It's only because they have to. Otherwise ULA will be squawking about "monopolies" and being "locked out" (get it?) and such ... the same crap they themselves did for years and years. LockMart and Boeing used to take each other to court so often in the old days before the joint venture ULA that it was almost comical.

 

55 minutes ago, Unobscured Vision said:

It's only because they have to. Otherwise ULA will be squawking about "monopolies" and being "locked out" (get it?) and such ... the same crap they themselves did for years and years. LockMart and Boeing used to take each other to court so often in the old days before the joint venture ULA that it was almost comical.

That's what I figured it was. Thanks! 

  • Like 1

This favoring of Atlas V only lasts until the launchers bought on the bulk buy are expended and Vulcan takes over from it. 

 

Atlas V and Delta IV are going away. That's a is lock. Delta IV's last launch is 2018, and as soon as an alternative can be fielded which does not use Russian engines Atlas V will be relegated to non-government launches where it cannot easily compete.

 

Then the situation favors the Falcons because Vulcan will need 3-7 successful launches of various types to qualify for all classes of NASA or USAF payloads. Ditto for Blue and for BFR. Example, you wouldn't launch an RTG or nuclear reactor on a vehicle with only 3 or 4 launches. 

 

Near term the launch bid to watch for is the test flight of NASA's Kilopower space nuclear reactor, and its full size ground test takes place within the next few weeks. If either Falcon 9 or Falcon Heavy gets that launch then it will be nuclear qualified, perhaps both due to their commonality, which is the last major advantage Atlas V will have.

Edited by DocM
  • Like 1

:laugh: Sticking to what they know ... it's not gonna last, either. The whole "we gotta do what we've always done because that's the way we've always done it" mentality is gonna get them retired.

 

Just take the pension, fellas. Take the pension. You've served your masters well for long enough.

One correction to my previous post is that Delta 4-Heavy will continue to fly until 2023. 

 

There is an upcoming funded procurement/competition by the US Air Force for DIV-H's  replacement, with the expected competitors to be; 

 

ULA Vulcan (Centaur & ACES upper stages)

 

Blue Origin's New Glenn 

 

OrbitalATK's Next Generation Launcher (pka Liberty) 

 

and a SpaceX entry which could be Falcon Heavy but is more likely the BFR with the  'Chomper' Spaceship/S2 (and yes, Musk called it that at IAC-2017.) 

 

Onthe other hand, SpaceX could offer both FH and BFR/Chomper with a dual bid.

This should be for Raptor 40 then. Iteration 20.0 is ready to go, as far as we can tell. Now comes the part where SpaceX gives it the "Merlin treatment", squeezing more and more performance out of the platform in incremental upgrades. :yes: 

 

By the time they're at 20.5 or so, it'll be jamming at roughly twice the power output. Time will tell .... 

Looks like a modification of the January 2016 USAF Raptor upper stage engine development contract for F9/FH. 

 

That contract cut a USAF check for $33.6m and the proportial contribution was 2:1, meaning  a new $40.8m USAF check results in a SpaceX expenditure of $81.6m.

 

They've also moved up the completion date from December 31, 2018 to April 30, 2018.

 

In light of recent IAC announcements, the F9/FH phase out and BFR/BFS acceleration,  ISTM this could now be applylied to the BFS "Chomper" satellite delivery vehicle/BFR "upper stage."

 

https://www.defense.gov/News/Contracts/Contract-View/Article/1348379/

 

Quote


Space Exploration Technologies Corp., Hawthorne, California, has been awarded a $40,766,512 modification (P00007) for the development of the Raptor rocket propulsion system prototype for the Evolved Expendable Launch Vehicle program.  Work will be performed at NASA Stennis Space Center, Mississippi; Hawthorne, California; McGregor, Texas; and Los Angeles Air Force Base, California; and is expected to be complete by April 30, 2018.  Fiscal 2017 research, development, test and evaluation funds in the amount of $40,766,512 are being obligated at the time of award.  The Launch Systems Enterprise Directorate, Space and Missile Systems Center, Los Angeles AFB, California, is the contracting activity (FA8811-16-9-0001).

We won't have to wait long to find out then. Most of the Raptor-40 work has likely been finished already. Same design, just beef/scale some components up, retool the powerhead for the increased pressure it has to deal with, etc.

 

Likely Raptor-40 will be the 650k lbf model, and then SpaceX will start aiming for the 1,000k lbf one after that for BFR 2.0.

17 hours ago, DocM said:

Time to start taking bets as to if the power to weight ratio will  be over 300. Merlin at 200 is crazy enough, what with most engines not cracking 80-ish.

Even if they get 275 it'll be a hell of an achievement. Merlin at 200 is already a milestone for RP-1's efficiency rating. Best RP-1 engine ever made. :yes: AR-1 is gonna be great, sure -- if it gets off the test bench (and likely will) -- but Merlin is my favorite.

And all those Flight Proven™ cores in the barns are going to make it much easier to fly 40 missions next year.

