Recommended Posts

Wow. :no: Kill it. With fire. Whoever thought there was any case for keeping it active no longer has an argument. The entire point of SLS was for Orion's deep space missions ... that's out the window now.

Given 2 launches a year it's 6 Earth-Mars conjunctions, probably over 12 years, to mount some Mars missions?

 

Yeah, that'll work :rolleyes:

 

And Orion is not going to Mars as they used to claim.  It's a crew taxi to and back from a Mars stack assembled in lunar orbit - per the ISS partners plan which is under discussion.

 

 

 

Edited by DocM
  • Like 1
  • 2 weeks later...

The SLS-Orion program is Ugly transitioning to F'ugly.

 

By the time this flies we may have seen at least 1-2 Grey Dragon circumlunar flights, suborbital and orbital ITS test flights, Blue Origin's New Glenn heavy class for which they are developing their SV space ship.

 

Ars....

 

Quote

Senior official: NASA will delay first flight of new SLS rocket until 2019

 

The space agency is now likely to miss Congress' original deadline by three years.

NASA has decided it must delay the maiden flight of its Space Launch System rocket, presently scheduled for November 2018, until at least early 2019. This decision was widely expected due to several problems with the rocket, Orion spacecraft, and ground launch systems. The delay was confirmed in a letter from a NASA official released Thursday by the US Government Accountability Office.
>

 

 

GAO report: PDF....

 

Quote

What GAO Found

 

With less than 2 years until the planned November 2018 launch date for its first exploration mission (EM-1), the National Aeronautics and Space Administrations (NASA) three human exploration programsOrion Multi-Purpose Crew Vehicle (Orion), Space Launch System (SLS), and Exploration Ground Systems (EGS)are making progress on their respective systems, but the EM-1 launch date is likely unachievable as technical challenges continue to cause schedule delays. All three programs face unique challenges in completing development, and each has little to no schedule reserve remaining between now and the EM-1 date, 
meaning they will have to complete all remaining work with little margin for error for unexpected challenges that may arise. The table below lists the remaining schedule reserve for each of the programs.

Schedule Reserve to Exploration Mission 1 for Orion Multi-Purpose Crew Vehicle, Space Launch System, and Exploration Ground Systems Programs.

[Remaining reserves in days]

Exploration Mission-1

Orion Multi-Purpose Crew Vehicle: 0
Space Launch System: 80
Exploration Ground Systems: 28

Source: GAO Analysis of NASA data | GAO-17-414

The programs all face challenges that may impact their remaining schedule reserve. For instance 

 

  •  the Orion programs European Service Module is late and is currently driving the program schedule; 
  •  the SLS program had to stop welding on the core stage which functions as the SLSs fuel tank and structural backbonefor months after identifying low weld strengths. Program officials stated that welding resumed in April 2017 following the establishment of a corrective action plan;
  •  the EGS program is considering performing concurrent hardware installation and testing, which officials acknowledge would increase complexity; and
  •  each program must integrate its own hardware and software individually, after which EGS is responsible for integrating all three programs components into one effort at Kennedy Space Center.

>
>

We'll just leave that here ... no need to say we pretty much called all of this.

 

Other than the joke about the ESM. Frankly that one is just funny, considering that it wasn't even needed for ETF-2 -- unless they were actually serious about putting humans aboard that thing during that flight.

 

/sigh ... too late to cancel it.

  • 2 weeks later...

Reading about the findings with the weld process failures ... 

 

Good thing they caught that in time. Those LH2 tanks would have unzipped as soon as they were put under any kind of a load. GOOD GRIEF. Talk about a kaboom ... and it would have taken the Pad (and likely the plumbing) with it. Yikes.

 

Disaster averted. THIS time around.

https://www.bloomberg.com/news/articles/2017-05-12/nasa-study-warns-against-putting-crew-on-huge-rocket-s-first-flight

 

NASA Study Warns Against Putting Crew On Huge Rockets First Flight

A review ordered by the Trump administration finds costs and scheduling problems.

