cheap LEO at the best case needs about 10 YEARS OF HARDEST WORK & THIS WORK MUST BE STARTED RIGHT NOW. so far, there been only muddy drafts. pilot missions to the high orbits & beyond need adoption of human/animal body to the aggressive rads & magnetic fields.. khe-khe.. also it needs HEIS :rolleyes:

29 minutes ago, DocM said:

More from the situation in Kourou

 

 

so, soon we'll be able to see how space ports get demolished..

https://spaceflightnow.com/2017/03/23/launches-from-kourou-suspended-by-social-unrest/

 

Quote

 

Launches from Kourou temporarily suspended by social unrest

 

The launch an Ariane 5 rocket with Brazilian and Korean communications satellites that was set for this week has been postponed indefinitely after protesters blocked access to the French Guiana spaceport.

>

>

“The evolution of the situation does not permit the restart of operations for the Ariane 5 launch scheduled for today,” Arianespace said in a statement Thursday.

>

 

 

Yeah. That might be the best move. It'd take them 3~5 years to build a new Spaceport, but the political stability isn't something to be overlooked. And after this mess ... ?! Yeah. Time to move ops elsewhere.

Sounds like an agreement has been reached & signed, with the next launch in about 8 days. We'll see if it lasts.

 

http://spacenews.com/french-guiana-accord-sets-stage-for-arianespace-resume-launches/

 

WASHINGTON — An agreement between France and its restive South American territory French Guiana, home to Europe’s spaceport, has resolved a month-long dispute that had prevented any launch activity since mid-March.



Thanks to the “Accord de Guyane” agreement signed April 21 by French and French Guianese officials, launch service provider Arianespace says it will be able to soon resume launch activity and can make up for delays by using previously scheduled downtime over the next two months.
>

  • Like 1

/sigh.....

 

Report (PDF): link....

 

Ars....

 

Quote

NASA inspector says agency wasted $80 million on an inferior spacesuit

 

The space agency seems to be running out of usable suits for space station operations.
>
A new report released Wednesday by NASA Inspector General Paul Martin sharply criticizes this decision. "The continuation of this contract did not serve the best interests of the agencys spacesuit technology development efforts," the report states. In fact, the report found that NASA essentially squandered $80.6 million on the Oceaneering contract before it was finally ended last year.
>
>

 

/groan

 

So they pretty much did what NASA has done thus far. Taken a boatload of money and wiped their collective rear ends with it. AND THIS INCLUDES OLDSPACE INTERESTS.

 

And it's clear they haven't given two hoots about all of the work NewSpace, collectively, have done on spacesuits. Not even in the mix for consideration ...

 

Arrgh. People need to be held to account for this travesty. Like SLS's "big effing plan for Mars" that is completely and utterly unworkable in every critical point that could be lobbed in its' general direction. SLS itself has no use case for being built. Orion has no mission, at all. Starliner may never fly.

 

Gigantic waste of time, money, and resources that SpaceX could have actually done mind-blowing things with if they were given the opportunity.

 

/sigh

Article link | NasaSpaceFlight.com Website

Quote

Ariane 5 returns to action with SGDC and Koreasat-7 launch

May 4, 2017 by Chris Bergin

2017-05-02-212357-350x204.thumb.jpg.5b86bff8be685b775744791a31b3a543.jpgZ2AFSFSds-350x139.thumb.jpg.ae590d9d422350c3b79b5f04acf4f34d.jpg

(Images via Arianespace).

Arianespace returned to action on Thursday with the long-awaited launch of its Ariane 5 rocket – following a delay caused by a local “social movement”. Ariane 5 lofted the SGDC and Koreasat-7 satellites from the European Spaceport in Kourou, deep into the launch window at 21:50 GMT. A late fuel load and a telemetry based issue caused the launch to move later into the evening.

 

Good stuff. :yes: 

And the coverage following in about four hours from now, beginning at 11:27UTC (4:27 AM EST), is ISRO's next launch of the GSRV Mark 2 from India's Satish Dhawan Space Centre, Sriharikota. They'll be launching GSAT-9 for South Asia Satellite (a group of several Asian nations cooperatively) on a GTO trajectory. This will mark the fourth consecutive flight without a mishap if successful, proving the Mark 2 platform reliable and the facility (and personnel) capable of an increased launch cadence.

 

 

[EDIT] Scratch that. Not "India Time", or "my time in my head". Not "This morning". Wondered why the feed kept saying 3 hours. Bleh. I really need to watch doing that. I saw 4:27 ... ugh. Tunnel vision. Never mind. My fault entirely. Sorry all. :no: 

Edited by Unobscured Vision
  • 2 weeks later...
Quote

 

NASA Just Fast-Tracked Its Mission to Explore a $10,000 Quadrillion Metal Asteroid

 

It might have just pushed back its manned mission to Mars, but NASA just fast-tracked a planned journey to 16 Psyche - an asteroid made almost entirely of nickel-iron metal.

