Recommended Posts

BFS will be so large it could serve as an orbital or cislunar reusable space station with much more habitable space than ISS. Not to mention it's Mars, Moon, and potential asteroid & small body capabilities.  Having big motors & gas tanks opens many options.

 

Not to mention the possibility of reusable orbital & cislunar tanker runs, or Shuttle-like large payload trucking by adding payload doors and a Canadarm.

  • Like 2

IMHO, in the future, I could see a space tug hauling/pushing several units as a freighter which would also have lander's and multiple craft docking rings. The possibilities are astounding. One could even convert to a hanger, 3D manufacturing hubs, science stations, etc.

 

:D

  • Like 1
  • 2 weeks later...

McCain schedules hearing on Russian rocket engines

 

Quote

WASHINGTON – Sen. John McCain (R-Ariz.), the chairman of the U.S. Senate Armed Services Committee, warned in December his committee would consider an “indefinite” ban on the Russian engine that powers United Launch Alliance’s Atlas 5 rocket.

 

Now, a little more than one month later, the full committee will hold a hearing Jan. 27 on “military space programs and the use of Russian-made rocket engines.”

 

Deborah Lee James, the secretary of the Air Force, and Frank Kendall, the Pentagon’s acquisition czar, are scheduled to testify as witnesses.

 

In December, a massive government-spending bill effectively lifted a ban, at least through Oct. 1, on the Russian RD-180 engine that powers the Atlas 5 rocket. As a response to Russia’s 2014 incursion into Ukraine in 2014, Congress had outlawed future use of Russian engines for U.S. national security launches in the 2015  National Defense Authorization Act.

 

The 2016 NDAA, however,  provided limited relief from the ban, giving ULA access to four more engines for upcoming Air Force competitions. This came after the Denver-based launch services provider said it had assigned five engines that previously were deemed exempt from the ban to nonmilitary missions.

 

McCain felt the spending bill undermined the work done by leaders of the House and Senate Armed Services committees to reach a compromise on the issue. In a blistering speech on the Senate floor in December, he said the Senate Armed Services Committee would consider “a complete and indefinite restriction on [Russian President Vladimir] Putin’s rocket engines” as part of the NDAA for 2017.

 

The committee also is likely to discuss the Air Force’s plan to develop an American-made rocket engine. On Jan. 13, the U.S. Air Force said it would invest up to $241 million in rocket propulsion systems Orbital ATK and SpaceX pitched as a way to end Air Force dependence on Russian engines. The service has said it could award additional contracts in the coming weeks.

 

At the same time, the service has awarded seven research contracts worth about $17 million to study various next-generation rocket technologies.

http://spacenews.com/mccain-schedules-hearing-on-russian-rocket-engines/

 

I, myself, am not sure where this will end. The last one being overturned in a spending bill...?

 

But one thing bodes well for the US aerospace sector, and that is the willingness to support private ventures. This is now evidenced by the ripples that newspace ventures are creating....such as...

 

 French government commissions report on rocket reuse, competitiveness

http://spacenews.com/french-government-commissions-report-on-rocket-reuse-commpetitiveness/

 

and somewhat....

 

ESA ousts Airbus as space station prime, appoints itself instead

http://spacenews.com/esa-ousts-airbus-as-space-station-prime-appoints-itself-instead/

 

:)

  • Like 1

In the news still...

 

McCain, McCarthy to introduce bill to reinstate RD-180 ban

 

Quote

Sen. John McCain (R-Ariz.), chairman of the Senate Armed Services Committee, and House Majority Leader Kevin McCarthy (R-Calif.) will introduce a bill that repeals a provision in the 2016 omnibus spending bill allowing continued purchases of RD-180 engines for national security missions.

McCain was openly critical last month of the omnibus language, which overturned a ban included in the defense authorization bill.

McCain’s committee is holding a hearing this morning on the use of Russian-built engines for national security launches. [AP]

http://spacenews.com/mccain-mccarthy-to-introduce-bill-to-reinstate-rd-180-ban/

 

Sen. McCain assails Pentagon for relying on Russian rockets

 

Quote

Air Force Secretary Deborah James told the committee the department is working to end the use of the Russian engines as soon as possible. She said disengaging from use of the Russian engines is far more complicated than it appears. She recommended a stockpile of 18 of the RD-180s until an American-made rocket can be tested and fielded.