A NASA working group has concluded after a two-month review that sending astronauts on the first flight of its massive new rocket wouldnt be feasible due to the immense costs of safely accommodating a crew on the planned 2019 mission, the first step in Americas return to human space exploration.
>

 

https://www.nasa.gov/press-release/nasa-holds-media-teleconference-today-on-exploration-mission-1-status

 

NASA Holds Media Teleconference Today on Exploration Mission-1 Status

NASA will provide an update on the status of Exploration Mission-1, the first integrated flight of NASAs Space Launch System (SLS) rocket and Orion spacecraft, during a media teleconference at 3 p.m. EDT today, May 12.

The call will stream live on NASAs website.

The teleconference participants are:

    Acting NASA Administrator Robert Lightfoot

    Associate Administrator of NASAs Human Explorations and Operations Mission Directorate William Gerstenmaier

Listen to todays media teleconference live online at:

https://www.nasa.gov/live

4 hours ago, DocM said:

A review ordered by the Trump administration finds costs and scheduling problems.

A NASA working group has concluded after a two-month review that sending astronauts on the first flight of its massive new rocket wouldnt be feasible due to the immense costs of safely accommodating a crew on the planned 2019 mission, the first step in Americas return to human space exploration.

This is exactly what needed to happen. Some real common sense thrown into this completely unworkable and dangerous gamble that wasn't going to be able to happen until 2019 at the earliest. 

 

Kill this ####### thing with cutting torches and concrete already. Make it sleep with the fishes. Turn it into artificial coral reefs. Let it serve some purpose for the love of all that's decent -- before lives are lost because OldSpace tried to hotshot their way through corner-cutting. 

 

Oh -- and that crack about "the first step in America's return to human space exploration"? I know those weren't your words, @DocM ... but that's just funny, seeing how SpaceX is going to beat 'em by a year or more. Oh wait, they can't possibly count that can they. It's Boeing/LockMart/Aerojet/ATK feeding them the "truth", after all. They're the WWE of Aerospace -- if it ain't theirs then it doesn't exist and if it does it ain't ####. Anything to deflect from the established dialogue.

Edited by Unobscured Vision

$600-$900 million a year to convert EM-1 to crewed.

 

Crew on 1st SLS flight while making SpaceX and Boeing fly 7 un-crewed before flying crews.

 

ASAP and others had not one, not two, but more like 3 cows. Each.

 

Naw, nothing wrong with this picture :whistle:

Yeah. DELIBERATE stalling, and nothing short of that.

 

SpaceX has been played in this whole scenario. Sure, they'll let 'em resupply the ISS and even get in on Mil/Gov launches -- but in the grand scheme of things, where it really mattered (manned spaceflight), SpaceX has been playing by the rules and kept getting the SHAFT the whole time. Dragon 2 has been ready for two ####### years. Artificially contrived and completely unnecessary requirements, then changing the timetables again and again, mis- and non-communication, maddening bureaucracy, endless delays with certification inspections on NASA's part just to KEEP the advantage on the side of the entrenched elements to boot?!

 

UN-#######-FORGIVABLE.

 

If I was Elon I'd be ENRAGED with this development. As in "grounds for packing up my Company's ####, taking my technology and people, then giving Uncle Sam the bird just out of sheer disgust as I left to ply my trade elsewhere" kind of enraged. How dare NASA and OldSpace conduct themselves like this. That's how Elon must be feeling right now, even if he (probably) doesn't act on it. I know I'd be mad as hell and wanting answers.

I don't care what political ideas a person sides with. Anyone with a little knowledge of the aerospace industry knows that this was an idea pushed by an administration looking for a good cheap headline. Sad thing was, they were willing to risk people's lives on it. 

 

I'm glad it went the way it did. NASA, new space, and old space aside, Life is much more precious than any delay or deadline. 

