Recommended Posts

Nawwww....The Imperial March from Star Wars!!

 

Florida Today....

 

Quote


SpaceX signs lease with Port Canaveral for booster refurbishing

SpaceX has signed a five-year lease for a warehouse and office facility at Port Canaveral, where it plans to process, refurbish and store rocket boosters for future reuse.

The commercial space company has occupied the 53,360-square-foot former SpaceHab building on the north side of the port since August, under a month-to-month lease, and has been renovating the facility, located at 620 Magellan Road.

Now, with the signed lease agreement, "they can forge ahead" with their plans, Port Canaveral Chief Executive Officer John Murray said.

The company also plans to build an adjacent 44,000-square-foot hangar on the 4-acre parcel.

Canaveral Port Authority commissioners are scheduled to vote Wednesday on the lease, which will take effect April 1.

Under terms of the lease, SpaceX will pay monthly rent to the port of $35,181 in Year 1, increasing to $50,639 a month by Year 5.

"It's a unique opportunity for our port to participate in the space industry," Murray said. "It's just great to be part of it. It's great to be in a strategic location that will be part of making history" for the space program.

SpaceX  formally known as Space Exploration Technologies Corp.  will be responsible for paying for and completing improvements to the complex. The port agreed to partially reimburse SpaceX for improvements, up to a maximum of $280,000 by deducting up to $10,000 a month in rent for the first 28 months of the lease.

SpaceX will have use of a nearby roadway for transporting SpaceX rocket boosters from a cargo dock to its facility, and will get exclusive use of the road for up to six hours while the rocket booster transport is taking place.

Murray said the port also has had "numerous inquiries from numerous companies" in the space industry interested in leasing at the port.

The agreement between SpaceX and the port includes two options to extend the lease by five years each time.

 

SpaceX_refurb_port_canaveral.thumb.jpg.ae4e42321a7f71e8e3a51ab1dd401a68.jpg

 

  • Like 2

That infographic really illustrates how crappy (expletive/descriptive removed) the current-gen ULA rockets are, and how unimaginative their ambitions down the road are. The only one worth anything will be Vulcan Block-2/ACES, and it'll likely be at 3x the cost/launch of a Falcon Heavy which is more capable by a factor of almost 2 -- before the switchover to the Raptor S2.

 

And the infographic hasn't taken into account a possible "mini-ITS" which is still a possibility (Saturn-V levels of capability -- 105~120T to LEO) or even ITS itself which could be used as a gargantuan SHLV, or even SLS for that matter. Vulcan/Centaur won't even FLY until 2021 at the earliest unless something changes at ULA to speed up the timetable. That line isn't even cutting metal yet, and the BE-4 won't start testing for a few weeks.

 

Nor does the infographic show New Glenn or anything else from Blue Origin; but there's been no stated timetable for Blue's next iteration.

 

Also absent is Orbital's name in the lineup anywhere ... but I don't think we're surprised at all by that little development, are we?

 

SpaceX will already be cutting metal on ITS by 2021 and doing Raptor testing for any sign of various anomalies (acoustic, etc) when adding groups of them together in the arrangements needed for ITS' first stage. :yes: ULA will be way, WAY behind the curve by then if their ambitions are merely on Vulcan/ACES .... and we don't exactly see Space X sitting on their laurels with the Falcon Heavy platform, do we? Expect improvements to that one over time. The best ULA can hope for is Second Place at this point. Once Falcon Heavy debuts, they're hosed. SLS is going to cost waaaaay too much to be allowed to fly often -- much to the annoyance of Shelby and the other OldSpace proponents who seem to think it was a good idea to keep funding it.

Yup. Falcon 9 alone is giving ULA a migrane, and Falcon Heavy will be murder once EELV and NASA certified.

 

Add New Glenn, both the 2 and 3 stage versions, a mini-ITS cargo vehicle as a potential Falcon replacement, the ITS and New Armstrong and there isn't much left - all markets covered.

 

Some business for Vulcan to be sure, and Antares 300 could also be competitive at the lower mass to orbit end Falcon 9 v-1.0 covered.

 

I think OrbitalATK will abandon their Ares 1/Liberty clone, and Rocket Lab may well be the up and coming dark horse in the mix. 