McCain and House Majority Leader Kevin McCarthy, R-Calif., are introducing legislation Thursday to repeal a provision in law that they say allows the unlimited acquisition and use of RD-180 engines, which are manufactured by NPO Energomash. The manufacturer is owned primarily by the Russian government and controlled by several of Putin’s confidants, according to the lawmakers.

https://www.washingtonpost.com/politics/congress/gop-lawmakers-seek-to-end-purchase-of-russian-rocket-engines/2016/01/27/d47cd92c-c4d4-11e5-b933-31c93021392a_story.html

  • Like 1

And speaking of John....

 

Quote

Keith's 6:30 pm update: Moments ago Sen. McCain just gave a shout out on CNN to SpaceX as being able to provide a competitive alternative to the RD-180 saying"we paid this outfit ULA $800 million just to stay in business". McCain went on to note that the company that serves as a middleman in the sale of RD-180s between Russia and ULA "involves thugs and cronies of Vladimir Putin".

http://nasawatch.com/archives/2016/01/mccain-seeks-to.html

 

Hope he doesn't have health concerns  due to this...he is very upset....

  • Like 1

U.S. Air Force evaluating early end for ULA’s $800 million in yearly support

 

Quote

WASHINGTON – The U.S. Air Force is considering the early termination of United Launch Alliance’s $800-million-a-year launch capability contract after the company failed to bid on the service’s first competitive launch contract in a decade.

 

Air Force Secretary Deborah Lee James, testifying Wednesday at a Senate Armed Services Committee hearing on military space launch, said she has directed staff to study the implications of ending the EELV Launch Capability contract early.

 

The Air Force buys ULA launches and rocket hardware through a fixed-price EELV Launch Services contract but funds ULA’s launch infrastructure and engineering support through the cost-plus EELV Launch Capability contract that competitor SpaceX considers an unfair subsidy.

 

The hearing came with a bevy of unwanted news for United Launch Alliance.

 

Sen. John McCain (R-Ariz.), the committee’s chairman, said he would introduce legislation Thursday to reinstate a ban on  the U.S. military’s use of Russian rocket engines, a move that  effectively would limit  ULA to nine RD-180 engines for upcoming competitions for Air Force launch contracts. The Boeing-Lockheed Martin joint venture’s Atlas 5 rocket, which launches the majority of national security satellites, is powered by a single RD-180. The ban would not curtail NASA’s use of the workhorse rocket.

 

Ending the launch capability contract would have a more immediate impact on the Boeing-Lockheed joint venture than reinstating the RD-180 curbs.

more at the link....

http://spacenews.com/u-s-air-force-looks-at-ending-ulas-launch-capability-payment/

 

too many lawyers, can't see this happening....?

  • Like 1

Ahhhh!    Particularly, when they did have a Delta, but ULA chose not to use it.

 

I was a bit thrown back, when the ban was overturned in the large omnibus bill at the last minute. One would think that this could occur again, regardless of what John McCain is able to implement next. Then we have a mess of lawyers/politicians/lobbyists...I had thought that the best they could do is give ULA a repremand, small cash fine equal to value of non bid lift or drag this out pass the contract time.

 

I hope USAF can give ULA a wake up call.

5 minutes ago, Draggendrop said:

Ahhhh!    Particularly, when they did have a Delta, but ULA chose not to use it.

>

I hope USAF can give ULA a wake up call.

 

Right. Even though they'd likely have lost that launch competition, they'd have fulfilled the spirit of the contract by offering a Delta service. Worse, they could have bought an extra RD-180 engine set for a non-military launch and just shuffled the inventory to offer an Atlas V.  

  • Like 2

Yup. It was a ham-handed move to panic Congress into lifting the RD-180 ban, and it worked because there was a short window between their play and Congress passing the budget. Now things have become clearer, and they're under heat again. 

  • Like 2

With ULA belonging to a very large military industrial provider...this move now shows a few flaws in underling ULA. If this were a chess game, it appears ULA had no idea for a second move, nor the consequences of their first move. Someone in ULA may be removed from a position of business strategy.

Bruno only recently took over after his predecessor mishandled things. They may not shake things up right away just for appearances sake. Also, Vulcan isn't a 100% deal - Boeing seems to be slow walking their support (ULA being a joint venture with Lockheed.)

