Recommended Posts

^ and my guess is there won't be...unless we have an alphabet agency with "issues" with everyone not on their favorites list.

 

Until I see a line item number and the category used, in a particular documented process to present it as an "issue", and with the coherence to defend...it's outright garbage.

 

15 point analysis on last page

 

They have bigger problems than this "issue".

 

:s

a few additions to the collection...

 

 

 

Updated Collector Cards and Bookmarks Available Now!

https://blogs.nasa.gov/commercialcrew/2017/03/29/updated-collector-cards-and-bookmarks-available-now/

 

  • 3 months later...

Hot off the presses: 

 

New Commercial Crew flight test NET dates. SpaceX moves left a month from the last stated estimate of March 2018.

 

Targeted Test Flight Dates

 

SpaceX

Demo Mission 1 (uncrewed): February 2018
Demo Mission 2 (crewed):June 2018

 

Boeing 

Orbital Flight Test: June 2018
Crew Flight Test: August 2018

  • Like 1

The interstage fairing, the circumferential airflow disc, the production issues (out of round clamshells), the RD-180 documentation issues, the risk of using GEM solid boosters (remember the Delta II GPS launch?) etc.

  • Like 1

Had to look that one up.... 

 

a portion of a manned rocket launch trajectory where the premature shutdown of any or all running booster engines will lead to loss of the re-entry vehicle and crew subsequently due to the over temperature or structural loads incurred from the resulting trajectory.  Is that too muddy?  Black zone does not mean what is going to happen in a normal case, only if an engine (or two or three) quits. 

The Falcon 9, because it's so powerful, flies above those zones entirely during flight. It is doing things "the correct way". Likely an orbit of a Dragon 2 when the S2 shuts down after launch will be about the same as a Cargo Dragon headed for the ISS (around 250x250 km parking orbit). No problem. Something goes wrong, they can abort however is appropriate. And there's no issue. We've seen how the S1 comes down a lot when it lands on the ASDS -- same thing applies here and the Dragons (Cargo and V2) can do the same thing during an abort, only they'd land in the drink.

 

Atlas-V/Centaur doesn't have the power to get above the "black zones" until the Centaur is almost 3/4 of the way finished with its' burn. CST is going to be the single heaviest thing the Atlas-V will ever launch, and they're using a flight profile that takes advantage of gravity to assist in getting CST into LEO in order to overcome that lack of power. That's why these "black zones" are coming into question also because there's a chance that CST could slightly contact atmosphere flying horizontally, at near-orbital speeds, still under thrusted power as it's trying to reach orbit. That's a very, very bad thing.

 

Delta-IV Heavy isn't Human-Rated, so they CAN'T use that (otherwise they would have chosen it and not stopped production), nor can it be made Human-Rated.

 

So yeah, there's way more I could go on and on about with this subject, but that's the juicy parts.

Yep. Good at launching satellites. Cargo runs are the limit for the Atlas-V/Centaur.

 

ULA really, really needed Vulcan to be on the 2018 schedule they originally wanted ... then they'd have a contender at least punching in the same weight class as Falcon-9.

2 hours ago, DocM said:

Yup....that's the advantage of having 1.9 million lbf of thrust on tap to MECO vs. Atlas V's 860,000 lbf + 2 boosters lower down.

Correction. 

 

And, the largest payload Atlas V has ever pushed uphill was the Cygnus AO-4 ISS cargo mission: 7,492 kg.

 

Dragon CRS missions run at least  9-10,000 kg, and Crew Dragon much more than that.

Edited by DocM
  • Like 1

Been thinking about this some more today. It's a really, really bad idea to keep CST on Atlas/Centaur. There's almost NO performance margin at all. Remember the LOX oversaturation problem during one of the Cygnus launches near the end of the S1 burn? They nearly lost that payload because there wasn't ANY additional performance in that vehicle to spare, and the Centaur engines are SO underpowered that ULA might as well be using squirrels on treadmills.

 

CST isn't a Cygnus. It's far heavier. We're talking Cargo Dragon and a bit type of heavier. Even if they employ a Dual Centaur it's not gonna be enough until 3/4 to 4/5 of the S2 burn is finished before they have enough energy to achieve a minimum orbit, and then again to finalize their parking orbit -- even with their flight profile shenanigans using gravity. That's assuming they don't use up all their fuel just getting there ... otherwise it'll be a short flight.

 

Better way to go, not to mention cheaper, is to just hire SpaceX to tote CST uphill on a Falcon-9. Throw a nice LDSM (Long-Duration Service Module, loosely based on Cygnus tech) full of goodies along with it too. They've been wanting to try out that hardware anyway, why not give ULA more bang for their money? Way, WAY cheaper than an Atlas/Centaur and they can save that rocket for something it was actually designed for.

