Microsoft Delivers New Vista Beta Build (5472)


Recommended Posts

Microsoft on Monday released Windows Vista Beta Build 5472 to technical beta testers, TAP customers and MSDN subscribers. The interim update is intended to give testers a more recent build, and encourage application and device driver developers to accelerate deployment on Vista.

Quality and performance enhancements are the primary changes in 5472, along with further tweaks to User Account Control. The new build is the second to follow Beta 2, and will not be released to Customer Preview Program participants. Microsoft expects to deliver the next public release of Windows Vista, Release Candidate 1, later this quarter.

Source

post-51806-1153158504_thumb.jpg

Looks good, but https://www.neowin.net/forum/index.php?show...#entry587697853

Keep us informed about how well it handles

oh great, im pretty sure you are allowed two threads about new vista buils. one in BPN so peoople can see the general advancement of vista. and the one in beta discussion is about the actually technical cheese in this build and for support.

Man it is a good thing i took my macbook to work today :) i'm downloading this build right now :( connect is kinda slow but i should be testing it on the macbook in less than 2hours :)

Let us know how the new build runs and such on the MacBook, I am planning to get a macbook soon... what are your specs?

Let us know how the new build runs and such on the MacBook, I am planning to get a macbook soon... what are your specs?

White 2.0ghz at the moment with 512, 100gb hdd, i ordered 2x512(ddr pc5400 OZ ram) last night for it should be here in this week, hopefully that helps it run faster, and i should be able to enable glass once i get it. :)

ps 76% done, less than 20mins left and i should be burning and installing

White 2.0ghz at the moment with 512, 100gb hdd, i ordered 2x512(ddr pc5400 OZ ram) last night for it should be here in this week, hopefully that helps it run faster, and i should be able to enable glass once i get it. :)

ps 76% done, less than 20mins left and i should be burning and installing

Awesome! Will you let us[me] :p know how it runs with the current specs, and how/if the RAM upgrade increases performance?

This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Posts

    • Qualcomm takes on NVIDIA with new Dragonfly CPU and AI chips by Pradeep Viswanathan Microsoft, Google, Amazon, AMD, Meta, Apple, OpenAI, and several others have been developing their own chips for AI infrastructure. However, NVIDIA still remains the dominant player in the market. Today, Qualcomm announced a major expansion of its data center infrastructure portfolio to better compete with NVIDIA. The new lineup includes the Qualcomm Dragonfly C1000 CPU, Qualcomm High Bandwidth Compute technology, the Dragonfly AI300 inference accelerator, new connectivity products, and custom silicon solutions. Qualcomm claims that this new lineup improves performance per watt, token throughput, and total cost of ownership for AI data centers. The Dragonfly C1000 is a new data center CPU built with Qualcomm’s custom Oryon cores. This chip will feature more than 250 cores, frequencies above 5GHz, and a chiplet-based design. Qualcomm claims that this new C1000 can deliver more than 2x better performance per watt compared to existing server CPU offerings based on specifications. The Dragonfly C1000 will support PCIe Gen 7 with more than 2TB/s of connectivity, along with CXL, advanced RAS features, and both air and liquid cooling. Qualcomm expects the Dragonfly C1000 to be commercially available in 2028. Additionally, Qualcomm and Meta announced a multi-year, multi-generation agreement under which Qualcomm will supply Dragonfly C1000 data center CPUs for Meta’s next-generation server fleet. Qualcomm also announced High Bandwidth Compute, a new near-memory computing architecture designed to address AI’s memory bandwidth bottleneck. HBC Gen 1 will debut with the Dragonfly AI250, which is expected to sample in mid-2027. The AI250 will deliver 133TB/s per card, an 18x increase in effective memory bandwidth compared to the AI200 with LPDDR5X. The new Dragonfly AI300 with HBC Gen 2 is a rack-level AI inference platform from Qualcomm. Qualcomm claims that the AI300 can deliver 4x to 8x better performance per watt compared to existing GPU-based architectures based on memory bandwidth per watt per card. The Dragonfly AI300 is expected to be available in 2028.
    • IBM reveals sub-1nm chip technology, production expected in another 5 years by Pradeep Viswanathan TSMC is now leading the chip manufacturing industry with its 2nm-class process node called N2. Samsung Foundry also has a 2nm-class process node called SF2. TSMC says N2 entered volume production in Q4 2025. Samsung says SF2 started mass production in 2025. Today, IBM announced the world’s first sub-1-nanometer chip technology, marking another major semiconductor research milestone. The new technology is based on a 0.7nm, or 7-angstrom, node and uses a new transistor architecture called “nanostack.” The new design vertically stacks and staggers nanosheet-based transistors so that more components can fit into the same chip area while also improving performance and power efficiency. IBM claims that this new sub-1nm chip can pack nearly 100 billion transistors onto a chip the size of a fingernail. This offers almost twice the density, up to 50 percent higher performance, or 70 percent better energy efficiency when compared to IBM's 2nm node design announced back in 2021. Also, IBM mentioned that this new architecture can deliver 40 percent SRAM scaling. It is important to consider that this announcement from IBM is a research milestone rather than a near-term process node launch. Back in 2021, IBM unveiled the world’s first 2nm chip design, claiming 50 billion transistors on a fingernail-sized chip and major performance and efficiency gains. Five years later, IBM’s 2nm technology has still not entered mainstream commercial production. That is because IBM is no longer a major commercial chip manufacturer. It sold its chip manufacturing business to GlobalFoundries years ago and has since then focused only on semiconductor research, IP development, and partnerships. To productize its 2-nm chip technology, IBM partnered with Japan’s Rapidus, but it has not resulted in anything shipping at scale. IBM says that its new sub-1nm technology can reach production as early as within the next five years. If that happens, it will likely depend on manufacturing partners, advanced EUV tooling, and years of yield improvements.
  • Recent Achievements

    • Week One Done
      Meta Plast earned a badge
      Week One Done
    • First Post
      kinowa earned a badge
      First Post
    • Rookie
      krychek57 went up a rank
      Rookie
    • Grand Master
      Jaybonaut went up a rank
      Grand Master
    • One Year In
      Philsl earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      454
    2. 2
      +Edouard
      170
    3. 3
      PsYcHoKiLLa
      135
    4. 4
      Michael Scrip
      78
    5. 5
      Xenon
      77
  • Tell a friend

    Love Neowin? Tell a friend!