Edited by DocM
  • Like 2
2 hours ago, DocM said:

Dunno about that. They get the $800m for assured access to launch services, then ULA refuses to bid? That sounds like grounds for a failure to deliver services cancellation by the USAF.

I saw the other day too that USAF testified the RD-180 costs around $30M. It's the first to a  figure has been released. 

  • Like 3

Here is a Reuters article quote...

 

Quote

RD Amross buys the engines from Energomash for $20.2 million each on average, according to Amross’s current contract with Energomash, dated June 5, 2014.

 

Amross adds $3.2 million to each engine, a 15 percent markup. It then sells them to ULA for $23.4 million, according to an amendment to Amross’s contract with ULA, dated Oct. 2, 2014.

http://www.reuters.com/article/us-russia-capitalism-rockets-special-rep-idUSKCN0J22BQ20141119

 

http://fortune.com/2016/01/28/pentagon-congress-spacex-competition/

 

Quote

>

McCain is now calling the $800 million maintenance payment “money for doing nothing,” and the Air Force appears to be listening. “That’s astronomical that—that sum of money, of taxpayers’ dollars,” McCain said. “And after paying them $800 million a year for my calculation nine or 10 years, then they don’t even compete on a launch. Is that the appropriate use of the taxpayers’ dollars?”

Sec. James also cited ULA’s refusal to compete for the GPS III launch as grounds for re-examining its dealings with ULA. “I was very surprised and disappointed when ULA did not bid on a recent GPS competitive launch opportunity,” James told the committee. “And given the fact that there are taxpayer dollars involved with this ELC arrangement I just described to you, I’ve asked my legal team to review what could be done about this.” (ELC is one of the Pentagon’s terms for the $800 million annual maintenance payment.)

It’s not clear if or how soon the Air Force may be able to restructure or nullify its deal with ULA. But the fact that the Air Force—once ULA’s great benefactor—is now exploring ways to dial back the money doesn’t bode well. Nor does the lack of confidence the Pentagon now expresses in its longtime space launch partner.

Speaking at the same hearing, Pentagon acquisition chief Frank Kendall acknowledged ULA “may not be very competitive” in the future, citing market pressures from the likes of SpaceX. It’s still “questionable whether ULA will survive,” he said.

 

 

  • Like 2

And that, my friends, is what I meant by "adapt or perish".

 

ULA has chosen to perish. They had a "Plan A" but no "Plan B" when they were called out on their "Bravo-Sierra". Now they're in the deep water with no lifejacket.

 

When the USAF pulls the plug (and they will), NASA funding will be the next to go. All SLS/Orion assets will be confiscated, certainly. Any other Mil/Gov Projects will likewise be seized too. Boeing and Lockheed-Martin, as separate companies, since ULA is a joint venture, will be taken to task over this whole debacle. It'll take an act of Congress to do so; but I think that this is just the beginning of a HUGE shakeup in the MIC scene.

 

OldSpace has served its' purpose; and we're now witnessing how it gets taken out behind the woodshed and put out of its' misery like Old Yeller.

  • Like 1

For $ 23.4 million (2014 dollars), for a crate on the shipping dock. From this crate on the dock to Atlas 5 standing in a count down, not going to be competitive against anyone. ULA needs to "soul search" sooner than later. They need to live up to the contract they signed, even if a loss and attempt a restructure. Not too far in the future, they will be up against SpaceX...and who knows, BO maybe in for "Atlas 5 loads" eventually, or AR buying out ULA.

  • Like 1
13 minutes ago, Draggendrop said:

For $ 23.4 million (2014 dollars), for a crate on the shipping dock. From this crate on the dock to Atlas 5 standing in a count down, not going to be competitive against anyone. ULA needs to "soul search" sooner than later. They need to live up to the contract they signed, even if a loss and attempt a restructure. Not too far in the future, they will be up against SpaceX...and who knows, BO maybe in for "Atlas 5 loads" eventually, or AR buying out ULA.

Not sure they'd want it now. ULA was attractive only because of the Mil/Gov Contracts. If those are all kaput, ULA is pretty much worthless.

 

The parent companies will field-strip ULA for everything of value, let most of the employees go after they force them to sign NDA's, and leave the factories to rust in the sun. That'll be the end of ULA.