 

That French space agency dude must really regret creating the SpaceX Steamroller saying

 

59f7c15140fd6_spacexsteamroller.thumb.jpg.c1fb0e67d69360c95cd4a80ba31cba7b.jpg

 

 

  • Haha 1

Yep, and all the while SpaceX will be busy:

- rolling Block-4 and Block-5 Falcon-9's out of the factory

- finalizing tooling and production methods for BFR/BFS 1.0

- getting Brownsville and Boca Chica facilities to Stage 3 milestones of completion

- getting new Vandenberg & Cape facilities up and running (for BFR/BFS assembly)

planning the Brownsville and Boca Chica BFS/BFR facilities if they haven't already been factored in

- moving/hiring personnel, equipment and logistics for the above

 

Gonna be a busy year. :yes: 

  • 2 weeks later...
Quote

SpaceX suffers Merlin engine test mishap

 

WASHINGTON — SpaceX said Nov. 8 that it suffered a failure of a Merlin engine during a recent test at its Texas facility, but that the incident would not delay any upcoming launches.

 

The incident, which took place Nov. 4 and was first reported by the Washington Post, may have involved a new version of the Merlin engine being developed by SpaceX for the next upgrade of the company’s Falcon 9 launch vehicle.

 

“SpaceX experienced an anomaly during a Qualification test set up of a Merlin engine at our rocket development facility in McGregor, Texas,” the company said in a statement to SpaceNews. No one was injured in the test, the company said, and “a thorough and fully transparent investigation” is underway, in coordination with various government agencies.

 

SpaceX has yet to disclose specific details about the incident, which a company source said took place on a Merlin test stand that has two bays. One bay reportedly suffered damage that will take two to four weeks to repair, while the neighboring bay received only minor damage that can be repaired in days.

 

The incident, according to the source, took place not during an actual engine firing but during a troubleshooting activity called a “LOX drop” where liquid oxygen is flowed through the engine to look for leaks. It wasn’t clear how this test led to the anomaly that damaged the engine and its test bay.

/snip

More at SpaceNews

 

Better on the test stand than on the launch pad or going down range.  Odd that it blew up during the LOX drop.  Will be interesting to read SpaceX's investigation into the cause.

  • Like 2

This was not during an engine run, it was during a LOX dump - a flow and leak test. It may not have even been in the engine but in the ground support equipment on the test stand. We'll get that info later.

 

Such incidents can occur when cleaning procedures were not sufficient to get all combustibles out of the engine before the next test. For example, RP-1 or some other hydrocarbon could have been missed during a cleanup and ignited when the LOX hit it.

 

Since this was a developmental Block 5 engine test, not a Block f4 which is the operational engine, the flight schedule will not be impacted.

 

Give them 2 to 4 weeks to clean up the mess and get the stand ready and it's back to testing Block 5.

 

If you aren't breaking things you aren't learning anything.

  • Like 1

Yeah, I thought the purge system was supposed to clear all of that out between tests -- just for this reason?

 

Something went screwy. They'll figure it out, identify a new and better way to handle purges, make it (and their procedures) better & more robust than ever, and it'll never happen again.

WAPO were the first ones to run this story and that is kind of messed up. Is BO going to use WAPO to spread negative info on its competitors? I don't even think they covered BO's power head failure.  Also, how did WAPO get this information? 

Scuttlebutt is a disgruntled employee at McGregor, or contractor.

 

That Bezos has been using WapPo as a political and business PR attack dog is old news. He's been doing it ever since he bought the paper a few years ago.

 

WaPo also gives Bezos and in with the spook agencies. Philip and Katherine Graham, its long-time publishers from the World War 2 days forward, were involved and there's no sign that the paper has broken that connection. Today, Amazon Web Services provides cloud services for the spooks. If you have the time look up Operation Mockingbird.

 

In other news,

 

 

Edited by DocM

Back to the "engine explosion" 

 

This was  a failure of ground support equipment (GSE) in the test stand. NASASpaceFlight.com has a story with SpaceX & NASA sourced information, photos taken by a user flying over the test center, etc. 

 

The test stand should be repaired and back in operation within a couple of weeks, and the adjoining test stand should be ready in a few days. There will be no impact on the flight manifest.

 

The test stand info starts about halfway down the page,

 

https://www.nasaspaceflight.com/2017/11/spacex-static-fire-zuma-falcon-9-engine-no-issue-manifest/

 

As SpaceX gets closer to launching astronauts using Block 5 Falcon 9's and Crew Dragon capsules in mid-2018 there will be more FUD (fear, uncertainty & doubt) and concern troll  stories, mostly sourcing from those who see this is a threat. The Usual Suspects in the industry, and their shills in Congress and the media. 

 

Expect even more as their BFR super-heavy Booster and BFS  Spaceship progress through their test programs. A BFS will be up to bat first, with the first test vehicle's keel being laid  around Q2 of 2018. The factory is being prepared, and the tooling on order.