  • Like 2

No idea, though easier removal seems obvious. Not likely foldable as that would put legs where the transporter stage clamps for the Octaweb are. Earlier opening and using (part of?) them as airfoils was mentioned. 

  • Like 2

CBS report covers the launch insurance angle of stage wise,

 

http://www.cbsnews.com/news/spacex-launches-comsat-in-historic-flight-with-used-booster/

 

Quote


But [SES's] Halliwell said insurers were convinced the stage was virtually as good as new.

"There was essentially no change in the insurance premium," he said. "That is, I think, the key criteria in the confidence level the (insurance) community sees in the integrity of this mission and the booster itself."

One [insurance] underwriter, speaking on condition of anonymity, told Spaceflight Now that "reused rockets are here to stay."

"It's an interesting balance for us," he said. "It's here to stay. Pretty soon, it's going to be routine. We've had some some very in-depth conversations with SpaceX about their process for re-qualifying, and their process for refurbishment. We're convinced that, number one, they're committed to it, and number two, they're serious about it. So they've done what we wanted them to do."

There was some talk also about emotion coming into play more than actual risk being involved .. which I completely agree with. People were super nervous for all the wrong reasons, and now they can find their safe spaces somewhere else. 

 

[Expletive/descriptive] naysayers ... where are they now ?! Likely looking for their legos and pointy blankets so they can feel their emotions elsewhere. And I'm supportive of that. Let the adults who actually TRY to think outside of the box get our work done. :D 

This is going to put serious heat on ULA/Boeing/LockMart as regards Vulcan "reuse" by way of parachuting the engine bay & engines, catching it with a chopper. This design still needs solid boosters.

 

With Vulcan being being [optimistically] due in 2019 and New Glenn penciled in for 2020/21, it wouldn't surprise me one bit if Vulcan quietly morphs into ULA using a New Glenn first stage under a Centaur. ACES changes to fit. No solid boosters required.

  • Like 1

Yep. And the ship date of Vulcan will continue to slip right as ULA demonstrates its' ability to miss R&D Milestone targets. I agree with you, @DocM -- 2019 was an extremely optimistic date for Vulcan's debut. They haven't even started cutting metal yet. SLS is 2018 and it's already half-built, so that kinda puts things into perspective doesn't it ...

 

My guess is that they're pushing NASA to sign off on the RD-180 without the extra data and it's taking longer than they want. Atlas V isn't going anywhere, methinks ... and if/when we see Vulcan, it'll be the most underwhelming debut ever and the state of Aerospace Engineering will be such that they'll be laughed out of the room for even bothering to build it.

 

SpaceX, meanwhile, will be right in the middle of building the Boca Launch Complex and the ITS build team will be seeing the first shipments of the structural hardware at Hawthorne (?). Things will be happening quickly. :yes: 

28 minutes ago, SALSN said:

Doesn't second stage landing require a fairly significant redesign, with heat shield and other new systems?
I thought they would still be years from the first attempt for that.

They are really speeding up now, so cool!

Well ... depends on how they approach it. If they come in "hot", like a Dragon capsule would, then yeah. It'd require heat shielding and a significant overhaul to be anything more than a melted lump.

 

IF they handle it like the S1, where they do a retrofire burn to slow down a LOT and then do the S1 procedures, then it's gonna be just about the same deal but from a significantly higher altitude and with a lot less fuel to work with (but easier since the S2 weighs far less than the S1 does). This is the scenario I think they'll go with, personally.

Heh ... something that occurs to me. SuperDracos on the S2. :yes: Not that large of a weight gain but they have some serious grunt and better yet they are throttleable. That way the S2 doesn't have to be bothered to save all that much fuel in the main tanks.

 

And it already does a deorbit burn to minimize space junk ... that part is already factored in. The SuperDracos are to help the process along and even let it land. 

 

Get some grid fins and landing legs on it, an S1 landing computer with the software and other bits to make it all work, patch the software so that it'll work on an S2 ... refine it after some simulations ... give her a real-life trial and see what's what. :D 

2 hours ago, SALSN said:

Doesn't second stage landing require a fairly significant redesign, with heat shield and other new systems?
I thought they would still be years from the first attempt for that.

They are really speeding up now, so cool!

