Yeah, this is just plain "living in ones' own bubble" now. The entire reason that FH has been delayed is down to three factors:

 

a) The technology that makes FH a thing, the Falcon-9, has seen several evolutions in both ecosystem and iteration, both of which make FH a better and more robust machine overall;

b) An abundance of caution and careful planning on SpaceX's part -- not only based upon lessons learned from Falcon-9 but also because they want zero failures on all components whenever and however possible and are going to extraordinary lengths toward that end;

c) The rather annoying and sometimes unreasonable USAF and NASA parameters and requirements that seem to change or be modified whenever it suits those parties' interests ... and this item really tends to hold up the show more than a) and b). In some cases these parameters and requirements have come at times when SpaceX were nearly ready to ship hardware for testing and certification. I'm sure we remember the one or two instances quite well that nearly got SpaceX taken out of the running to launch NRO payloads such as "vertical payload loading", and so forth, when it was rather unreasonable (and costly for SpaceX) to perform such mating and loading procedures back then.

 

So yeah. More instances of NASA, MSFC and FAA people living in their own world. /sigh

22 hours ago, FloatingFatMan said:

Not just SLS/Orion... Just how many Apollo/Saturn 5's of the same configuration did NASA launch before they started putting people in them, hmm?

 

Going back a bit, but I remember that Apollo 4 and 6 were for launcher and Apollo 7 for capsule, so we had a few tests anyway...but in a "political cold war" race. The real kicker was the first shuttle launch with crew. This was a disaster that was luckily avoided...

 

1) The shuttle could have been autonomous with 2 connections from mid deck to upper deck, but was not done for some reason. Then there was the issue of flying over California and the implied need for crew.

 

2) Acoustic damage to a flap as well as paint stripped off the launcher and covering the windscreen led to the deluge system...acoustic damage was not properly handed.

 

3) Tile damage and a burn through to one undercarriage tub came close to damaging the undercarriage assembly.

 

4) Heat shield damage from acoustics as well as an RCS strut failure.

 

5) Forward external door plate damage due to improper heat tile placement.

 

6) John Young had stated that if the crew had known then, they would have leveled off and ejected.

 

7) Four ground crew died during prep of the mission

 

In hindsight, real dumb idea to put the crew on the first flight.

 

//

 

This situation with SLS is plain silly. NASA is not at fault here, it's a political request...and we dig deeper...one may find a certain "group" trying to keep it relevant before FH flies...

 

FH at 53 tonne....SLS at 70 tonne

 

10 launches of heavy would be 900 million for 530 tonne....SLS will be over 1 billion for a launch of 70 tonne...and the larger SLS will cost more and years further down the road.

 

My take on this...all political and in the end, safety will over ride this and it's fate will be sealed, if not cancellation, then only launching a few for "contrived" science missions.

 

In the end, Not NASA, they are just taking orders...:s 

  • Like 1

Yep. It's purely political, and not out of necessity. Pet projects for the pork barrel because Washington and the Mil/Gov Contractors said that they needed more money, and only because of that.

 

And of course SLS will be inherently more unsafe by orders of magnitude -- anything that uses Solids is going to be, simply from the lack of abort options as well as the "things that go big-time kaboom" factor -- but they don't wanna talk about that ...

 

Oh, and in a sheer display of "galactically stupid", let's put people in an untested vehicle while we're at it. Yep ... Nothing could possibly go wrong with that. Even though that same brain-trust is screaming to anyone that'll listen that SpaceX's vehicle should be delayed (and already has been) because of the risk to human crews, even though SpaceX has gone over and above to ensure those systems are quadruple redundant in safety. Yep. No fault in the logic tree there. It was a bad idea with the Shuttle, and it's a bad idea with SLS/Orion.

 

Yeah, there's some true politics at work here. If I were SpaceX, I'd be closing up shop and leaving the U.S. market for good, and flying that big fat middle finger as I left telling Uncle Sam to kiss my rear end as I shut the door. That's how truly ###### off I'd be if I were Elon Musk & Co. with the US Government and the whole lot of 'em that have perpetuated this farce. And you know what? I wouldn't blame him at all. With that kind of scratch, SpaceX would already have ITS (BFR and BFS) just about built and we'd be talking about crew rosters and mission sets instead of the complete waste of time and resources that SLS/Orion have turned out being.