 

*sigh* Alright. Rant over. Had to get that out of my system. :laugh::rofl:

 

Notable: Boeing will only build 3-4 Starliners total. SpaceX has a Dragon 2 assembly line as it'll be used in at least 2 NASA programs; Commercial Crew and Commercial Resupply Services Round 2 - with Boeing being eliminated from CRS2. The upcoming lunar orbit Deep Space Gateway is a possible third, and there are potential commercial users and the lunar flybys.

 

The Dragon Claw connector attached the solar arrays, thermal radiators and other connectors in the Trunk to the spacecraft.

 

MLqRVIE.thumb.jpg.f34bbc237871a65b85da843f35a6e8af.jpg

 

Edited by DocM

Thanks @DocM. :yes: 

 

What we can glean from this:

 

a.) SpaceX is in it for the long haul with Commercial Crew.

b.) Build quality is excellent ... doesn't get much prettier or tidy than the image above.

c.) Even with reuse, Dragon 2's are going to come off the line as needed for the foreseeable future. Is it the American equivalent of the robust and reliable Soyuz platform? Probably .. lots of room to innovate and improve this platform as technologies evolve.

d.) We haven't heard the last about propulsive landings .. mark my words. That's still gonna be a thing eventually. :D 

e.) Boeing/LockMart/ULA just aren't committed to Commercial Crew now that the "big money" contracts have been reeled in. Years and years of being one of two shows in town (can't forget the Shuttle Program) spoiled 'em. Now they'll go back to doing what they do best - Aircraft and Military Hardware. ULA might get spurred off into its' own entity, but could finally start keeping the money it earns for once. Maybe Bezos can purchase it?

The only way I can see Starliner moving forward is if Boeing gets big bux to modify it with a large unpressurized Trunk, solar arrays (its battery life is only 2-3 days) etc. for use as a Deep Space Gateway taxi/cargo hauler. The rumors were it lost out on a CRS2 contract because it was volume and shape limited inside (acute sidewall angle, like an attic bedroom), had no Trunk outside for unpressurized cargo and was too expensive.

Edited by DocM
  • Like 1

Yeah. Everything including the design working against it, not to mention the just plain awful decisions made in development. "Apollo on steroids" meets "bureaucracy on wheels".

 

While I'm not really opposed to such an approach, the problems that I have with CST are the lack of any meaningful updates to the platform. The design is just about 15 years old -- I remember even in 2001~2002 hearing about Constellation and how new solutions could be applied to existing technologies, etc etc, the Ares launcher, and all that. 

 

The CST is Constellation, rebranded. That's just about it. Not much has changed unless something had to be changed.

 

And what gets me is that it's not even using "common sense" gear. Solar Panels -- surely they would have learned from Apollo? That would almost seem to be a NASA requirement, now. Modularity -- some kind of useful Service Module that can adapt to the mission? Seems like that would be required too; instead, they've got some Cygnus-derivative tech that still needs proving, and my understanding is that it does not provide much more life support than a week ...

 

CST is a mess, and Apollo was a superior product in most ways that mattered. All the CST has going for it is the larger size, relative to the Apollo CM, and a better computer. I'd venture to say that a 2017 model Apollo C+SM would be ounce-for-ounce as good as we'd need it to be until the Dragon 2 was ready.

 

One can only surmise, at this point.

2 hours ago, Unobscured Vision said:

Yeah. Everything including the design working against it, not to mention the just plain awful decisions made in development. 

 

Yup. Some terrible decisions, one being that godawul sidewall angle. OK for crew, stick their tootsies there, but death for cargo packs or the Shuttle style racks which are now the standard.

 

Quote

 

And what gets me is that it's not even using "common sense" gear. Solar Panels -- surely they would have learned from Apollo? 

>

There's been artwork of a Starliner with a Cygnus-based habitat complete with with its propulsion/power bus and arrays, but we'll see how serious that is. Maybe just attach a Cygnus bus to the bottom of the Cygnus service bay

 

cst100_cygnus_bkgtest2.jpg

 

Right now the only item in the options list is a small circular solar array mission kit which folds under the service bay. Not much output at that size. Bottom right.

 

cst100-pdf-details.thumb.jpg.05f06bde7ef13c9678a530989308b89d.jpg

 

  • Like 1

Those aren't even large enough to be useful, not to mention where they're located. I've seen that before and every time I do I keep asking "why". Keep the aft section sun-facing? Yeah, I bet the Retro Package, not to mention everything else in the SM, will appreciate being fried in continuous sunlight like that (radiators or not).

 

So the SM is gonna have thermal issues. It'll barely have a chance to get cooled off before it's right back to sunlight again during orbital ops. Too much of that and it'll start warping, which can throw off the decoupling when they go for reentry. Boomski if it hasn't done so already due to the thermals during orbital ops.

