied about with racist fearmongering crapola by self-entitled locals the same way as you are now? If someone like that said the same things about all people from Poland, like your partner, would they be right? Or would you want them to judge your partner based on who they actually were, not where they just happened to come from?
    • Again, this is an irrelevant attempt to attack the messenger. The truth does not require any justification.
    • Removed the blue and underline as you did not post a link. This would also  be considered spamming.
    • Why it's almost impossible to produce a smartphone in the United States by Hamid Ganji If you look at the back of some Apple products, you can see the famous phrase “Designed by Apple in California, Assembled in China.” This phrase appears on products from one of the largest smartphone brands in the United States. These products are designed in the U.S., but their manufacturing takes place in China, India, Vietnam, or even Brazil. But why can’t Apple, as one of the largest American tech companies, produce its iPhones on U.S. soil? The idea for this topic came to me after the Trump Foundation launched a smartphone called the T1 and claimed that it was designed and built with American values in mind. However, this claim did not last long, as it was revealed that Trump’s phone was actually a rebranded HTC U24 Pro, with only a gold case and minor internal component changes. You see? Even a phone that is supposed to represent American values is manufactured in China. With a gross domestic product (GDP) exceeding $32 trillion, the United States is currently the world’s largest economy, while China ranks second with around $20 trillion. On the other hand, the United States is by a wide margin the global leader in various technological fields, and American companies spend hundreds of billions of dollars annually on research and development. From Apple and Google to Microsoft, Lockheed Martin, Boeing, and others, American tech and industrial giants lead their foreign competitors in many sectors. The United States also has no shortage of smartphone brands. Apple, Google, and Motorola are among the major brands in the smartphone market, collectively holding a significant share. However, the vast majority of their products are manufactured outside the United States. So why is it that the world’s largest economy, home to the most advanced technology companies and industrial powers, cannot produce a smartphone on its own soil? Let’s explore this question together. Even threats to impose tariffs won’t work After Trump entered the White House as the 47th President of the United States, his administration adopted strict tariff policies. One of these policies was the imposition of a 25% tariff on smartphones manufactured outside the United States. Trump said he “had a little problem” with Apple CEO Tim Cook over producing smartphones outside the U.S. So he thought that threatening a 25% tax on imported phones might force Apple to bring manufacturing back to the United States. “I have long ago informed Tim Cook of Apple that I expect their iPhones that will be sold in the United States of America will be manufactured and built in the United States, not India, or anyplace else,” Trump wrote on Truth Social. Image via The White House Although Apple currently manufactures some of the iPhone’s chips in the United States with TSMC's help, it still shows no willingness to shift full iPhone production to the country. At the time, renowned Apple supply chain analyst Ming-Chi Kuo wrote on X, “In terms of profitability, it’s way better for Apple to take the hit of a 25% tariff on iPhones sold in the US market than to move iPhone assembly lines back to the US.” However, manufacturing a smartphone in the United States is not as easy as it might seem, and many technical and economic barriers are involved. The lack of necessary manufacturing hubs There is a clear reason why many companies prefer to manufacture their products in China. China has established itself as the main global manufacturing hub for international companies, and over the past few decades, large contract manufacturers have emerged there, allowing companies like Apple to outsource production. One such example is Foxconn, which also manufactures some Apple products in India. Building the infrastructure required to produce smartphones in the United States would require tens of billions of dollars in new investment. Factories would need to be built, essential manufacturing equipment would have to be installed, and, most importantly, a skilled workforce capable of operating these systems would need to be recruited and trained. The United States currently lacks the core infrastructure needed to manufacture smartphones, and for this reason, many companies prefer to outsource production to Chinese contractors rather than spend tens of billions of dollars to build that infrastructure, which is significantly more economically efficient. Additionally, building such infrastructure