 

Do I want that scenario? SpaceX leaving U.S. soil out of sheer disgust? Of course not. Could it happen? Unlikely to never. But for anything to truly be any different, things in Washington need to change first. And we've really got some entrenched OldSpace there who are paid very well to make sure that things remain as they are.

 

So, the short answer is OldSpace will make sure that SLS/Orion remains relevant however they can. It'll get built. It'll fly. Hopefully no Astronauts are killed. One thing that is sure to happen -- insane amounts of money are going to be spent, and there's no amount of logic that will prevent it. And the Senator Shelby's and the ULA's and the Boeing's of the world will laugh all the way to the bank about it, while the rest of us "lesser beings" will be left shaking our heads in pure disgust at the whole thing.

  • Like 1

The difference here, is that NewSpace doesn't need government contracts...it helps pay the bills for growth...but is not "life or death"

 

SpaceX will plug along, follow all commercial crew milestones...and carry out the commercial crew services.

 

At the same time, the real work gets done behind the scenes for Mars. I actually prefer this method, it takes longer, but SpaceX controls their destiny and have paid in full on their own.

 

All will work out in the end....just wait till we have international involvement in Mars...can't wait.  :)

 

Pssst...."unwind" and try decaf .....  while throwing rocks at things...it helps...:woot:

  • Like 1

Just my opinion, but I think they are more concerned with RD-180 data. I would also think they could waive the RD-180...long history.

 

The Atlas V has been in a somewhat static state for some time...the 7 flights, if required, would be waived.

 

I would also think that NASA has a sensor package on board all NASA flights as well...I am pretty sure that this is why Orbital was told to use Atlas for the next Cygnus.....I don't think NASA liked parameters with the new engine swap.

 

With SpaceX...too much design change for them to handle. They want a solid block 5...which is where they were going anyway...

 

Then again...I'm just an armchair typist....:D

2 hours ago, IsItPluggedIn said:

So after the upgrades/changes to Atlas to make it human rated, will they need to fly 7 flights?

There is a serious concern in NASA and GAO about flying people Atlas V at all. The issue is the RD-180 engine. GAO calls it “a potential safety risk.”

 

First, whatever insight we have about RD-180 being human rateable comes from the US license to produce it here. That info is somewhat outdated, the US and Russia aren't on the best of terms, the contract limits the infos dissemination, and the license expires in 2022 so absent a new license it's not a long term solution.

 

Also hurting confidence is the partial RD-180 failure during a launch last year - RD-180 shut down several seconds early and the Centaur upper stage saved the mission with just a few seconds of propellant to spare. 

 

As such, they can't close 'black zones,' parts of the S1 burn where the crew could be lost.

 

Second is cost. The head of Boeing's program said 2 years ago Atlas V's cost made their business case hard to close. He flat out stated they were going to talk to SpaceX about flying Starliner on Falcon 9, which has an engine-out capability Atlas V doesn't have, and there were later statements about adding Vulcan to their stable. The working theory has been they'd fly their contracted Atlas V flights then switch to the alternates.

 

 

 

 

Edited by DocM
  • Like 1

Surprise to no one: ASAP doesn't seem to be impressed with the idea.

 

http://spacenews.com/safety-panel-raises-concerns-about-crew-on-first-sls-launch/

 


Safety panel raises concerns about crew on first SLS launch

WASHINGTON  A NASA independent safety committee wants NASA to provide a compelling rationale for putting astronauts on the first flight of the Space Launch System, a proposal NASA is currently studying.

In a statement at the beginning of the Feb. 23 meeting of the Aerospace Safety Advisory Panel (ASAP), chairwoman Patricia Sanders said that if NASA decides to put a crew on the first SLS/Orion launch, Exploration Mission 1 (EM-1), it must demonstrate that there is a good reason to accept the higher risks associated with doing so.