 

Elon knew what he was getting into when the NASA contracts came in.  I mean NASA and him had a disagreement about the amount of ###### an astronaut produces and what size sewage tank should be on D2. As long as he keeps checking the boxes, SpaceX will outshine any organization. 

Edited by flyingskippy

This huge QC issues on the Boeing tanks and vertical welding jig are inexcusable, there's the MAF tornado delay, and there's talk the SLS software is buggy as hell and somewhat of a cover-up is going on wrt to that.  And Orion is even further behind, dragging SLS even further right. A total Charlie Foxtrot if ever there was one. 

 

I see at best the SLS-Orion stack flying a few missions then fading away as Vulcan-ACES, Falcon Heavy, New Glenn and, IMO the 500 lb gorilla behind the curtain, a likely ITS-derived heavy lifter make it irrelevant.

  • Like 1

If they really want to make SLS work? They need to replace metal as the primary component. 

 

Oh, wait. This would require a fundamental redesign and rethink -- and they simply aren't the creative types. 

Speaking of the SLS/Senate Mafia, the Alabama company building the SLS test stands got quite a windfall....

 

Just keep in mind: just the structural test stand for SLS is going to cost $76 million+. SpaceX's entire Brownsville, Texas spaceport will cost ~$100 million.  

 

http://spacenews.com/report-criticizes-development-of-sls-test-stands/#sthash.IgjXdsgN.dpuf

 

Quote

WASHINGTON — A rush to complete two test stands needed for development of the Space Launch System caused their cost to nearly double, even as the overall program suffered delays, according to a new report.

 

The May 17 report by NASA’s Office of Inspector General (OIG) found that the cost of the two test stands built at the Marshall Space Flight Center for testing SLS propellant tanks increased by more than 87 percent, to $76 million, as the agency overlooked potential long-term cost savings in a effort to expedite their construction.

NASA entered into an agreement with the U.S. Army Corps of Engineers in August 2013 to construct Test Stands 4693 and 4697 at Marshall, on the grounds of the Army’s Redstone Arsenal. The Corps of Engineers then awarded a contract to an Alabama construction company, Brasfield & Gorrie, to build the stands. The stands are large steel structures designed to perform load testing on the rocket’s liquid oxygen and liquid hydrogen tanks to simulate the conditions the tanks will experience during launch.
>

 

 

teststand4693-768x424.jpg

 

Edited by DocM

You know what's really disgusting about this? If the same thing were being built for SpaceX for $25~$30 million, these same talking heads would show us how far the veins in their necks can pop out. They'd insist that SpaceX use the existing facilities at Stennis and use their own money to upgrade them.

 

Not that SpaceX would, or even needed to use Stennis.

 

