Recommended Posts

NSF report, supplemented

 

https://www.nasaspaceflight.com/2016/10/spacex-prepares-upcoming-falcon-9-amos-6/

 

Satellite bus: Space Systems/Loral SSL-1300
Band: Ku
Mass: ???? (up to 6,700 kg)
Position: 45°
Coverage: Brazil
Estimated life: 15 years

 

Launch pad: LC-39A
Launch date,: TBD
Launch T-0: 2330 Eastern (estimated)

 

Eutelsat-65-West-A-Arianespace.jpg

 

  • Like 3
Link to comment
https://www.neowin.net/forum/topic/1312790-falcon-9-echostar-23-mission-thread/
Share on other sites

  • 3 weeks later...
  • 4 weeks later...

CRS-10 can't fly until Jan 22 as it's berthing at Harmony nadir, which until Jan 20 is housing HTV-6. February 2 another Progress arrives and they'll be busy with that, so mid February maybe. 

 

That said, there's plenty to do from Vandenberg. It looks like they picked up an 8th Iridium NEXT launch since Russia killed the Dnepr launcher which was to fly that flock.

  • 3 weeks later...

Hopefully we will hear about fit checks this week at 39A...

 

The last NET that I have seen for this launch, is the 26th of January...which I assume will change due to the setup for first launch from 39A and whatever gremlins appear.....

 

I require another quick launch to "get my  fix"....:D

  • Like 2

There still could be gremlins, a lot of work has been done there. And remember they're using a pad below the "classic 39-A", and there's been a hell of a lot of retro fitting to make it work. There's technically two pads there now, a smaller one for Falcon 9 and FH and then the big one a couple hundred feet or so away up on the "Main Pad" (where the Shuttles and Apollo/Saturn would launch from). A lot to check out and declare fit for purpose, and the chances of launching on the penciled-in date aren't completely certain yet. ITS will use the big pad, when it's ready to be used and when Dragon 2 is ready to fly.

Okay, this picture gives the layout better. The new digs are right on the old pad. Heh. I stand corrected. I thought there were two pads, one alongside the old 39-A.

 

[EDIT] Holy crap they're close to the pad. Are they too close for ITS to launch from there? :|

  • Like 1

Another point,

 

Placing an x*1 larger rocket at the pad does not mean a proportional increase in overpressure at the target in question.

 

ISTM,

 

The propogation of a detonation is spherical, which spreads the energy out. Point or spherical charge detonation propogates by the cube root of the distance, which also applies to linear or cylindrical charges at a long distance (which reduces their angular size to more point-like.) Closer to a linear/cylindrical charge you'd apply the square root of the distance.

 

The propogated energy for a rocket will be less because it's a conflagration, not a detonation. The pressure wave has a longer rise time and duration, which minimizes the effect. The only detonation involved would be a linear shaped charge used as a Flight Termination System - to open the tanks.

 

Net: a large rocket like ITS may release the energy of a 3-5 kiloton tactical nuke, but at 3-4 miles the pressure wave may only break windows and rattle nerves.

Edited by DocM
  • Like 1

Media Contact:
John Taylor
[email protected]
310.363.6703

HAWTHORNE, Calif. – Jan. 19, 2017. Media accreditation is now open for SpaceX’s first launch from Launch Complex 39A (LC-39A) at Kennedy Space Center in Florida. The launch is targeted for no earlier than Jan. 30.  Pre-launch media activities are currently targeted for no earlier than Jan. 29.

SpaceX’s Falcon 9 rocket will deliver a commercial satellite to a Geostationary Transfer Orbit (GTO).

Members of the media who are U.S. citizens or Permanent Resident Aliens (green card holders) and interested in covering the launch must fill out the media accreditation request form by 5:00 p.m. EST, on Monday, Jan. 23.

Requesting accreditation is not required of media who hold current annual press credentials issued by Kennedy Space Center, but it is appreciated for planning purposes.

For launches from LC-39A, Kennedy Space Center decides which media are credentialed to cover launches, not SpaceX. Please keep in mind, simply making the request in a timely fashion does not guarantee the request will be granted. Please be sure to provide all the information included on the SpaceX form. SpaceX typically obtains confirmation that these requests are approved about 48 hours prior to launch.

More details on the mission, the customer and pre-launch activities will be made available at a later date closer to launch.

  • Like 1

George ‏@gdoehne
@elonmusk Next SpaceX flight (Echostar) has v heavy GTO payload (5500kg)
Will Falcon fly expendable, or try low-margin droneship landing?

Elon Musk ‏@elonmusk
@gdoehne Expendable. Future flights will go on Falcon Heavy or the upgraded Falcon 9.

George ‏@gdoehne
@elonmusk When you say upgraded Falcon 9 are you referring to the Block 5 you mentioned here? Timing fits.

Elon Musk ‏@elonmusk
Yes. Block 5 is the final upgrade of the Falcon architecture. Significantly improves performance & ease of reusability. Flies end of year.

 

Once Block 5 R&D is done ITS becomes the focus. Production in the Seattle area, Hawthorne, and somewhere(s) along the Gulf of Mexico. 

 

  • Like 2
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • OK, back to normal now! Ozzy Osbourne - Flying High Again (Official Music Video)  
    • The actual download size is ~130–180 MB, not 100 MB.
    • Big change of pace for me! Gunnar & the Grizzly Boys - Standard American (Official)  
    • draw.io Desktop 30.2.4 by Razvan Serea draw.io desktop is a downloadable security-first diagramming application that runs on Windows, MacOS and Linux. Creating diagrams in the desktop app doesn’t need an internet connection. This is useful when you are disconnected or when you must create diagrams in a highly secure environment, where data protection is of the utmost importance. When you use the draw.io desktop app, your diagrams will be stored on your local device. Because this is a stand-alone application, also designed to run offline, there are no interfaces to cloud storage platforms available. Of course, you can still store your diagrams in folders that are synchronised to your cloud storage if you wish. Easy-to-use diagram editor The draw.io apps work just like the office and drawing tools you are used to using. Drag and drop shapes from the shape libraries and drag to draw connectors between them. Drag connectors to add waypoints and set a precise shape and position, or let them reroute automatically. Double click and start typing to add a label to anything. Create tables and swimlane flows with a familiar tool. Style shapes and connectors with customisable palettes, sketch options, fonts and text formatting tools. Search for shapes, including in open-source icon libraries. Use our vast libraries of shapes and templates, organised into logical categories, to create a range of diagrams and infographics. Generate diagrams from text descriptions using our smart templates. Diagram faster with keyboard shortcuts. draw.io Desktop 30.2.4 changelog: Uses electron 42.4.1 Updates to draw.io core 30.2.4. Download: draw.io 64-bit | Standalone ~100.0 MB (Open Source) Download: draw.io 32-bit | ARM64 | ARM64 Standalone Links: draw.io Home Page | Project page @GitHub | Screenshot Get alerted to all of our Software updates on Twitter at @NeowinSoftware
  • Recent Achievements

    • Week One Done
      Eurosoft10 earned a badge
      Week One Done
    • One Month Later
      Eurosoft10 earned a badge
      One Month Later
    • One Year In
      Skeet Campbell earned a badge
      One Year In
    • One Month Later
      Sharbel earned a badge
      One Month Later
    • First Post
      BizSAR earned a badge
      First Post
  • Popular Contributors

    1. 1
      +primortal
      590
    2. 2
      +Edouard
      191
    3. 3
      PsYcHoKiLLa
      81
    4. 4
      Michael Scrip
      77
    5. 5
      neufuse
      74
  • Tell a friend

    Love Neowin? Tell a friend!