"We strongly advise that NASA carefully and cautiously weigh the value proposition for flying crew on EM-1," she said. "NASA should provide a compelling rationale in terms of benefits gained for accepting additional risk, and fully and transparently acknowledge the tradeoffs being made before deviating from the approach for certifying the Orion/SLS vehicle for manned spaceflight."

"If the benefits warrant the assumption of additional risk, she added, we expect NASA to clearly and openly articulate their decision-making process and rationale."

NASA announced Feb. 15 that it was beginning a study of the potential of adding a crew to EM-1. Under current plans, that mission, scheduled for launch in late 2018, would fly without a crew, with the first crewed flight, EM-2, planned for no earlier than 2021.

That study is in progress and is expected to be completed by late March or early April. Were going back and reevaluating the trades of why we decided what we did regarding not flying a crew on EM-1, said Jason Crusan, director of advanced exploration systems at NASA Headquarters, during a Feb. 23 panel on human spaceflight held by the Royal Aeronautical Society at the British Embassy here. Theres many reason why we decided to do that, a lot of the related to risk posture, and a lot of them related to budget realities.

"Under the current approach, NASA would fly a relatively demanding mission on EM-1 lasting more than 20 days, really pushing the limits of where Orion and SLS can actually perform," Crusan said. "EM-2, with a crew, would be a more conservative mission to test the performance of the life support system. That approach, he said, would be reconsidered if a crew flies on EM-1."
>
>

  • Like 2
19 hours ago, DocM said:

There is a serious concern in NASA and GAO about flying people Atlas V at all. The issue is the RD-180 engine. GAO calls it “a potential safety risk.”

 

First, whatever insight we have about RD-180 being human rateable comes from the US license to produce it here. That info is somewhat outdated, the US and Russia aren't on the best of terms, the contract limits the infos dissemination, and the license expires in 2022 so absent a new license it's not a long term solution.

 

Also hurting confidence is the partial RD-180 failure during a launch last year - RD-180 shut down several seconds early and the Centaur upper stage saved the mission with just a few seconds of propellant to spare. 

 

As such, they can't close 'black zones,' parts of the S1 burn where the crew could be lost.

 

Second is cost. The head of Boeing's program said 2 years ago Atlas V's cost made their business case hard to close. He flat out stated they were going to talk to SpaceX about flying Starliner on Falcon 9, which has an engine-out capability Atlas V doesn't have, and there were later statements about adding Vulcan to their stable. The working theory has been they'd fly their contracted Atlas V flights then switch to the alternates.

 

 

 

 

The following is my opinion on the matter...

There appears to be major agency concerns with "everything and anyone" when it comes to human rated launchers...and a major "fail" in logical business assessments.

Lets pare this down to a somewhat logical approach to a business decision, with rough projection dates.

1) Roscosmos and CNSA have human rated launchers....safe to take them off the table.

2) Who do we have, right now, that have the best possibility of a manned launch...before details, that would be SpaceX with F9 and ULA with Atlas V

3) Who has the best launch record for safety and reliability....that would be ULA with Atlas V...and they got that way with RD-180's, an engine that has been around for 16 years. 

4) The quality of the RD-180's has been called into question at times, with one glitch of note...a very low statistical occurrence when it's history is taken into consideration. Quality is being addressed by the manufacturer. Bottom line...look at ULA's record...it speaks for itself.

5) If there is an issue, state the true issue..is it documentation, trade secrets..what is the core issue with the engine.The RD-180 is dependable and will get the job done, short term, till new launchers are ready. So pick a time frame such as 2020 or 2022, the RD-180 will work until then.The core reason has to be stated because it's doing a great job and earning ULA some major cash for a long time and continues to this day, and several "alphabet agencies" don't seem to have issues with use on their very expensive "secret" payloads...

6) The Vulcan was casually stated for NET 2019. Do we really think it will be ready in time..when the final engine selection still has not been done...that is 2 years away, is anyone willing to bet on that.

7) Now we have issues with F9. Block 5 will take care of the design...but...we have issues with fuel/crew procedures...and it appears to be deep rooted.

8) Will New Glenn be ready by 2020 or 2022...I would not bet on those circumstances for what has been accomplished so far.