  • Like 1

The Delta is still a lifter, that I feel, will have to be kept around for a two launcher approach to help ensure access to space. Yes, it is extremely expensive, but a cog still needed, even after FHFT is on the scene and has proven itself. This is quite the mess. I forgot about Antares, but it has RD-181's...here we go again.

If the Delta can be held on life support till USAF has viable engine technology alternatives...then phase it out for a more competitive launcher, hopefully derived from new engine research grants.The heavy lifter is the key.

  • Like 1
Just now, Draggendrop said:

The Delta is still a lifter, that I feel, will have to be kept around for a two launcher approach to help ensure access to space. Yes, it is extremely expensive, but a cog still needed, even after FHFT is on the scene and has proven itself. This is quite the mess. I forgot about Antares, but it has RD-181's...here we go again.

If the Delta can be held on life support till USAF has viable engine technology alternatives...then phase it out for a more competitive launcher, hopefully derived from new engine research grants.The heavy lifter is the key.

DH is still available as a Lockheed-Martin product. Since it uses US-sourced engines, there's no issue other then the price.

 

That's gonna change after FH gets certified ... especially since FH is going to be 1/3 to 1/2 the cost (easily) and easily 2.5x the capacity to GEO. Then we get into the FX and FHX .. yeah.

 

LH-M and Boeing have no answer for SpaceX's gear in the timeframe that SpaceX is working in. No answer at all. They might as well start working on Habs and other things that they're good at -- oh wait, Bigelow's already beaten them to that too. 

 

Time to start working on those resumes', fellas. :no: 

 

The next 2-4 years will be interesting.  USAF wants the Raptor upper stage for F9 and FH in 2018.

 

The debate now is if the new stage will remain 3.66 meters or be expanded into a 5.2 meter hammerhead stage with ACES functionality (can serve as a tanker, long loiter) and a new, longer, fairing. The latter would deliver greater performance but the former would be quicker to deploy.

 

I think the 5.2 meter as that would be on a path to BFS (methane fuel, higher energy launches etc.) and the longer fairing useful for large military satellites and Bigelow habitats.

  • Like 1

Yep. Only thing that will save ULA's bacon now is some kind of miracle development that sees them keeping the SLS contract -- and I don't see NASA keeping that torch lit now. Not with the progress that SpaceX has made. FH is almost ready for hot-fire testing (April~May) and assuming that goes as planned they want to get that bird in the air by late summer for the Demo Flight. @DocM, you know more about SpaceX's plans than anyone -- are they opposed to accelerating timeframes if there's a need to bump stuff up? We've already read that the USAF wants that bird now. 

