Undecided on how I will upgrade from Windows 7 to Windows 8


Recommended Posts

Good moring everyone.

Lately I have been thinking on what method I will choose when it comes time to upgrade my Windows 7 machine to Windows 8 on October 26. I am curious to know what you all have decided for yourself. Will you be doing the $39.99 online upgrade or will you buy the $69.99 retail box somewhere and do it that way? Please if you would, explain why you chose the option you did.

Normally when I can afford to do so I prefer buying the retail copy so that I have a physical copy of the item. I don't know how the online update will actually work. I haven't found a link anywhere describing how it will be done. I did read a C|Net article the other day that said,

"You will be able to create your own bootable USB or .ISO file, which can be burned onto a DVD for upgrade and backup purposes. If you prefer, you also have the option of purchasing a backup DVD for $15 plus shipping and handling," Microsoft said.

But I haven't been able to find any such statement in an actual Microsoft post or article anywhere to back that up. It also seems apparent that Microsoft is still issuing updates to Windows 8 and I think that's great but I now wonder if the retail box to be sold on October 26 will have these last minute updates. It doesn't seem likely given the fact they need to fill and ship the orders out to the retail establishments ahead of October 26 release date so I am not sure that they will have the very latest updates. I think the one from the other day was 174mb or something like that. I sure would prefer having that 174mb update on retail disk so I don't have to download that.

Anyhow, I'd appreciate knowing how you all are going to do your update and would appreciate a brief explaination as to why you chose that method.

Thank you very much for your time and replies. Have a good weekend too. :)

Online is fine, you download an iso which can either be loaded onto a usb stick for installing from or a dvd.

All you need really is your serial key and you can get a legit download of the iso for your version without issue using md5 checks.

You own the right to run the software on that pc so long as you have that right installing it from a burned iso will be fine.

Normally you see a "burn a disc" option at the end of the ordering process when it goes live. Its usually cheaper because you dont get a manual or any extra rights like boosted support which I *think* you get with retail.

There is a new procedure where you can do a clean install from upgrade but I am not sure what the procedure is, normally it will have to be ran from Windows 7 as an upgrade (not clean)

I'll wait and see if anyone else does what I want to do upgrade wise. In my case I want to install Windows 8 on my new SSD not on the same old HDD Windows 7 is on. I know the upgrade version lets you do a clean install but I figure it's to the same drive Windows 7 is on unless it does infact let you pick where you want to install it then all is well in my case and I'll just d/l it and make a bootable USB for the install.

If I can't do this then I'll have to wait and get one of the full OEM/System builder copies but those cost more.

I'll wait and see if anyone else does what I want to do upgrade wise. In my case I want to install Windows 8 on my new SSD not on the same old HDD Windows 7 is on. I know the upgrade version lets you do a clean install but I figure it's to the same drive Windows 7 is on unless it does infact let you pick where you want to install it then all is well in my case and I'll just d/l it and make a bootable USB for the install.

If I can't do this then I'll have to wait and get one of the full OEM/System builder copies but those cost more.

I think the upgrade version is concerned with the machine itself , not the disc .

I think the upgrade version is concerned with the machine itself , not the disc .

I hope that's the case, but I'll wait to be 100% sure first.