9) We need 2 launchers which will enable coverage if one is down for an investigation...therefore it doesn't offer much coverage to have F9 lifting CST....nice option but defeats the purpose of a multi launcher capability, unless Atlas V can lift a Dragon 2 as well.

10) Poker time...for a business decision, which one HAS to make for 2019/2020...which way do you go...My money is on F9 and Atlas V with the RD-180's...no brainer.

11) Poker time...for a business decision, which one has to make for 2022...that is not quite 5 years down the road. This is a problem due to Blue origin engines or a selection of AR-1 for Vulcan...and if New Glenn will be ready in time and be human rated. As far as I can tell...correct me if wrong, but Vulcan was intended to be human rated...but then, which engine....this is a real spin of the roulette wheel...just plain guessing.

12) Decision time....short range till 2019/2020, my money is on F9 and Atlas V...period. For a decision on 2022, I would go with my 2020 decision and make another correction when more data available in 2020 on the other two launchers.

13) Bottom line...Does anyone really want to fly?, if so, "can the politics"...the logical decisions for a 2 launcher system is staring at everyone's face.

14) Ulterior stance...do these issues have more politics than what is showing, such as setting up SLS as a backup and justify it with "bull cookies" for excuses about the 2 most obvious choices.

15) My call in the end...If I have major assets at risk, that must launch...easy decision....scrap the politics/silliness and get on with the F9 and Atlas V for now...modify later. Choose wisely or pony up for a slew of Soyuz tickets. 

Conclusion for my opinion...SpaceX runs with Block 5 and NASA chooses when to load crew...because SpaceX is not likely to change from using densified goodies...period. My opinion is that Atlas 5 will have the RD-180 issue waived on the grounds of past and present performance, with a stipulated time frame for re-evaluation of the other launchers. This will enable a 2 launcher system. Boeing will have to ensure CST config for Atlas is acceptable. Last but not least, I was under the assumption that Dragon 2 can abort anywhere and is capable of an emergency re-entry..if so, then Boeing should be held to the same standards which takes that out of the equation.

Have at her guys...your turn, but use logic for a viable business case because "politics" will have an ulterior motive and brings up the phrase..."Be carefull what you wish for...you just may get it!".

 

Pssst...I don't need to hear anyone quote..."you don't understand the politics"...This is a discussion of the best way to get commercial crew up flying....getting buried by politics is a disaster brought on by government departments/agencies when a viable means is available now, for the immediate time frame.

 

:D

16) only one currently flying launcher has first stage engine out capability, Falcon 9, and it has been successfully flight proven during an ISS run. The cargo was delivered to ISS in spite of an engine failure, and it arrived early. Can't get more germane than that.

 

17) only one ISS-bound vehicle has survived a launch vehicle disintegration intact, Dragon, and it survived in spite of not having a launch abort system. That vehicle didn't have parachute software to deploy under such circumstances and was destroyed on impact with the ocean, but now all Dragons do.

  • Like 2

Quite true....but just going by the numbers and the probability of loss, Atlas V would be well within boundaries.

 

Don't get me wrong, I am a die hard SpaceX fan, but the numbers for a business case alone, warrant Atlas V's reliability as top notch. Boeing on the other hand, appear to have issues.

 

I feel that Dragon 2 will be the safest by far, but will NASA hold the CST to the same standards.

 

As far as launchers go, from a business perspective, the numbers dictate F9 and Atlas V short term. When the other guys get up to speed....re-evaluation time.

 

We need 2 launchers because (blip) happens and downtime...the other keeps hauling.

 

:D 

This is an important time for non commercial crew as well....with commercial interests soon to become reality, either on the ISS or independent facilities, we need crew flying as soon as possible...then move on to crewed service/assembly/repair/print  possibilities...but we have to get flying asap. 

 

To be honest, I wish that a SpaceX astronaut would be the first to use Dragon 2, one can dream.

I know it would never happen, but just imagine the first Dragon 2 crewed by a SpaceX crew, pull a few orbits and propulsive land at LZ-1.

 

Then when they get out of the capsule, go on the microphone and state.....any questions now!

  • Like 1

Yeah, that'd be a sight to behold.