 

Estimated to contain $10,000 quadrillion in iron alone, if we could somehow mine Psyche's minerals and bring them back to Earth, it would collapse our comparatively puny global economy of $78 trillion many times over. Fortunately for the economic stability of our planet, NASA plans on looking but not extracting.

 

///

 

Named after Psyche, a human figure in Greek mythology who earned immortality, 16 Psyche is one of the most massive asteroids that have been discovered in the asteroid belt so far - a dusty disc located between the orbits of Mars and Jupiter.

 

Measuring 240 km in diameter, it's nowhere near as large as some of the other known asteroids in the belt - the largest, Ceres, has a diameter of 945 km - but 16 Psyche's claim to fame is it is by far the largest exposed iron metal body in the asteroid belt.

 

If NASA is successful in its mission, Psyche will give humans their first ever chance of exploring a world made of iron - not rock or ice.

 

The space agency had originally announced that it would be launching its 16 Psyche Discovery Mission in 2023, but has just brought that forward to the summer of 2022. 

 

/snip

 

 

Full article at Science Alert

  • Like 3

They lost 450+ last year to layoffs, and insiders are saying at least another 1,000 this year. 

 

Delta IV Medium's last flight is next year (3 left) and Delta IV Heavy goes away in 2023 (7 left). With work on launches running 4-5 years, SpaceX and Blue Origin fielding modern, reusable launchers and innovative new startups like Rocket Labs just winding up, their reality for the early 2020's looks grim. 

 

http://www.janes.com/article/70229/united-launch-alliance-joint-venture-agreement-expires

 

Quote

United Launch Alliance joint-venture agreement expires

 

Key Points

* ULA's 2005 joint-venture agreement expires

* Could affect business between the Pentagon and its two largest contractors

The 2005 joint-venture master agreement between Boeing and Lockheed Martin that created the United Launch Alliance (ULA) expired this month, according to a key US Air Force (USAF) official.

David Hardy, associate deputy under secretary of the Air Force for space, and the deputy director, principal Defence Department space advisor staff, said on 9 May that he was the compliance officer for the agreement and that the Pentagon no longer has oversight duties now that the agreement has expired. He told Jane's these oversight duties included compliance requirements to what communications and relationships the two parent companies, Lockheed Martin and Boeing, could have with ULA, their joint venture.

Neither ULA nor the USAF, the US government's space launch provider, returned requests for comment about whether the expiration of the agreement would affect business between the USAF and ULA. Since its founding in 2005, ULA has provided the vast majority of USAF launches.
>

Edited by DocM

The parents companies are doing more than fine. Big, fat Mil/Gov contracts that nobody else can cover -- LockMart and Boeing both. Boeing builds Satellites, Electronic gear, Commercial and Military jets. LockMart builds Military jets and most Naval vessels & equipment. Weaponry too. They've got their hands in everything. ULA is a "side project" to them, in the grand scheme of things. A way to make more money, and really it's a good way to make lots of it. The Shuttles weren't flying enough, and were too expensive, to use a lot. So here comes a joint venture to build and fly rockets. See a need, fill that need.

 

Now things are different. NewSpace is here, in a BIG way. ULA can't get away with charging exorbitant prices anymore, and ULA wasn't structured to operate in that environment. Tory Bruno, to his credit, has attempted to modify ULA's business practices (and prices) to compensate -- but ULA is pretty much bleeding money and isn't profitable now. They've cut the company's expenses almost as far as they'll go; and getting a new, modern, easily and quickly-built rocket flying that doesn't cost the company an arm and a leg to build is not going to come easy.

 

There will be a lot of infighting inside the company too -- those who insist on sticking to the old ways and those who need to move ahead with the new (and they'll be correct). I think the "old guard" will win out, and it'll be to ULA's detriment. Sure, they'll move to CH4/LOX, because they're committed to the BE-4 engine now .. but ACES is just dumb. Using four engines that lack the performance of a single modern one is a bad move, even if it's to save money.

 

Yeah. ULA is going to be a victim of its' own shortsightedness.

The worst part of ACES is that damned 6 cylinder piston engine. Sure it can run on boil-off props, generating power and heat while pumping fluids, but so can a solid oxide fuel cell + electric pump(s) but with 97% fewer parts. Hello?!

 

The problem is ACES has been in development for so long they're mentally locked in to their previous work.

  • Like 1

Yep. Like I'm thinking .. "the old guard is gonna cost 'em". Another example is that, exactly. The first rule of Space is "KISS". Less = more, for a good reason. Less stuff that can fail = keeps more going, longer.