This topic is now closed to further replies.
  • Posts

    • Qualcomm takes on NVIDIA with new Dragonfly CPU and AI chips by Pradeep Viswanathan Microsoft, Google, Amazon, AMD, Meta, Apple, OpenAI, and several others have been developing their own chips for AI infrastructure. However, NVIDIA still remains the dominant player in the market. Today, Qualcomm announced a major expansion of its data center infrastructure portfolio to better compete with NVIDIA. The new lineup includes the Qualcomm Dragonfly C1000 CPU, Qualcomm High Bandwidth Compute technology, the Dragonfly AI300 inference accelerator, new connectivity products, and custom silicon solutions. Qualcomm claims that this new lineup improves performance per watt, token throughput, and total cost of ownership for AI data centers. The Dragonfly C1000 is a new data center CPU built with Qualcomm’s custom Oryon cores. This chip will feature more than 250 cores, frequencies above 5GHz, and a chiplet-based design. Qualcomm claims that this new C1000 can deliver more than 2x better performance per watt compared to existing server CPU offerings based on specifications. The Dragonfly C1000 will support PCIe Gen 7 with more than 2TB/s of connectivity, along with CXL, advanced RAS features, and both air and liquid cooling. Qualcomm expects the Dragonfly C1000 to be commercially available in 2028. Additionally, Qualcomm and Meta announced a multi-year, multi-generation agreement under which Qualcomm will supply Dragonfly C1000 data center CPUs for Meta’s next-generation server fleet. Qualcomm also announced High Bandwidth Compute, a new near-memory computing architecture designed to address AI’s memory bandwidth bottleneck. HBC Gen 1 will debut with the Dragonfly AI250, which is expected to sample in mid-2027. The AI250 will deliver 133TB/s per card, an 18x increase in effective memory bandwidth compared to the AI200 with LPDDR5X. The new Dragonfly AI300 with HBC Gen 2 is a rack-level AI inference platform from Qualcomm. Qualcomm claims that the AI300 can deliver 4x to 8x better performance per watt compared to existing GPU-based architectures based on memory bandwidth per watt per card. The Dragonfly AI300 is expected to be available in 2028.
    • IBM reveals sub-1nm chip technology, production expected in another 5 years by Pradeep Viswanathan TSMC is now leading the chip manufacturing industry with its 2nm-class process node called N2. Samsung Foundry also has a 2nm-class process node called SF2. TSMC says N2 entered volume production in Q4 2025. Samsung says SF2 started mass production in 2025. Today, IBM announced the world’s first sub-1-nanometer chip technology, marking another major semiconductor research milestone. The new technology is based on a 0.7nm, or 7-angstrom, node and uses a new transistor architecture called “nanostack.” The new design vertically stacks and staggers nanosheet-based transistors so that more components can fit into the same chip area while also improving performance and power efficiency. IBM claims that this new sub-1nm chip can pack nearly 100 billion transistors onto a chip the size of a fingernail. This offers almost twice the density, up to 50 percent higher performance, or 70 percent better energy efficiency when compared to IBM's 2nm node design announced back in 2021. Also, IBM mentioned that this new architecture can deliver 40 percent SRAM scaling. It is important to consider that this announcement from IBM is a research milestone rather than a near-term process node launch. Back in 2021, IBM unveiled the world’s first 2nm chip design, claiming 50 billion transistors on a fingernail-sized chip and major performance and efficiency gains. Five years later, IBM’s 2nm technology has still not entered mainstream commercial production. That is because IBM is no longer a major commercial chip manufacturer. It sold its chip manufacturing business to GlobalFoundries years ago and has since then focused only on semiconductor research, IP development, and partnerships. To productize its 2-nm chip technology, IBM partnered with Japan’s Rapidus, but it has not resulted in anything shipping at scale. IBM says that its new sub-1nm technology can reach production as early as within the next five years. If that happens, it will likely depend on manufacturing partners, advanced EUV tooling, and years of yield improvements.
  • Recent Achievements

    • Week One Done
      Meta Plast earned a badge
      Week One Done
    • First Post
      kinowa earned a badge
      First Post
    • Rookie
      krychek57 went up a rank
      Rookie
    • Grand Master
      Jaybonaut went up a rank
      Grand Master
    • One Year In
      Philsl earned a badge
      One Year In
  • Popular Contributors

    1. 1
      +primortal
      455
    2. 2
      +Edouard
      170
    3. 3
      PsYcHoKiLLa
      135
    4. 4
      Michael Scrip
      78
    5. 5
      Xenon
      77
  • Tell a friend

    Love Neowin? Tell a friend!