 

"Well .. now that that's out of the way. No, worked great. Not a problem to be had. What's that? I don't know, you'd have to ask Mr. Musk about an adapter for CST-100. I'm not the one who makes those decisions."

 

:laugh::rofl:

  • Like 1
23 minutes ago, DocM said:

There's nothing stopping SpaceX from making a crewed flight before the CCtCap milestone test flights, they just won't get milestone credit for it

Maybe they should do it anyway, just to show NASA and all the other naysayers up. Start Dragon 2's UTP Missions up on SpaceX's dime, take care of that pesky Certification checklist that NASA can't be bothered to get on the ball with on a timely fashion.

  • Like 1

The backlog of commercial customers doesn't afford much time for any "adventures" so far. I imagine if this wasn't the case, put a payload in the trunk and still have fun.

 

SpaceX will have their day...that I am reasonably sure of...just have to get that massive backlog of paying customers launched...and that is a big undertaking along with commercial crew...they have no choice but to up the cadence soon.

 

:D

Yeah. That's likely the only reason SpaceX hasn't done so already. That and the OldSpace interests in Washington pulling some kind of stunt like "Antitrust" or "Anti-competitive Business Practice" lawsuit.

  • Like 1

Commercial Crew demo flight dates

 

SpaceX-Demo1: uncrewed, November 11-25 2017 (!!)
SpaceX-Demo2: crewed, May 2018 (~30 days)

 

Boeing-OFT: uncrewed, June 2018 (~30 days)

Boeing-CFT: crewed, August 2018 (14 days)

 

Commercial Crew services begin late September, 2018

  • Like 2

Awesome news! :yes: I'm sure as that date draws closer we'll get information about the full mission itinerary and checklist of things they want to put the Dragon 2 through. Likely it'll be the full monty, starting with the basics (Control, CC-I/O, LS, Diagnostics, etc) ... gonna be mostly for the Engineers and GSS people this time around. If you're a Space Junkie like we are, I know we'll be marathoning the SpaceX streams like it was the Olympics. :D 

 

Can't wait.

  • Like 1
  • 1 month later...

"Crew Seat Incline CMPLT"?! They needed a milestone for that?! To incline the [expletive] seats in a more-or-less 94~112 degree angle??

......

............

*chortle* .....

 

OH. And now we see who's really behind the wheel (read: ever-so-slowly turning, groaning, rusted gears), folks. It ain't ULA after all ... but since we already knew that ... yeah. Here's my shocked face. If it works then fine, whatever -- but I really think they're "milking Bessie" at this point. Orion PLUS Starliner?? Ugh. Someone's got their hands in the till. This should have been done already.

 

And SpaceX have been nothing but underfunded, stonewalled and hampered from the get-go then expected to be professionals, all the while doing platform upgrades, record breaking, trend setting and R&D -- and they're STILL just about ready to fly Dragon 2 and Falcon Heavy despite all of it. OldSpace can't even get it together under the best of circumstances ... it really goes to show who needs the political climate to shift favorably and who needs the swift kick in their collective rear end, doesn't it?

 

*sigh* Senator Shelby and those who think like him need their heads examined for supporting OldSpace like they do. SpaceX and the other NewSpace companies are the future.