in the United States could take up to a decade, ultimately leading to a significant increase in the product's final price for consumers. Shortage of trained labor in the U.S. compared to China Decades of serving as a global manufacturing hub have allowed China to build a massive talent pool in the production sector that is almost unmatched worldwide. Today, if a company chooses to manufacture its products in China, it can be confident that the workers involved in production have years of experience in their respective roles and are capable of producing high-quality goods with minimal errors. Even if we assume that tens of billions of dollars were invested in building smartphone manufacturing infrastructure in the United States, finding skilled workers would remain highly challenging. Apple CEO Tim Cook visiting the iPhone 6 assembly line in China in 2014. Image: Tim Cook on X In a 2015 interview on CBS’s 60 Minutes, Tim Cook said the main reason Apple isn’t producing in the US is a lack of skills. "China put an enormous focus on manufacturing, in what you and I would call vocational kind of skills. The US over time began to stop having as many vocational kinds of skills. I mean you could take every tool and die maker in the United States and probably put them in the room that we're currently sitting in. In China you would have to have multiple football fields,” Cook said. Also, in 2017, at the Fortune Global Forum in Guangzhou, Cook once again emphasized the importance of highly skilled Chinese workers. “China has moved into very advanced manufacturing, so you find in China the intersection of craftsman kind of skill, and sophisticated robotics and the computer science world. That intersection, which is very rare to find anywhere, that kind of skill, is very important to our business because of the precision and quality level that we like. The thing that most people focus on if they’re a foreigner coming to China is the size of the market, and obviously, it’s the biggest market in the world in so many areas. But for us, the number one attraction is the quality of the people,” Apple CEO said. Higher labor costs in the United States Producing almost any product in the United States is more expensive than in many other countries, and one of the main reasons is the higher cost of labor in the U.S. According to the Bureau of Labor Statistics, median weekly earnings of full-time workers in the United States were $1,235 in the first quarter of 2026. Meanwhile, the average annual salary in China's private sector in 2025 was RMB 71,590 (US$9,961). In many parts of the world, the weekly wage of an American worker is equivalent to several months of income. Another important factor to consider is that in the United States, the workforce capable of working on a smartphone assembly line is highly specialized and therefore commands higher-than-average wages. According to an estimate by Bank of America, producing an iPhone in the U.S. is technically possible, but “iPhone cost can increase 25% purely on higher labor cost in the U.S.” However, this 25% increase applies only if final assembly is performed in the United States while components are still sourced from China or elsewhere. In this case, the price of a base iPhone would rise from $799 to around $1,000. But in another scenario, if Apple were to produce the required components for the iPhone within the United States, production costs could increase by more than 90%. Trump’s dream for a “Made in the USA” iPhone might never come true In a free-market capitalist economy, one of the primary responsibilities of any CEO is to maximize profit. Using Apple as an example, Tim Cook’s role is to maximize the company’s profits so that it can fund research and development for new products and invest in areas such as artificial intelligence, while also keeping shareholders satisfied. Therefore, it is entirely understandable that Apple would choose not to bring its manufacturing back to the United States and instead keep production in countries where labor is cheaper, and products can be manufactured at a lower cost, thereby maximizing its profit margins. What is your opinion about manufacturing smartphones in the United States? If you are an American citizen, would you be willing to pay hundreds of dollars more for a smartphone made domestically in the USA? Let us know in the comments.
  • Recent Achievements

    • Conversation Starter
      jessse3334 earned a badge
      Conversation Starter
    • Reacting Well
      JuvenileDelinquent earned a badge
      Reacting Well
    • One Month Later
      Excellence2025 earned a badge
      One Month Later
    • Week One Done
      Excellence2025 earned a badge
      Week One Done
    • Week One Done
      flexorcist earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      506
    2. 2
      +Edouard
      196
    3. 3
      PsYcHoKiLLa
      153
    4. 4
      Steven P.
      72
    5. 5
      FloatingFatMan
      65
  • Tell a friend

    Love Neowin? Tell a friend!