This topic is now closed to further replies.
  • Posts

    • Microsoft brings Claude to its own Azure infrastructure, powered by Nvidia GB300 Blackwell by Karthik Mudaliar Anthropic's Claude models are now generally available in Microsoft Foundry on Azure and are running on Nvidia's GB300 Blackwell Ultra systems. Nvidia wrote in its announcement that the models are hosted on Microsoft Azure and accelerated by GB300 Blackwell Ultra GPUs, with Quantum-X800 InfiniBand networking used to support larger agentic systems and specialized sub-agents that can operate across business domains. This is great for customers and enterprises that want to build autonomous and domain-specific AI agents using Claude without moving outside Microsoft’s cloud platform. Microsoft currently offers Claude models in Foundry in two forms: “Hosted on Azure,” which runs end-to-end on Azure infrastructure and is generally available, and “Hosted on Anthropic infrastructure,” which remains in preview. This separation is quite important for organizations that have procurement, compliance, data processing, or internal governance requirements tied to Azure. Anthropic currently has 11 Claude models listed in Microsoft Foundry, including Opus 4.8, Sonnet 4.6, and even the unavailable Mythos and Fable models. Billing is handled through Claude Consumption Units (CCUs). Microsoft says CCU is an invoicing unit for Claude models in Foundry, with token usage converted using Anthropic’s published per-model token rates. The usage is billed through Azure Marketplace just like models from other distributors and appears on the customer's Azure invoice, while eligible spend can count against a Microsoft Azure Consumption Commitment. For starters, GB300 NVL72 is a rack-scale, fully liquid-cooled system that combines 72 Blackwell Ultra GPUs and 36 Grace CPUs. Nvidia has listed 37TB of fast memory, 130TB/s of NVLink bandwidth, and FP4 Tensor Core performance of up to 1,440 petaflops with sparsity. The deal is also part of a three-way partnership between Microsoft, Nvidia, and Anthropic. Under the deal, Anthropic has committed to buying $30 billion in Azure compute capacity and contracting additional capacity up to one gigawatt. Nvidia and Microsoft also said they would invest up to $10 billion and $5 billion in Anthropic, respectively.
    • WhatsApp is getting usernames, and you can reserve your preferred one now by Fiza Ali Sharing your phone number isn't always something you want to do, especially with people you've just met. Whether it's someone from a class, a local community group, or a sports team chat, handing over your number can feel like giving away more personal information than necessary. That's exactly the problem WhatsApp is trying to solve with its upcoming usernames feature. The company has announced that users can now reserve a unique WhatsApp username ahead of the feature's wider rollout later this year. Once usernames become available, they'll let people connect without revealing their phone numbers. It's a change that makes a lot of sense for group chats. Right now, everyone in the group can see your phone number. With usernames enabled, that won't necessarily be the case when someone contacts you for the first time. WhatsApp says it's opening username reservations early because more than three billion people use the app, meaning plenty of people are likely to want the same usernames. Reserving one now gives users a better chance of securing the name they actually want before the feature launches more broadly. If your preferred username is already taken, WhatsApp will also offer a built-in username generator to suggest available alternatives. The feature isn't only aimed at individual users. Creators, businesses, and organisations will be able to claim the same username they already use on Instagram or Facebook, making it easier to keep a consistent identity across Meta's apps. Furthermore, privacy is a big part of how WhatsApp is introducing usernames. There won't be a public directory where people can browse or search for usernames. Instead, people will need to know your exact username before they can start a conversation with you. Additionally, users can also choose to enable a username key, which adds another layer of control by requiring people to enter that key before sending a message. Once the feature rolls out, people who choose to use a username will no longer have their phone number shown when messaging a person or business for the first time. If you want to reserve a username, make sure you're running the latest version of WhatsApp, then head to Settings > Account > Username. The tech giant says usernames will roll out gradually over the coming months, and users will receive an in-app notification when the feature becomes available in their country.
    • When I think about a network, there are really two aspects, the hardware and the wiring. So here is what I would do for both. Wiring: Use Cat6A for the patch panel, outlets, and all structured cables (cables installed in walls). Run plenty of Wireless Access Point (WAP) cables, as a general rule, assume a signal can only pass through 2-3 walls and can't pass through a floor (that is conservative, but trust me on this if you want strong WiFi)  Cat6 patch cables are fine for now if you don't plan to run 10gig, those are easy to replace later if needed. Run OS2 single-mode fiber to anywhere you think you may have a server or sub-switch. (yes, single-mode for everything on a small network, don't mess with multimode unless you are at a scale where that minor cost and power savings will matter). If you really want to future proof, also run fiber to any high density WAP locations, it is likely that WiFi 8 and beyond WAPs will push the limits of 10g. Run 6-12 pairs of single-mode fiber between your MDF and the building's MDF, even if you only need 1 or 2 pairs now, those extra pairs will pay off down the road. Hardware: (its easy to say "get all the features incase you need them", so instead of futureproofing, I am going to take approach of suggesting areas worth investing in, and areas you can save money). Don't overspend thinking you need every feature on every port. You don't need 10g on every port, you don't need PoE on every port. Don't overspend on redundancy either, unless you are ready to buy two of everything, don't waste money buying two of some things and not others. Dual power supplies are worthwhile, but probably not HA or multi-path redundancy.  