  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Sihoo Doro C300 Pro V2 Ergonomic Office Chair review: The Ikea of chairs by Steven Parker I've reviewed a few gaming chairs over the past three years or so and generally found them to score well in our reviews. SIHOO reached out asking if I was interested in taking a look at their flagship chair, the Doro C300 Pro V2. I never got the chance to check out its predecessor, but the V2 is described as an "Adaptive Ergonomic Chair." It became available to buy in April of this year. Let's get things rolling with a closer look at the specifications and features. Specifications Doro C300 Pro V2 Model Ergonomic Materials Mesh Back and Seat; Soft PU Coated Armrests Height adjustability 45.5 - 53 cm / 17.5" - 20.9" Seat (w+d) 52 x 43 - 47 cm / 20.5" x 16.9" - 18.5" (adjustable) Backrest 52 – 60 cm / 20.5" - 23.6" (adjustable) Lumbar support Mesh built-in (adjustable) Armrest adjustability 8D Bionic Armrests Rocking angle 105°, 120°, 135° (fixed) Neck support Mesh built-in (adjustable) Net weight 27.3 kg / 59.64 lbs Weight support 150 kg / 330 lbs Colors Black, White Warranty 5 years (upon registering) Price $499.99, $539.99 Introduction At first glance, it looks like a chair that in another life wants to be a Herman Miller; It certainly looks like my Aeron Remastered, but the Doro C300 Pro V2 has quite a few more features and costs quite a bit less. SIHOO says that it is made up of a "DynaCore" system that tracks your movement and synchronizes the headrest, backrest, lumbar support, and armrests as you shift, twist, or recline. They also say that the "SyncroFlex Backrest" molds to your spine, which kind of describes how the mesh fabric works in most ergonomic chairs, but anyway. Below are the meat and potatoes measurements for the chair. Here is the same tech sheet, but in inches. Durability I would be remiss to not talk about the various durability testing this chair underwent before coming to market, as this is claimed on the product page. First of all, the chair is BIFMA-, SGS-, and TÜV-certified. As for durability, the tests undergone were: 100,000 Castor cycles tested 120,000 Armrest cycles tested 120,000 Recline cycles tested 120,000 Gas lift cycles tested 60,000 Armrest durability cycles tested 120,000 Rotation cycles tested Nothing about weights testing, though. Now that's all disclosed, now onto my own personal findings. Assembly The Doro C300 Pro V2 came in two large boxes (1) (2), and everything was packed very well, protecting the different parts of the chair. In the box, there is a folded sheet that explains the 12 steps to assemble it; they are: Remove the bottom cover on the aluminum base; Insert the five legs into the aluminum base and use ten screws to fasten them; Insert the castors into the legs; Replace the bottom cover on the bottom of the aluminum base; Place the Class 4 Hydraulics gas cylinder into the aluminum base; Screw the bottom part of the arm rests, taking care of the orientation using two screws on each side; Use three torx screws to fasten the footrest to the bottom of the seat; Fasten the backrest to the seat using four torx bolts; Fasten the armrests to the backrest using four Torx bolts (two on each side), taking care to note the orientation; Place the chair onto the Class 4 Hydraulics gas cylinder; Insert the headrest into the top of the backrest; Use two torx screws to fasten the headrest to the backrest. There's also an online guide you can refer to. Carefully unpacking the two boxes took around 15 minutes because almost everything is wrapped in plastic and protective foam; the chair assembly itself took around an hour. I say in the above assembly steps to take note of the orientation, because it's not obvious which way around the bottom portion of the armrests go, and although there is an L and R on the bottom of the armrests, it also wasn't clear from the instructions which was actually left or right, facing the chair, or in the seated down orientation? Anyway, I ended up putting the bottom portions on the wrong sides, and after securing one of the armrests, I discovered that although it was on the correct side, the armrest base could rotate a full 360°, but not when bolted to the chair, so I had to remove it, rotate it, and then bolt it back on. Truly an Ikea experience! Also, to complicate things further, although all the parts are labeled from A to X (yes, that's 24 parts) unhelpfully, these letters do not appear on the parts themselves or the package with the bolts, screws, and washers. There's also a pair of protective gloves in the box, but I think they were made for much smaller hands than I have. Even my friend, who is 5.1, had difficulty putting them on. Once assembled, I needed to sit down. Anyway, as I said, it looks quite similar to my Herman Miller. And here is the back of it. If you look at the product page and on Amazon, it seems like a lot of thought has gone into the chair itself and what it's capable of, but there is no mention at all about the castors, and this is an area where I think the chair trips up quite quickly. I found it difficult to move the chair in any direction. I asked