(Oh look, is that Bruno in the background with the "cat-that-ate-the-canary" grin?)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • U.S. partially reverses Anthropic AI ban for Mythos but keeps Fable 5 off the market by Karthik Mudaliar Anthropic says that the U.S. government has finally allowed it to restore Claude Mythos 5. But of course, there's a catch. The rollout is again for a limited set of U.S. organizations that operate and defend critical infrastructure. The company announced this in a post on X (formerly Twitter). This does not mean that Anthropic's latest frontier models are back to normal availability. Fable 5, which was a tuned version of Mythos 5 for public release, remains unavailable. Anthropic said that it is still working with the government to expand Mythos 5 access and make Fable 5 available again, but there's no timeline. Reports from Bloomberg and Reuters say that this decision actually came through a letter from the U.S. Commerce Department. According to Reuters, this would allow more than 100 companies and institutions access to Mythos 5. Reuters also reported that Commerce Secretary Howard Lutnick’s letter removes the need for export licenses for approved companies’ non-US citizen employees, as well as Anthropic’s own non-US citizen employees, while restrictions remain for organizations outside the approved list. Anthropic isn't alone with this kind of controlled rollout. OpenAI's newest model family, GPT 5.6, was announced just yesterday, but isn't available for everyone yet. In its announcement, OpenAI also said that access to these models is initially limited to a select group of trusted partners and organizations, with broader access planned later this year. Both of these cases show that frontier AI launches are no longer just ordinary product releases and more like slow and vetted deployments shaped heavily by the U.S. government.
    • Sol, Terra, Luna - aren't those the names of failed crypto coins? 🤣🤣🤣
    • Microsoft Weekly: 5 years of Windows 11, more support for Windows 10, and expensive Xbox by Taras Buria This week's news recap is here, with Microsoft giving Windows 10 one more year of support, Windows 11 getting new taskbar settings in preview updates, Steam Machine prices, higher XBOX prices, and many more. Quick links: Windows 10 and 11 Windows Insider Program Updates are available Reviews are in Gaming news Great deals to check Windows 11 and Windows 10 Here, we talk about everything happening around Microsoft's latest operating system in the Stable channel and preview builds: new features, removed features, controversies, bugs, interesting findings, and more. And, of course, you may find a word or two about older versions. On June 24, 2026, Windows 11 turned five. The controversial operating system was released half a decade ago, and during these years, it received a fair share of criticism (such as poor Windows Search and its web results), which Microsoft is now actively addressing with regular preview updates that deliver missing, long-requested features. With Windows 12 nowhere to be seen on the horizon, it will be interesting to see if Windows 11 can stay on the market for as long as Windows 10 did. Speaking of Windows 10 and staying on the market, this week, Microsoft quietly prolonged the Extended Security Updates program for Windows 10, allowing users to get one more year of security updates if they do not want or cannot upgrade to Windows 11. Finally, Microsoft released this month's non-security update for Windows 11. KB5095093 arrived with a traditionally long list of new features, including point-in-time restore, new Windows Update settings, quieter Windows Widgets, new accessibility features, File Explorer updates and performance improvements, and more. Windows Insider Program Here is what Microsoft released for Windows Insiders this week: Builds Canary Channel Build 29617.1000 and build 28120.2374 These builds bring new accessibility features, new Windows Update controls, audio improvements, and more. Dev Channel Build 26300.8758 This build includes redesigned taskbar settings, File Explorer improvements, and more. Beta Channel Build 26220.8754 and build 28020.2366 This small update fixes the OneDrive bug in File Explorer, tweaks system sounds in dark mode, and more. Updates are available This section covers software, firmware, and other notable updates (released and coming soon) delivering new features, security fixes, improvements, patches, and more from Microsoft and third parties. If you use AI-powered browsing history search in Microsoft Edge, the company has bad news. A new update on the Microsoft 365 Roadmap revealed that Microsoft is discontinuing the feature. Despite using on-device models for natural search, some users found it creepy, claiming that Microsoft lacks trust in features like this. While the ability to find pages without using 100% precise words may sound cool, customers argued that it was nothing but another feature to bloat the browser with more AI. Good riddance? PowerToys received several updates this week. For one, Microsoft released version 0.100.1 with several improvements and bug fixes for the recently