 

Short-term gain, long-term liability. That's what they're best known for at ULA/LockMart/Boeing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Posts

    • The proportion (or number of iterations) has nothing to with this aspect of Copyright I am describing. In short, it doesn't matter how many times the manager tells you to change something or how. Your work product is always YOURS until and unless you then assign that to the person representing the client/company, usually for financial compensation -- either in salary or as a subcontract work for hire payment. if iterations determined copyright, then businesses would have learned to just keep making changes until they could claim they owned the copyright, without having to compensate the artist for their work. And that would be BAD. The only place where the amount of changes does have a role is in how much does a human modify a previous public domain work (from any source) before it is considered fair use or their own work, etc. For example, if a human makes substantial changes to a public domain (re: AI, by definition) work, then they can then claim that derivative work as their own...but NEVER the original version, of course. That's why anyone can make a movie about Dracula, for example, as long as it is based on the public domain novel, but not if they take new ideas from copyrighted movies made afterwards. As one of the people who personally advised the US Copyright Office on their recent ruling on these very issues, be assured that I specifically used the terminology precisely -- though I made it simple enough for laymen to understand it. If I made this confusing by doing so, I apologize. But, to be clear regarding your assumption that I would agree to your second statement that I quoted above -- the answer is NO. If AI does the work, no matter how much "direction" you give it, it cannot be copyrighted. All AI generated content is in the Public Domain and therefore the copyright cannot be assigned to ANYONE, even you -- until and unless substantial modifications are made to it BY A HUMAN BEING (yourself or a contracted artist/writer/etc.) and then that copyright on the derivative work is legally (in writing) transferred to you. This is a critical distinction. And it is important that people, especially AI sloppers, understand this. For example, YouTube is not paying AI slop generators for the copyright, etc. of their AI slop. What YouTube is doing is sharing AD REVENUE for permission to publish your AI slop. Copyright/ownership/rights never come into it. Importantly, that means that anyone can copy any AI slopware on YouTube, etc. and rehost it anywhere they want, even back on YouTube, and there is nothing legal that YouTube can do about it with regards to copyright protections, ownership, DMCA, etc. Anyone is legally free to use any AI slopware in any way they want. When this ruling was pending, I warned Disney legal of all of this before they did their OpenAI deal -- that it would literally dilute their entire IP portfolio forever. They ignored that warning for the PR and stock bump. But that is why, when the ruling came down last year, Disney quickly extricated themselves from that OpenAI deal, even eating the initial upfront fees -- followed closely by OpenAI ending their entire AI video generating business model. They adjusted their PR release dates to make this less obvious to shareholders, of course. Phew. I hope that this clears up the key distinctions for you and anyone reading. If you have any additional questions or even hypotheticals about AI and Copyright, please feel free to ask.
    • Each of the devices displayed on this page now has a little volume meter next to it to show if there is audio actively playing. About time.
    • Owing to the nature of Windows feature enablement updates, it was distributed over Windows Update services as a complete system upgrade rather than as an ordinary cumulative update
    • Microsoft confirms Windows 11 26H2, urges IT admins to prepare for release by Usama Jawad Windows 11 typically follows an annual update cycle, but Microsoft recently broke that tradition a bit by releasing a "26H1" version in the first half of this year as a "scoped" build for select new silicon PCs only. This version was not available for customers using 24H2 and 25H2 builds, as Microsoft is busy preparing version 26H2 for them, confirmed officially for the first time. In a Windows IT Pro blog, Microsoft has urged IT admins to prepare for the upcoming release of Windows 11 version 26H2. The company has confirmed that this will be a small enablement package (eKB) that will simply light up certain disabled features that are already present in the operating system's code base. This means that the "refined" Windows update and deployment experience will be simpler and quicker, with minimal disruptions, as the feature update will simply toggle a few flags rather than performing a complete replacement. Microsoft has explained that this is all possible because the standard Windows 11 releases share the same servicing branch and hence, the same source code. However, this also means that Windows 11 26H1 users won't be able to upgrade to 26H2 as that is a different branch, but this is something we have known for a while now. Similar to previous annual feature updates, Windows 11 26H2 will offer the following support cycles: 24 months of support for Home, Pro, Pro EDU, and Pro for Workstations editions 36 months of support for Enterprise, Education, IoT Enterprise, and Enterprise Multi-session editions Microsoft has not confirmed a concrete release date for Windows 11 26H2, but noted that it is "coming soon". If we go by the ongoing release cadence, we can expect it to begin rolling out in early October 2026. As such, IT admins have been encouraged to begin validating Windows Insider releases in the Experimental Channel, plan rollout rings, and strategize the utilization of their existing deployment tools.
  • Recent Achievements

    • Collaborator
      ryansurfer98 went up a rank
      Collaborator
    • Week One Done
      Eurosoft10 earned a badge
      Week One Done
    • One Month Later
      Eurosoft10 earned a badge
      One Month Later
    • One Year In
      Skeet Campbell earned a badge
      One Year In
    • One Month Later
      Sharbel earned a badge
      One Month Later
  • Popular Contributors

    1. 1
      +primortal
      576
    2. 2
      +Edouard
      188
    3. 3
      Michael Scrip
      79
    4. 4
      PsYcHoKiLLa
      78
    5. 5
      neufuse
      72
  • Tell a friend

    Love Neowin? Tell a friend!