a friend who came to visit me earlier this week to test my findings, and she said that the wheels were "no good," so it definitely isn't just me. I am 6'2 myself and a big guy, I work from home and gained a few pounds from mostly staying in and the hell away from other people. However, the Doro C300 Pro V2 is rated for up to 150kg (330lbs), which in my case is used well within its max rating. Ergonomics The number of adjustments you can make, right up to setting it in nap mode — which I haven't fully tested yet — is what you'd expect from a premium chair. Yes, you can go up and down (max 7.5 cm adjustment), rock back and forth (with tilt adjustment), and lock the chair between three stages of 105°, 120°, 135°, which is not quite as flat as the AndaSeat I tested at 160°. Some thought has also gone into the "8D" armrests, too, which are cushioned but quite firm; you'll only know it if you press hard into the PU-covered tops, which give about half a centimeter, but it's enough to ensure your skin won't get awkwardly stuck to it in warmer (or sweatier) conditions. It almost feels like plastic and is very easy to keep clean. However, the armrest positions move far too easily, and I am not sure what that "elbow" function is. Maybe it is good for a short person with short arms, anyway, I never used it and kept it flat at all times. There are eight levels of adjustment for the armrests, they are: backwards, forwards, swing left/right, height up and down, tilt, and 360° rotation, which can be handy for desk clearance. As I said, the armrest pads shift far too easily, which could give off an ergonomic vibe, but who wants the armrest sliding when you are shifting weight? The height adjustability does lock into place when lifting and adjusting. Comfort This is ultimately what it boils down to at the end of the day, right? Quite a lot of reviews praise the comfort of this chair, and I don't disagree that the mesh seating is quite comfortable. I am used to the material from my daily Herman Miller. However, the backrest cannot be locked into place, and this is actually a feature; as you shift or recline yourself on the chair, the backrest moves with your body. It took some getting used to. The lumbar gives ample support, but I would have preferred an adjustable one built into the seat base, as this causes the backrest to move up and down at will. Again, as with my previous chair review, this chair is also rated for tall people, but nowhere in the product documentation does it say how tall. Being 6'2 myself, I'm happy to say that the backrest is tall and wide enough, and thought has been given to being able to adjust the neck rest, but as others have mentioned in their reviews, people as tall as 6.2ft is about the limit for the neckrest. Conclusion What I didn't like The footrest is rated for 15kg (33 lbs), which to me seems a bit light, and after looking online, it seems like a chair footrest for adults must be at least twice that rating. In all honesty, they are just hollow metal tubes, so it is not recommended to let a kid sit on them. I also feel like it doesn't really go out far enough for my height, so that kind of puts the dampener on me being able to use it regularly. I'll just have to continue to use my subwoofer as a footrest! I do not like the armrests being able to shift around as easily as they can, and they are a little too forward-positioned in the chair to comfortably sit close to my desk, because even in the lowest height position, they don't allow me to go under the desk like is possible with my Herman Miller. I also feel like this chair could have been delivered partially constructed, especially the armrests on the seat, and why the aluminum base wasn't already pre-constructed (without the castors) is baffling, considering it would have fit in one of the two boxes that way. The instructions also need to be clearer. On the pamphlet, there's an A to X listing (which is also used in the steps), but none of the physical parts use this lettering system! What I did like I'll be honest, I haven't used it for very long, just one week, and seating comfort is subjective after all! Any spills wiped straight off it, the stitching, and the lines look great, not a fray to be seen or stitch out of place. It looks kind of cool, too. My favorite feature of these seats is the nap mode. While you're not lying completely flat, it leans far back enough to make you easily doze off after a heavy gaming or working session. Overall, this chair offers plenty of comfort features. The MSRP does vary quite a bit depending on the region, at £549.99 in the UK, and €580 in Europe, and $599 before tax in the U.S. However, shipping is free, which is a bonus for such a heavy item. Is it worth it, though? At three years' warranty, I think it's a decent deal. Another firm out of Germany sent me a free replacement hydraulic gas spring for a chair that failed after almost four years, so it was well outside its two-year warranty. My advice is to always try, as you might have the same luck I did. If I could fault it at all, it would be the constant shifting of the armrests and backrest. Where to buy Although the footrest variant normally costs $539.99, it has been discounted to $469.99 on the official website in Black or White. In fact, the non-footrest variant is only $40 cheaper. On Amazon, it currently costs more at $499.99 links below. Sihoo Doro C300 Pro V2 for $469.99 (official website) Sihoo Doro C300 Pro V2 for $499.99 at Amazon US SIHOO provided a free sample without any review or pre-approval. Good to know This Amazon link is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases.