arrived version 0.100. A couple of days later, Microsoft dropped another update, this time fixing memory leaks in Command Palette Dock. In addition, the company is working on a new module that will make it easier to switch between windows within one application using the Alt + ` shortcut. The new module should make it to the stable release somewhere soon. Here are other updates and releases you may find interesting: New Ventoy update adds Windows 11's mandatory update support and more Microsoft updates Visual Studio Code with chat cost tracking and multi-agent chats Microsoft is building an AI datacenter that "uses less water than a fast food restaurant" Microsoft adds new AI study and teaching tools for free to Microsoft 365 Education Researchers claim Microsoft's quantum breakthrough is flawed by basic Python errors Microsoft is bringing a much-needed Recap app to Teams Microsoft's fast coding model, MAI-Code-1-Flash, comes to Copilot Business and Enterprise Here are the latest drivers and firmware updates released this week: AMD Radeon Software 26.6.2 with FSR 4.1 support for RDNA 3 graphics card. However, the driver contained a bug, which prevented installations on Windows 10 PCs. AMD fixed that with a quick hotfix update. Reviews are in Here is the hardware and software we reviewed this week This week, Steven Parker published several reviews. He shared his experience with the Creative Sound Blaster AE-X PCIe, a high-quality sound card with a headphone amp, low-latency communications, great build quality, and DSD256. However, it is on the pricier side of the spectrum, and it lacks EMI shielding. Check out the full review here. The second review is about the TerraMaster F4-425 Pro, an octa-core Intel NAS with a stand-out feature: built-in AI (OpenClaw). We also published a few Hands On reviews, which you can view below: We check out the SKG PS700 Neck Massager SKG Hand Massager with Heat OS500 hands on Hands-on with BOOX Tappy: cute little reading accessory Hands on with the ProtoArc EM25 affordable ergonomic mouse On the gaming side Learn about upcoming game releases, Xbox rumors, new hardware, software updates, freebies, deals, discounts, and more. If you plan to purchase a new Xbox, it's time to act now. This week, Microsoft announced yet another Xbox price increase. Starting August 1, 2026, all Xbox Series X|S models with 512 GB of storage will cost $100 more. As for the 1TB models, they are going up in price by a whopping $150. Finally, Microsoft is discontinuing the 2TB Xbox Series X. To make up for that, Microsoft announced a few programs to make its consoles more accessible. Those include BNPL, interest-free financing, pre-owned consoles, certified refurbished consoles, and more. Valve also shared some not-so-welcome news. The company has finally announced prices of the upcoming Steam Machine console, and if you plan to buy one, get ready to spend a whopping $1,049 on the 512GB configuration. The Steam Machine is now available for preorder, with shipments scheduled for June 29, 2026. Grand Theft Auto VI also received its official price tag. Rockstar Games announced that the long-anticipated game will launch at $79.99 for the base edition and $99.99 for the ultimate edition. The latter includes an exclusive collection of premium vehicles, weapons, apparel, and action threaded across all aspects of Jason and Lucia’s story." Those who preorder the game will get extra bonuses, including a Vintage Vice City Pack of cosmetic items as well as a free month of GTA+. NVIDIA announced new games for its GeForce NOW streaming service. Those include Dark Scrolls, SAND: Raiders of Sophie, Deer & Boy, EMPULSE, and more. Steam is running its annual Summer Sale, during which you can purchase plenty of various games with big discounts. It runs until July 9, so in case you missed it, you can still get some games at a lower price. Also, you can get two games for free in the Epic Games Store, plus more deals are available in this week's Weekend PC Game Deals issue. This link will take you to other issues of the Microsoft Weekly series. You can also support Neowin by registering for a free member account or subscribing for extra member benefits, along with an ad-free tier option.
    • Text extractor hasn't been working great on 0.99.1 but I am now updating to this version, hopefully it's better!
    • Yet you did exactly what they wanted you to do - is it better now without "Europrats"? BTW, UK had joined EU (EEC back then) and was one of the leading member states, it never joined Schengen Zone though 😉
  • Recent Achievements

    • Week One Done
      flexorcist earned a badge
      Week One Done
    • One Month Later
      Woland13 earned a badge
      One Month Later
    • Week One Done
      Woland13 earned a badge
      Week One Done
    • One Year In
      bernmeister earned a badge
      One Year In
    • Week One Done
      Scoobystu earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      502
    2. 2
      +Edouard
      226
    3. 3
      PsYcHoKiLLa
      156
    4. 4
      Steven P.
      75
    5. 5
      FloatingFatMan
      71
  • Tell a friend

    Love Neowin? Tell a friend!