 

Thought about this, and the key is Falcon Heavy's ridiculous mass to orbit margin for any payload other than BEO or a GEO commsat the size of a city bus. This let's them play, a lot.

 

A dummy payload could be sized to leave enough propellant for a modest re-entry burn, and given that S2 weighs far less than a Dragon 1 which uses  the small 100 lbf Draco thrusters for this job....that's a pretty modest job.

 

Coat the stage in PICA-X, which in 1.0 trim was just 0.31 grams/cc. Dragon 2's PICA-X 3 is good for about 30,000 mph re-entries from Mars, a much higher heat load which scales with the cube of velocity, so an LEO or GTO re-entry should be duck soup. 

 

Keeping it pointed in the right direction may need thrusters, but if it's not too difficult cold gas should be the lightest option. Those are already on the parts shelf for the booster.

 

Once in the atmosphere deploy a drogue to bleed speed, then deploy a larger version of the fairings GPS parafoil. Those are COTS for up to 10 tonnes and S2 barely weighs 5 tonnes.

 

They've already mentioned landing fairings on what sounds like a giant inflatable raft of some kind, so use one of those to catch it. 

 

360° 4K video of the news conference

 

 

Edited by DocM
This topic is now closed to further replies.
  • Posts

    • But the reality is it will work for people's needs, and they don't care about the technology that makes it. Clearly not everyone's needs, but that low end space where personal laptops were only used to type emails, watch content and browse websites, but they didn't want to do that on a small screen device. Heck, writing that out I can now see the connection and reason it'll do so well. Apple is about experience. If the experience is bad, they don't release it. Low end Windows laptop manufacturers up until this point have not taken that into consideration ever before, so slow laggy usage with brittle slimey plastic shells were common. I hope that the low end space at least creates better physical products that last a bit longer, and if Microsoft get their act together, they could also have a solid OS on such low end hardware that would actually make the experience work for what the hardware was intended for. The fact that the CPU is a "cellphone", sorry mobile phone processor is irrelevant. It's about the experience, and so far, that sounds quite solid.
    • Hello, Bonjour is Apple's implementation of a multicast-DNS service, which allows devices running Apple's software and/or hardware to find each other on your local network.  I believe the Windows version was last updated around 2010. If you do not need it, you can stop and disable the Bonjour service in the Services Control Manager (filename: SERVICES.MSC).  Once you have done that, the operating system will no longer attempt to load the service. Regards, Aryeh Goretsky  
    • This AMD RX 9070 16GB GPU that performs close to Nvidia 5070 is under $600 by Sayan Sen With the memory shortage that's prevalent nowadays, discounts are super-hard to get. As such we post good deals whenever they pop up. Recently, we covered a few great discounts on SSDs wherein you can get a 4TB TeamGroup NVMe PCIe Gen4 drive for just $400 thanks to a special coupon. If you want a faster product but don't need all that capacity, you can also opt for Samsung's 990 PRO 2TB that is on sale for its lowest price in over three months. Let's say though that you are on the hunt for a 1440p gaming card. In that case AMD's RX 9070 non-XT can help, and with its 16GB VRAM, you can also run AI models locally without worrying about bottlenecking (check out our recent 9070 GRE reviews for gaming and productivity to get an idea). The PowerColor Reaper variant of the RX 9070 is currently on sale for just $580 which is a very good price in the current state of affairs (purchase link under the specs table down below). The Reaper cooler on this 9070 uses a triple‑fan design with ring‑blade fans, paired with premium dual ball bearings to extend lifespan and reduce friction. "Intelligent" fan control allows the fans to remain idle at lower temperatures, only spinning up when the GPU is under load. A nickel‑plated copper base makes direct contact with both the GPU and memory modules, helping to spread heat evenly. PowerColor also applies Honeywell PTM7950 phase‑change thermal interface material (TIM), which fills microscopic gaps between the die and heatsink for more efficient thermal transfer. The fan shroud is shorter in height as the firm has made it such that it can be used in