 

Oh, and their elaborate LAS is likely also their Retro Package. Which has been frying and cooling and frying and cooling (etc etc etc) ... nope, nothing could possibly go wrong there either.

 

CST is a bad day waiting for a launch window.

  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Bypassed Windows 11 shows surprising stability on ancient, completely unsupported hardware by Sayan Sen When Windows 11 was first released, one of the most complained-about issues with the new desktop Microsoft OS was its higher system requirements, which pushed many relatively modern and powerful processors and devices onto the officially unsupported list. Thankfully, they have not been updated again for the base OS, though systems require four times the memory and storage if they want to run AI-powered apps and features. As such, Windows 11 technically runs on 4GB of memory, and there is no imposed restriction on the generation of memory it supports. Speaking of memory, prices are extremely high nowadays for hardware, especially DDR5 and DDR4 kits due to the current silicon shortage, and there are also reports of it affecting DDR2 as well, and it might only be a matter of time before even DDR1 gets affected. Before that could happen, an enthusiast took an ancient DDR1-based system and decided to try out Windows 11 on it to see how well the modern OS would fare on such hardware. The system runs an outdated graphics card interface standard based on AGP, or Advanced Graphics Port, called AGP 3.0 or AGP8x. AGP was essentially succeeded by the modern PCI Express (PCIe) bus standard. The user behind the experiment is retro hardware enthusiast Omores, who built the system around an ASRock ConRoe865PE motherboard based on Intel's i865PE chipset from way back in 2003, around the time when AGP was still in fashion. What made this board special back in the day was its unusual support for newer Core 2 Duo and even Core 2 Quad processors while still retaining older DDR1 memory support and an AGP8X graphics slot, making it an ideal bridge or link between two vastly different generations. Powering the machine was Intel's Core 2 Quad Q6600 alongside 3GB of DDR1 RAM and an ATI Radeon HD 4650 AGP graphics card, one of the final and most capable GPUs released for the aging AGP interface. While installing Windows 11 itself was relatively easy by bypassing Microsoft's hardware checks, getting the graphics card fully functional proved to be some challenge. Microsoft had quietly dropped native AGP support after the earliest releases of Windows 10, meaning newer versions of Windows no longer include the necessary Graphics Address Remapping Table (GART) drivers required for proper AGP acceleration. Without them, AGP graphics cards typically boot up, though with limited functionality, and can often throw a Code 43 error in Device Manager. To work around the limitation, Omores extracted Intel's legacy AGP440 SYS driver from an early Windows 10 release and paired it with a modified INF file so Windows 11 would correctly recognize the chipset. Following this and combined with AMD's final 64-bit Catalyst AGP drivers from 2012, the Radeon HD 4650 was able to operate with full AGP 8X acceleration intact. The result was said to be surprisingly usable for hardware that is over two decades old. Hardware-accelerated H.264 video playback worked correctly and benefited apps like Firefox, while legacy applications and games ran without major graphical issues. The system also successfully completed the 3DMark 2001 benchmark, although performance naturally lagged behind what the same hardware achieves under Windows 7, which is significantly lighter than Windows 11. There was, however, one unavoidable limitation as Microsoft's Windows 11 version 24H2 introduces a mandatory SSE4.2 CPU instruction requirement that cannot be bypassed through installer modifications or registry tweaks. Since no AGP-era processor supports SSE4.2, Windows 11 version 23H2 effectively becomes the final release capable of running on such systems. Regardless, it is still a very cool feat and quite fascinating to see just how stable Windows 11 turned out to be on such unfamiliar hardware. Source: Omores (Patreon) via O_MORES (Reddit)
    • That will only really help other players that are also responsible for creating the problem.
    • Well, it's good to know that they have found a workaround to a problem that they helped create, I guess...
    • Meta is reusing old DDR4 RAM in its servers instead of buying new hardware by Ivan Jenic Image: Meta The global hardware shortage isn’t exactly news, as the entire world has been struggling with rising component prices for quite some time now. And while big companies certainly aren’t as affected as the average consumer, even they aren’t opposed to the idea of saving a few (million) bucks. Meta appears to have found a way to spend less on new hardware while also putting its outdated infrastructure to use, essentially killing two birds with one stone. The company has built a custom chip that lets it reuse memory from retired servers rather than buying new hardware. The chip is called Vistara and allows for connecting old DDR4 RAM from obsolete servers into new servers that rely on DDR5. The problem Vistara solves goes back to a basic mismatch in how long hardware lasts. Meta replaces its servers every three to five years, but the memory modules inside them are good for seven to ten. When a server gets decommissioned, perfectly usable DDR4 RAM goes with it. Meta is presenting the new method at today’s ISCA symposium, but The