  • Like 1
1 hour ago, DocM said:

Expect even more as their BFR super-heavy Booster and BFS  Spaceship progress through their test programs. A BFS will be up to bat first, with the first test vehicle's keel being laid  around Q2 of 2018. The factory is being prepared, and the tooling on order.

Yeah, you want to be standing WELL back when they test that bugger...

  • Like 2

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Posts

    • Xbox Insiders get Xbox 360 achievements and Gamertag character upgrades by Pulasthi Ariyasinghe Microsoft is continuing its fast-paced update schedule for Xbox Insiders. Today, the company announced a new slate of features it is rolling out to Xbox Insiders in the Alpha Skip-Ahead ring, which includes an expansion to the gamertag system, Xbox 360 achievements, and more. The unique Gamertag that Xbox users can choose for their profile is getting more characters. Instead of the 12-character limit, Insiders will now be able to get a Gamertag that's 15 characters long. The 12-character limit will still apply to Gamertags that are not unique or contain any non-Latin characters. Meanwhile, Microsoft is adding Xbox 360 game support to its Game Hubs. Selecting an installed Xbox 360 game on a modern Xbox console will now show achievement progress, captures, and other information. Achievement pop-ups are back for these classics too, which should be good news for achievement hunters. The next change is for Xbox players who can't wait to jump into their games when an update is required. "If a game requires an update and is available to stream through your Game Pass membership, you can start playing immediately with cloud gaming while the update downloads in the background," explains Microsoft. The final change of this Insider update is once again to the game cards. Insiders will find that all games, both released and upcoming, will now have a simple button to add to their profile's wishlist, making the process much easier from a single place. This Xbox update is rolling out today to Insiders in the Alpha Skip-Ahead ring. As usual, Microsoft aims to bring it to more Insiders over time before they reach all Xbox owners. Head here to find out how to join the Xbox Insider Program to get a chance to test these features and upcoming ones on both consoles and PC.
    • In the boot options in the UEFI is set to legacy or CMS? It needs to be set to UEFI if it's not already.
    • Researchers claim Microsoft's quantum breakthrough is flawed by basic Python errors by Karthik Mudaliar Microsoft's aggressive roadmap to deliver a commercial quantum supercomputer by 2029 has now hit a bit of a snag, and it's not because of a complex sub-zero dilution refrigerator, but rather because of a few lines of basic Python code. A new critique published in the scientific journal Nature argues that simple software errors effectively manufactured the breakthrough that Microsoft's foundational research claimed back in 2025 into Majorana-based topological qubits. Topological quantum computing, the path that Microsoft chose for its research, relies on creating and controlling "Majorana zero modes." These are exotic quasiparticles that theoretically offer vastly superior error resistance compared to the highly sensitive superconducting qubits currently being championed by rivals like Google and IBM. However, physically proving you have created these particles requires sifting through massive amounts of complex electrical conductance data to isolate a specific "topological gap." Because of the sheer volume of data, physicists rely heavily on custom software pipelines to process the results. This is where the Python scripts come in. Now, according to the critique, Microsoft’s data processing software contained fundamental programming errors that ultimately skewed the published results. By mishandling data arrays or deploying incorrect logic within the Python script, the software supposedly discarded "noisy" or contradictory data. Which is why it only highlighted the specific electrical measurements that supported the topological-gap claim. The researchers behind the critique argued that this makes the findings invalid, suggesting the heralded "quantum leap" was actually a false positive generated by bad code and not a product of groundbreaking physics. However, Microsoft is pushing back hard against these allegations. The Redmond giant has formally rejected the criticism, saying that it's just a minor anomaly rather than a fatal flaw. According to the company, while there may have been a minor oversight in the data parsing scripts, it does not alter the fundamental reality of their physical experiment. Just weeks ago, Microsoft unveiled the Majorana 2 quantum processor, a milestone so significant that the company boldly accelerated its timeline for a commercial quantum supercomputer from 2035 down to 2029. But the new software allegations reopen an old wound. Microsoft's quantum division faced a remarkably similar crisis when a landmark 2018 paper on Majorana particles was famously retracted in 2021 after independent physicists discovered the data had been inappropriately cropped. That historical baggage makes the current Python-related allegations particularly sensitive. If the foundational math and data processing for the 2025 breakthrough are genuinely flawed, the highly anticipated 2029 commercial timeline could easily be delayed or, worse, cancelled.
  • Recent Achievements

    • Dedicated
      Scoobystu earned a badge
      Dedicated
    • First Post
      Tom Schmidt earned a badge
      First Post
    • One Month Later
      D0nn13 earned a badge
      One Month Later
    • Rookie
      +ChiefOfNeo went up a rank
      Rookie
    • One Year In
      Tom Schmidt earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      467
    2. 2
      +Edouard
      177
    3. 3
      PsYcHoKiLLa
      123
    4. 4
      Michael Scrip
      82
    5. 5
      Xenon
      76
  • Tell a friend

    Love Neowin? Tell a friend!