New PC build won't power up


Recommended Posts

OK, last night, I spent several hours putting together my brother's new PC build, and annoyingly, it won't power on at all. Here's the specs:

 

  • Motherboard (Socket 1150): MSI Z87-G43
  • Processor: Intel Core i5-4670K (Haswell)
  • SSD: 250GB Samsung 840 Series
  • HDD: 1TB Western Digital Caviar Black
  • RAM: 16GB (2x8GB) Corsair Vengeance Jet Black
  • GPU: XFX Double D Radeon HD 7950 3GB GDDR5
  • PSU: Corsair CX600M
  • Tower: Zalman Z9 Plus
  • BD Drive: LiteOn IHOS104
  • Sound Card: ASUS Xonar DG
Now, I've triple-checked all of the connectors; the necessary power connectors to the motherboard are in and secure, all the fans are correctly connected (including the CPU fan), and even the case connectors for the lights and switches are in correctly (in the JFP1 pin area, as instructed by the manual).  :iiam:
 
So far, I've tried a different kettle lead (from my PS3) to see if that was the culprit, but no luck there. The only thing I can think of (much to the annoyance of my brother) is a faulty part; either the motherboard, the PSU, or the tower.
 
Please help!  :pinch:
Link to comment
https://www.neowin.net/forum/topic/1161406-new-pc-build-wont-power-up/
Share on other sites

It does sounds like a faulty component.

So strip it back to basics.

take out one of th HDD's

all but one stick of RAM

the graphics card (if you have onboard...wich you should)

the sound card

and the blu-ray...

 

Hopefully then it works

 

Then add the components back one at a time...when it fail there's your component.

 

If it doesn't work with it stripped back, switch the HDD and RAM incase the ones you left in are the fault.

Issue detected! It looks like it's the tower that's at fault. I took the front panel connectors out of the motherboard, then did the old screwdriver trick to make contact with the power switch pins, and lo and behold, it turned on! So, I've gotta get in contact with Dabs to arrange for a replacement tower.

Don't! Remove the front panel of the case and re-connect the power button. For some weird reason it comes disconnected.

I've got exactly the same thing with Z11! Was puzzling as hell...

 

Oh snap, I'm likely too late with this...

 

Yep, you are. :p My brother already ordered a replacement case which came today, and then I finally realised my mistake when building it. It's all up and running now. No harm done, anyway; already opened up a return with Dabs for the first case and they'll give him a refund (plus the postage) under the Distance Selling Regulations. :) Just tried to deal with another issue now involving Microsoft Office 2010. He bought a 3 PC license, only 2 have been used (his laptop and my PC), but it won't activate his PC; tried online and through the automated phone service. Gonna have to ring up tomorrow to try to solve it.

This topic is now closed to further replies.
  • Posts

    • AnyDesk 9.7.7 by Razvan Serea AnyDesk is a fast remote desktop system and enables users to access their data, images, videos and applications from anywhere and at any time, and also to share it with others. AnyDesk is the first remote desktop software that doesn't require you to think about what you can do. CAD, video editing or simply working comfortably with an office suite for hours are just a few examples. AnyDesk is designed for modern multi-core CPUs. Most of AnyDesk's image processing is done con­currently. This way, AnyDesk can utilize up to 90% of modern CPUs. AnyDesk works across multiple platforms and operating systems: Windows, Linux, Free BSD, Mac OS, iOS and Android. Just 7 megabytes - downloaded in a glimpse, sent via email, or fired up from your USB drive, AnyDesk will turn any desktop into your desktop in se­conds. No administrative privileges or installation needed. AnyDesk 9.7.7 fixes: Fixed an issue that prevented users from creating meetings without an active license Download: AnyDesk 9.7.7 | 8.0 MB (Free for private use, paid upgrade available) Links: AnyDesk Home Page | Other platforms | Release History | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
    • I used a Pixel 10 Pro XL when it first came out for about 8 months. When I first got it, it was using Google assistant and that was fast, when asking it to call somone etc. Then it automatically switched with some update to Gemini. Doing even the simplist of things like asking it to call someone in my contacts was soooooo slow compared to Google assistant. I guess it had to go out to the cloud to do that? Back on iPhone and while Siri is dumb right now, it does do those simple things, like call someone, set a timer, star the stop watch etc, really fast. That an while I like Google Material Design 3 over iOS 26, they Pixel 10 Pro XL was so slow in comparison to the iPhone 17 Pro I am using.
    • I use Gemini in my rotation of AI clients...that work pays for. It is good at most things, better than copilot for imgage searching and making images, worse at writing vs Claude and way worse at hadling technical issues when it comes to Azure stuff. I also use YT premium and maps. Anything else Google is a pass for me. I have now seen multiple people locked out of their Google accounts for reasons that are just very vauge.
    • Microsoft is building an AI datacenter that "uses less water than a fast food restaurant" by Ivan Jenic Image: Microsoft Microsoft has announced plans to build a new datacenter campus in Pecos, Texas, as the company continues to invest billions in AI infrastructure. The new facility, called project Kilby, will reportedly have a capacity of 2 gigawatts and will be one of the largest single capacity additions in the company’s history. To power the campus, Microsoft signed a 20-year deal with Chevron to supply natural gas from the Permian Basin, America's largest oil field. This deal is set to become the largest collaboration to date between a U.S. oil and gas giant and Big Tech. It’s no secret that Big Tech has often been criticized for exploiting natural resources for its AI developments. Microsoft is trying to mitigate some of that negative consensus by promising to build its own power supply for the new datacenter, independent of the public grid. The Pecos datacenter will be powered by a power plant hub, built by Chevron, with up to 2.5 gigawatts of gas-fired capacity, with potential to scale to up to 5 gigawatts. The facility will include at least seven GE Vernova turbines, with first power potentially coming online as early as late 2027 or early 2028. The power plant hub is part of an approximately $7 billion investment by Chevron, making it one of the largest dedicated energy projects tied to a single datacenter campus in the U.S. Microsoft hasn’t publicly disclosed the amount it’s investing in the new datacenter. Microsoft has also committed to implementing a closed-loop cooling system that will only require an initial water charge to operate. The company said that “the total lifecycle water use of this datacenter is only a fraction of that consumed annually by a typical fast-food restaurant.” What the press release doesn’t mention, however, is how much water the natural gas plant itself will consume, or how a 20-year fossil fuel commitment squares with the company's pledge to be carbon negative by 2030. The construction of the new datacenter should provide over 6,000 construction jobs at peak build-out, and create hundreds of operational job roles once the facility is built. Via: Reuters
  • Recent Achievements

    • Dedicated
      tuben earned a badge
      Dedicated
    • Week One Done
      mnsgroup earned a badge
      Week One Done
    • Conversation Starter
      sumytbe earned a badge
      Conversation Starter
    • One Year In
      B4dM1k3 earned a badge
      One Year In
    • One Year In
      DarkWun earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      524
    2. 2
      +Edouard
      196
    3. 3
      PsYcHoKiLLa
      94
    4. 4
      Michael Scrip
      82
    5. 5
      Steven P.
      67
  • Tell a friend

    Love Neowin? Tell a friend!