Get 1 "distribution layer" switch that your router/firewall will connect to as well as all your access layer switches below. This should be a fully managed 10g+ switch with a combination of copper and SPF ports, a few 25g uplink ports are nice for this switch. Given that you said it is a small network, I suggest also using that distribution layer switch for servers and WAPs, meaning it will need PoE. Speaking of wireless, get good professional tri-band WAPs, and either turn on the band stirring options, or limit 2.4 to an IoT only SSID. This will provide a solid WiFi capable nearly everything but the highest of bandwidth clients...you could even consider skipping wiring workstations depending on usage. Access layer switch for workstations and printers can be cheaper switches, 2.5g is a good sweet spot between price and future proofing, but even 1g is fine for most individual clients (the kind that could probably be fine on WiFi). You can consider saving a little on access layer switches by only getting 1 PoE switch for whatever needs it (remember your WAPs are connecting to the distribution switch, not here), and non-PoE for your workstations, because desk phones are falling out of favor. You can also save money here by not buying managed switches if you don't need them--but really do some soul searching there, if you go this route, then anything that isn't on your workstation VLAN would either need to be connected to the distribution switch, or its own access layer switch. Also, don't feel like you need a fancy fabric stacking switches for your access layer, that is the point of the higher-end distribution layer, to remove the need for things like that at this level. Home Hardware: I'm realizing the above assumed an office setting, if this if for your house and home lab then the above still applies, but you'll probably want everything managed and PoE, just because, but you probably also don't need multiple access layer switches. If your total port count is below 24, just skip separating distribution layer and access layer and just get one nice switch with the features you want. If you are at the point of considering a 48-port switch, I would instead get a nice high-end distribution switch for things that need it, and cheaper access layer switches with specs based on the needs of connected devices. For home use, don't worry about home running every device to the main switch, there is nothing wrong with running sub-switches for your media areas and office, those essentially become your access layer, just look for sub-switches with a 10g uplink so sharing bandwidth isn't an issue. Just make sure you always connect them to your distribution/main switch, don't daisy chain, the path should never have more steps than Client>Access>Distribution>Firewall>Internet or Client>Access>Distribution>Server if it is local.
    • Google Meet brings Gemini note-taking to AI Pro and Ultra subscribers by Karthik Mudaliar Google's Gemini-powered "Take notes for me" feature inside Google Meet is now available to Google AI Pro and Ultra subscribers. The features work on Google Meet for web as well as on mobile, and Google says that subscribers can use it for meetings they host in many supported languages. As the name suggests, "Take notes for me" allows Gemini to listen to a meeting, generate a summary, identify action items, and save the notes as a Google Doc in the user’s Drive. After the meeting, the organizer receives an email recap with the summary and action items, while the notes can also be attached to the related Calendar event depending on the meeting setup and sharing settings. The feature isn't automatically turned on for everyone, though. Google says that all meeting participants are notified when note-taking is turned on, and users can start it from the pencil icon in Meet or enable it for future calls through Meet’s meeting records settings. For work or school accounts, administrators can also control whether the feature is available and may require explicit participant consent for note-taking, recording, or transcription features. The feature first launched back in 2024, when it was available just for selected Workspace users. Over the years, Google added refinements and more options, including the ability to enable it when scheduling meetings via Google Calendar. Google's support docs say that the feature currently supports English, French, German, Italian, Japanese, Korean, Portuguese, and Spanish, but only one language at a time. Meetings with multiple spoken languages are not currently supported, and Google recommends using the tool for meetings between 15 minutes and eight hours. The new feature makes Google Meet closer to its rivals that have AI tools already built in. Microsoft Teams has recently started offering Copilot and intelligent recap features that summarize meetings, surface highlights, and help with follow-ups, while Zoom’s AI Companion can also generate meeting summaries from desktop and mobile meetings.