Register has got hold of a paper that explains how Vistara works. It's a custom ASIC that bridges DDR4 memory to newer processors via aCXL 2.0/1.1 interface over PCIe Gen5 x16. Meta pulls DDR4 sticks from old machines and installs them in dedicated units it calls MemServers, each of which pairs 768GB of DDR5 with 256GB of recovered DDR4. The operating system sees the DDR4 as an additional memory node and draws from it when the primary DDR5 is running low. Off-the-shelf CXL hardware couldn't do this, so Meta built its own. Existing interfaces bundle their own memory with the controller, which makes reusing old RAM sticks impossible. But Vistara separates the controller from the memory entirely, so Meta can plug in whatever DDR4 sticks it has on hand. Meta plans to deploy the new architecture in hyperscale infrastructure with millions of servers, which should mean that Meta’s AI datacenters will now be more efficient. The company is investing heavily in AI infrastructure, especially with its new AI model, Muse Spark, now widely available. All of this doesn't mean that Meta will exclusively rely on "recycled" RAM, but the company is still looking at considerable savings at scale.
    • Save up to 87% on ChatPlayground AI lifetime subscriptions by Steven Parker Today's highlighted deal comes via our Apps + Software section of the Neowin Deals store, where for only a limited time, you can save up to 87% on ChatPlayground AI: lifetime subscriptions. ChatPlayground AI puts the world’s top AI models in one powerful interface, letting you enter a single prompt and instantly compare outputs from multiple models to choose the perfect response for your needs. Boost productivity and creativity with access to the latest AI giants like GPT-4o, Claude Sonnet 4, Gemini 1.5 Flash, DeepSeek V3, and dozens more — all in one window. Whether you’re chatting, coding, generating images, or refining prompts, ChatPlayground AI equips you with advanced tools like prompt engineering, image/PDF chat, saved conversations, and AI image creation, plus priority support to keep your workflow seamless. Access the world’s best AI models Side-by-Side Comparisons: Enter one prompt & instantly view results from multiple AI models to find the best output for your needs 40+ AI Models: Includes GPT-4o, Claude Sonnet 4, Gemini 1.5 Flash, DeepSeek V3, Llama, Perplexity, and many more Multi-Function Platform: Access AI for chat, image generation & coding all within a single interface Web Browser Extension: Offers a Chrome extension to seamlessly integrate the platform into your browsing workflow Boost productivity with powerful features ChatPlayground Interface: Designed for seamless AI model comparison in one window Prompt Engineering: Refine & optimize your prompts for better, more accurate responses Chat with Images & PDFs: Upload visuals and documents to get context-aware answers Saved Chat History: Keep track of past conversations for reference & ongoing projects AI Image Generation: Create high-quality visuals powered by top AI image models Priority Customer Support: Get faster assistance whenever you need it What you'll get with the Unlimited Plan Includes unlimited messages/month Built for prompt engineers, startups, and teams who run experiments nonstop Includes priority access to new features and future models Good to know Length of access: lifetime Redemption deadline: redeem your code within 30 days of purchase Access options: Desktop Max number of device(s): Unlimited Available to both NEW & Existing users Updates included A lifetime subscription to ChatPlayground AI (Unlimited Plan) normally costs $619, but you can pick it up for just $79 for a limited time - that represents a saving of $530 (87% off). Click the link below for more details, always check terms and specifications before making a purchase. Get this ChatPlayground AI (Unlimited) for $79 (was $619) There are also two other discounted plans to choose from. Although priced in U.S. dollars, this deal is available for digital purchase worldwide. Support queries If you have queries or need support for any of the Neowin Deals, please use the contact form here. Neowin Deals are managed and sold by StackCommerce who represent Neowin on an affiliate basis. Why we post these deals We post these because we earn commission on each sale so as not to rely solely on advertising, which many of our readers block. It all helps toward paying staff reporters, servers and hosting costs. So for those that keep moaning and complaining, be thankful we're still online for you to even do that. Other ways to support Neowin Whitelist Neowin by not blocking our ads Create a free member account to see fewer ads Make a donation to support our day to day running costs Subscribe to Neowin - for $14 a year, or $28 a year for an ad-free experience Disclosure: Neowin benefits from revenue of each sale made through our branded deals site powered by StackCommerce.
  • Recent Achievements

    • Reacting Well
      NovaEdgeX earned a badge
      Reacting Well
    • Week One Done
      NovaEdgeX earned a badge
      Week One Done
    • One Year In
      BA the Curmudgeon earned a badge
      One Year In
    • Conversation Starter
      rosiecharles earned a badge
      Conversation Starter
    • First Post
      KMilenkoski1202 earned a badge
      First Post
  • Popular Contributors

    1. 1
      +primortal
      539
    2. 2
      +Edouard
      266
    3. 3
      PsYcHoKiLLa
      151
    4. 4
      Steven P.
      98
    5. 5
      macoman
      66
  • Tell a friend

    Love Neowin? Tell a friend!