    • Making US citizens pay is a prominent tool? Joke of the week…
    • Price Drop: Save 86% on Microsoft Office 2021 Professional Plus lifetime digital license by Steven Parker Today's highlighted deal comes via our Apps + Software section of the Neowin Deals store, where you can save 86% on a lifetime license to Microsoft Office 2021 for Windows. This bundle is for families and small businesses who want classic Office apps and email. It includes Word, Excel, PowerPoint, Outlook, Teams, and OneNote. A one-time purchase installed on 1 Windows PC for use at home or work. Lifetime license for MS Word, Excel, PowerPoint, Outlook, Teams, & OneNote One-time purchase installed on 1 Windows PC for use at home or work Instant Delivery & Download – access your software license keys and download links instantly Free customer service – only the best support! Microsoft Office Professional 2021 (for Windows) includes: Microsoft Office Word Microsoft Office Excel Microsoft Office PowerPoint Microsoft Office Outlook Microsoft Office Teams Microsoft Office OneNote Microsoft Office Publisher Microsoft Office Access No faffing about with subscriptions, just classic apps that don't expire. Good to Know ONE-TIME PURCHASE INSTALLED ON 1 DEVICE Redemption deadline: redeem your code within 30 days of purchase Access options: desktop Full versions No subscriptions – no monthly/annual fees Version: 2021 Updates included* *Support for this version of Office ends on Oct 13, 2026 A lifetime subscription to Microsoft Office 2021 Professional normally costs $219.99, but this deal can be yours for just $29.97, that's a saving of $190. For full terms, specifications, and license info, click the link below. Get Microsoft Office Professional 2021 for just $29.97, or learn more Although priced in U.S. dollars, this deal is available for digital purchase worldwide. Support queries If you have queries or need support for any of the Neowin Deals, please use the contact form here. Neowin Deals are managed and sold by StackCommerce who represent Neowin on an affiliate basis. Why we post these deals We post these because we earn commission on each sale so as not to rely solely on advertising, which many of our readers block. It all helps toward paying staff reporters, servers and hosting costs. So for those that keep moaning and complaining, be thankful we're still online for you to even do that. Other ways to support Neowin Whitelist Neowin by not blocking our ads Create a free member account to see fewer ads Make a donation to support our day to day running costs Subscribe to Neowin - for $14 a year, or $28 a year for an ad-free experience Disclosure: Neowin benefits from revenue of each sale made through our branded deals site powered by StackCommerce.
    • The only reason I want to know where you from is because if you are not from the U.K, then why should you care what we in the U.K do or don't do? Racist I am not, I am fed up with the amount coming over here and feel they can come over here and think we need to support them. Do you know how much it costs this country to support these people coming over here? Even when we give them a place to live it is not good enough. We had a barge that was being used to house immigrants, oh but that was not good enough. A mate said to me at the time, when he was homeless, he would have been happy to live on the barge, instead of ending up sleeping on a bench on the beach. I am not scared to say what my family heritage is, unlike you who is scared to say where they are from or where they live. Father side U.S, mother side Wales, still have family living in the U.S. A mate who sadly died a few years ago, had a load of people from different races recording in his studio, I got on with all of them. Skin colour don't bother me, where they are from don't bother me. Religion don't bother me as long as they don't push it onto me and it is not crazy stuff. I am not religious. But if you are not living in the U.K, then why should you care if we are in the E.U or not? This the problem, too many people poking their noses into where it don't belong. But you believe what you believe, if you think I am racist, then be it, I really do not care. Just grow a pair
  • Recent Achievements

    • Conversation Starter
      jessse3334 earned a badge
      Conversation Starter
    • Reacting Well
      JuvenileDelinquent earned a badge
      Reacting Well
    • One Month Later
      Excellence2025 earned a badge
      One Month Later
    • Week One Done
      Excellence2025 earned a badge
      Week One Done
    • Week One Done
      flexorcist earned a badge
      Week One Done
  • Tell a friend

    Love Neowin? Tell a friend!