certain SFF (small form factor) cases. The technical specifications of the Reaper RX 9070 are given in the table below: Specification Value Stream Processors 3584 Units Video Memory 16GB GDDR6 Memory Speed 20.0 Gbps Memory Interface 256-bit Engine Clock Game Clock: up to 2070 MHz Boost Clock: up to 2520 MHz Bus Standard PCI Express 5.0 x16 Display Connectors 1 x HDMI 2.1b, 3 x DisplayPort 2.1a Maximum Resolution DisplayPort: 7680 × 4320 HDMI: 7680 × 4320 Board Dimensions 289mm × 111mm × 41mm 304mm × 127mm × 42mm (with bracket) Slot 2 Minimum System Power Requirement 600W Power Connectors Two 8-pin PCI Express Get the PowerColor Reaper RX 9070 at the links below (you get only a 90-day warranty on Woot): PowerColor Reaper Radeon RX 9070 16GB Graphics Card (RX9070 16G-A): $579.99 (Sold and Shipped by Amazon US) (Was: $700) PowerColor Reaper Radeon RX 9070 16GB Graphics Card (RX9070 16G-A): $559.99 (Sold and Shipped by Woot US) Good to know This Amazon deal is U.S. specific, and not available in other regions unless specified. We only use first-party seller links (at the time of article publishing); ensure that you purchase from a first-party seller link only. Check out Today's Deals on Amazon | or our recent tech deals. Become a Prime member (for Students or SNAP) via Neowin Get Prime Access - Prime for half price (for qualifying Medicaid, EBT, SNAP) Subscribe to Prime Video, Audible Plus, Music Unlimited or Kindle Unlimited via Neowin As an Amazon Associate, we earn from qualifying purchases.
    • Are they marketed as an entry into astronomy or astrophotography? I do astrophotography. With big rigs, lots of computers, cables and headaches. I love it. And by learning this ridiculously complex hobby, I’ve learned about the objects I’m shooting. Astronomy followed from photography.
    • Microsoft confirms Recycle Bin bug across all versions of Windows by Usama Jawad A couple of days ago, we reported that the latest Patch Tuesday update has seemingly resulted in a lot of issues for many users, including OneDrive and Dropbox access problems, BitLocker recovery lockouts, and BSODs. Although Microsoft is yet to acknowledge these bugs, it has confirmed another, relatively smaller issue across all supported versions of Windows. In an update on its Windows Release Health Dashboard, Microsoft has confirmed that after installing June's Patch Tuesday update (KB5094126), you'll experience unexpected behavior when leveraging Recycle Bin. Basically, when you attempt to delete an item from the Recycle Bin, the confirm dialog will show you the internal file name of that content rather than the actual name. For example, the file may be named abc.png, but the confirm dialog will ask if you're sure that you want to permanently delete $Rxxxxx.png from the Recycle Bin. This is pretty much it for the scope of the bug itself; it just displays the wrong name in the confirm dialog. The correct name will be shown in the list view of the Recycle Bin and if you restore the file, it will return with the correct name as well. This issue affects pretty much all supported versions of Windows client and server, including: Client: Windows 11, version 26H1; Windows 11, version 25H2; Windows 11, version 24H2; Windows 11, version 23H2; Windows 10, version 22H2; Windows 10 Enterprise LTSC 2021; Windows 10 Enterprise LTSC 2019; Windows 10 Enterprise LTSB 2016 Server: Windows Server 2025; Windows Server 2022; Windows Server 2019; Windows Server 2016; Windows Server 2012 R2; Windows Server 2012 As things currently stand, Microsoft is working on a concrete solution that will be released in a "future" Windows update. It remains to be seen if the firm will wait till the next Patch Tuesday or roll out an out-of-band (OOB) fix. The good news is that commercial customers can deploy a workaround right now, but they will have to reach out to Microsoft Support for Business for additional details.
  • Recent Achievements

    • Week One Done
      Jordan Smith earned a badge
      Week One Done
    • Reacting Well
      BizSAR earned a badge
      Reacting Well
    • First Post
      AndreaB earned a badge
      First Post
    • Week One Done
      Huge Trailer earned a badge
      Week One Done
    • Week One Done
      Classifyskilleducation earned a badge
      Week One Done
  • Popular Contributors

    1. 1
      +primortal
      578
    2. 2
      +Edouard
      184
    3. 3
      PsYcHoKiLLa
      75
    4. 4
      Michael Scrip
      72
    5. 5
      neufuse
      64
  • Tell a friend

    Love Neowin? Tell a friend!