    • GnuCash 5.16 by Razvan Serea GnuCash is a personal and small business finance application, freely licensed under the GNU GPL and available for GNU/Linux, BSD, Solaris, Mac OS X and Microsoft Windows. It’s designed to be easy to use, yet powerful and flexible. GnuCash allows you to track your income and expenses, reconcile bank accounts, monitor stock portfolios and manage your small business finances. It is based on professional accounting principles to ensure balanced books and accurate reports. GnuCash can keep track of your personal finances in as much detail as you prefer. If you are just starting out, use GnuCash to keep track of your checkbook. You may then decide to track cash as well as credit card purchases to better determine where your money is being spent. When you start investing, you can use GnuCash to help monitor your portfolio. Buying a vehicle or a home? GnuCash will help you plan the investment and track loan payments. If your financial records span the globe, GnuCash provides all the multiple-currency support you need. Between 5.15 and 5.16, the following bugfixes were accomplished: Bug 421610 - RFE: Include logical dates for View->Filter by "date range"The Select Range section of the Date tab of the register's Filter By dialog box is changed to provide relative, specific date, or days ago options for the start and end of the filter range. The Show number of days item label is changed to Show from days ago to better reflect what it does. Bug 436105 - esc key not working as expected in register: Enable the escape key to cancel a field edit. Bug 797384 - Gnucash doesn't handle commodity prices with big numerator/denominator properly. Bug 798004 - Next gen UI for stock transactions Bug 799314 - Add "enter now" option in scheduled transaction editor. tab to allow users to select the scheduled transactions to be included in a “Since Last Run…” window. If there are no instances of a selected transaction triggered by today’s date, the next instance is triggered. Bug 799751 - autocomplete crash Bug 799759 - Users can't Enable entries via Checkboxes on Scheduled Transactions PageAllow the Enabled box in the list of scheduled transactions to be operated instead of having to open the transaction editor dialog and change the Enabled checkbox. Also added use of the Name column as the secondary column sort for all the other columns. Bug 799762 - Poor handling of cases where hidden/placeholder accounts are used in the account register Bug 799766 - Double line preference not respected in search register Bug 799767 - POST /accounts in bindings/python/example_scripts/rest-api is broken Bug 799777 - `xaccSplitSetParent`: reparenting a committed split silently drops its KVP slots (online_id, cap-gains links) Other changes & improvements: Numeric values may now be selected to copy in the Accounts page. Add new Finance::Quote source Finnhub.io: Free API key (personal/non-professional use) available at https://finnhub.io. Set FINNHUB_API_KEY environment variable to API key to use this source. As of June 2026, free tier API limit is 60 API calls/minute. The Investment Lots report has new optional columns for Computed Annual Growth Rate. Python Bindings: Improved translation of primary object (Account, Transaction, Split, etc.) so that they can be treated as normal Python objects. This is accomplished with SWIG magic so no existing code is obsoleted. Python Bindings: Better conversion of GLists to Python lists. Python Bindings: Destroy the QofSession in the Python Session dtor to prevent leaving the database locked. [engine] Add first-class online_id accessors for Split and Account and make them available to Python bindings, removing the unused Transaction online_id property. Improve C++ implementation of QofBook. Correct the Doxygen doc for qof_instance_get/set_kvp. [gnc-log-replay.cpp] fix incorrect guid dump Add some Boost library requirements needed by libgnucash-guile to CMakeLists.txt so that missing feature will fail at configure time. Use Compile-time Regular Expressions instead of std::regex in gnc-filepath-utils.cpp and instead of boost::regex in the CSV importer, with the CTRE v3.11.1 header added to borrowed [gnc-filepath-utils.cpp] null check char* arguments Add ChartJS licenses. Removed AEX from list of commodities. euronext.com is now using JS based anti-webscraping. [report-core] always offer options summary in reports. This is useful to debug reports. The Add options summary option is removed because it's no longer optional. Remove remaining obsolete IMContext from sheet Fix blurry text in HiDPI offscreen-rendered widgets Add port field to database connection dialog: The convention of appending the port number after the host isn't obvious. When editing a split in the register treat the account as being changed only if it isn't the one selected before editing instead of if the user performed an edit Return immediately from qof_book_destroy if hash_of_collections is null. If qof_book_destroy is called on a QofBook* freshly created with qof_book_new (usually because it was used to create a session that now must be destroyed) it would try to empty the non-existent hash tables, crashing. Clean up Flathub metadata to solve warnings at flatpak build time. Be consistent in naming GncPluginPage and GncPluginPageRegister HTML: Remove unimplemented function declarations. [gnc-html.cpp] remove unused buggy string conversion functions Convert libgnc-html to C++ Apply -Wall -Werr -Wmissing-prototypes to C++ compilation on Windows and fix the resulting errors. New and Updated Translations: Arabic, Croatian, Danish, Dutch, German, Finnish, Hungarian, Korean, Norwegian-Bokmal, Spanish Download: GnuCash 5.16 | 176.0 MB (Open Source) Links: GnuCash Home page | Other Operating Systems | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • Reacting Well
      NovaEdgeX earned a badge
      Reacting Well
    • Week One Done
      NovaEdgeX earned a badge
      Week One Done
    • One Year In
      BA the Curmudgeon earned a badge
      One Year In
    • Conversation Starter
      rosiecharles earned a badge
      Conversation Starter
    • First Post
      KMilenkoski1202 earned a badge
      First Post
  • Popular Contributors

    1. 1
      +primortal
      536
    2. 2
      +Edouard
      269
    3. 3
      PsYcHoKiLLa
      150
    4. 4
      Steven P.
      98
    5. 5
      macoman
      66
  • Tell a friend

    Love Neowin? Tell a friend!